Renovation, reconstruction and construction of the Island Bridge Complex, Stage 1 (Q3057583): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying co-finance rate with the percentage)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Reconstruction, reconstruction et construction du complexe du pont insulaire, 1ère étape

Revision as of 20:32, 25 November 2021

Project Q3057583 in Latvia
Language Label Description Also known as
English
Renovation, reconstruction and construction of the Island Bridge Complex, Stage 1
Project Q3057583 in Latvia

    Statements

    0 references
    0 references
    8,231,399.89 Euro
    0 references
    9,683,999.86 Euro
    0 references
    85.0 percent
    0 references
    13 February 2017
    0 references
    12 June 2020
    0 references
    Rīgas pilsētas pašvaldība
    0 references
    0 references
    0 references

    56°56'57.84"N, 24°6'18.65"E
    0 references
    Projekta ietvaros plānots realizēt sekojošas aktivitātes:1) Būvdarbi I kārtas objektiem:(a) Tilta pār Daugavu, (b) tilta pār Mazo Daugavu, (c) Zaķusalas uzbēruma posma un (d) esošā tilta pār Bieķengrāvi lejtecē atjaunošana, kā arī jauna tilta pār Bieķengrāvi lejtecē izbūve;2) Autoruzraudzība, atbilstoši būvprojektiem:(a) tiltiem pār Daugavu un Mazo Daugavu, Zaķusalas uzbērumam, (b) tiltiem pār Bieķengrāvi lejtecē; 3) Būvuzraudzība, augstāk minēto objektu atjaunošanas, pārbūves un izbūves laikā;4) Projektēšana:II kārtas objektiem – (a) satiksmes pārvads pār Krasta ielu, (b) satiksmes pārvads Lucavsalā, t.sk. Zaķusalas estakādes, (c) tilts pār Bieķengrāvi augštecē, (d) estakāde pār Bieķengrāvi un Salu tilta kompleksa pievedceļi. 5) Informatīvie / publicitātes pasākumi:(a) pagaidu un pastāvīgā informatīvā stenda uzstādīšana, (b) informācija masu medijiem, ziņas Projekta iesniedzēja mājas lapā.Projekta I kārtas objektu būvniecībai uzsākta 2014.gada nogalē un turpināsies līdz 2020.gada II ceturksnim ieskaitot. Projektā plānotās izmaksas, t.sk. 21% PVN:Kopējās - EUR 15 088 567.46 Attiecināmās - EUR 9 880 882.18Neattiecināmās - EUR 5 207 685.28Kohēzijas fonda līdzfinansējuma apmērs 85% no attiecināmām izmaksām, t.i. EUR 8 398 749.85.Projekta īstenošanas rezultātā tiks izstrādāti astoņi būvprojekti / projektu dokumentācija Salu tilta II kārtas objektiem un veikta to ekspertīze, izbūvēti četri Salu tilta kompleksa I kārtas objekti un veikta būvniecības autoruzraudzība un būvuzraudzība.Projekts paredz savienot pilsētas daļas, kas atdalītas ar dabīgi veidotiem šķēršļiem un sasaista pilsētu ar Eiropas TEN-T autoceļu tīklu, rezultātā radot ieguvumus mērķa grupām - sakārtota tranzītkravu kustība Daugavas kreisajā krastā, palielināta transporta tīkla caurlaides spēja, samazināts satiksmes dalībnieku patērētais laiks, samazinātas automobiļu autokilometra izmaksas, samazināts CSNg skaits, u.c. (Latvian)
    0 references
    Within the framework of the project it is planned to implement the following activities: 1) Construction works for stage I objects:(a) renewal of the bridge over the Daugava River, (b) the bridge over the Maza Daugava, (c) construction of the Zaķusala embankment and (d) the existing bridge over the Bieķengrāvi downhill; 3) Construction supervision, during renovation, reconstruction and construction of the above mentioned objects;4) Designing:II objects – (a) traffic transmission over Krasta Street, (b) traffic transmission in Lucavsala, incl. Zaķusala escade, (c) the bridge over the top of the Biekhangarave, (d) the escade over the Byķengarave and the access road to the Salu Bridge Complex. 5) Informative/publicity measures:(a) installation of a temporary and permanent information stand, (b) information for mass media, news on the project applicant’s website.The project for the construction of Stage I objects was commenced at the end of 2014 and will continue until the 2020 quarter inclusive. Estimated costs of the project, including 21 % VAT:Total – EUR 15 088 567.46 Ineligible – EUR 9 880 882.18Ineligible – EUR 5 207 685.28Cohesion fund co-funding 85 % of the eligible costs, i.e. EUR 8 398 749.85.The project will result in eight construction projects/project documentation The project will result in the development of eight construction projects/project documentation for the objects of the Salu Bridge II and their expertise, the construction of four Long Island Bridge Set I objects, the auto-car supervision and construction supervision carried out.The project will result in reduced road-to-mobile and reduced time of the network with the city-to-local barriers.The project is designed to connect the road with the road sections of Stage I, as well as auto supervision of construction and construction supervision. (English)
    15 July 2021
    0 references
    Rīga
    0 references
    Rīga
    0 references
    Rīga
    0 references
    Rīga
    0 references

    Identifiers

    6.1.3.1/16/I/001
    0 references