Increasing the efficiency of the existing boiler house in Madona county in Dzelzava (Q3057262): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying co-finance rate with the percentage) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Accroître l’efficacité des chaufferies existantes dans le district de Madona Dzelzava |
Revision as of 20:30, 25 November 2021
Project Q3057262 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Increasing the efficiency of the existing boiler house in Madona county in Dzelzava |
Project Q3057262 in Latvia |
Statements
238,915.32 Euro
0 references
613,268.9 Euro
0 references
38.96 percent
0 references
3 April 2018
0 references
2 February 2020
0 references
Sabiedrība ar ierobežotu atbildību "Madonas Siltums"
0 references
SIA „Madonas siltums” projektu īsteno, lai uzlabotu esošo Dzelzavas pagasta katlu māju darbības efektivitāti, tādā veidā nodrošinot nepārtrauktu un stabilu siltumenerģijas piegādi esošajiem un potenciāli jaunajiem patērētājiem, lai samazinātu vai noturētu siltumenerģijas izmaksas pašreizējā līmenī, kā arī paaugstinātu uzņēmuma vērtību. Analizējot esošo situāciju, secināms, ka, lai siltuma ražošana Dzelzavas pagastā darbotos efektīvi, nepieciešams veikt divu esošo centralizētās siltumapgādes sistēmu apvienošanu (Dzelzavas ciema siltumapgādes sistēma un Aizpurves ciema siltumapgādes sistēma), kā arī rekonstruēt esošo Dzelzavas ciema katlu māju. Dotajā siltumenerģijas ražošanas objektu modernizācijas projektā tiek paredzēta virkne pasākumu:•Papildus esošiem 2gab. malkas ūdens sildāmajiem katliem „ORIONS” 2H2M ar uzstādīto siltuma jaudu 1,0 MW katram, uzstāda jaunu šķeldas katlu ar siltuma jaudu 1,2 MW;•Pie esošās katlu mājas izbūvē šķeldas noliktavu ar kustīgām grīdām un šķeldas padeves sistēmām;•Atteikties no esošās Dzelzavas pagasta Aizpurves ciema katlu mājas ekspluatācijas;•Izbūvēt siltumtrašu saistvadu, lai apvienotu Dzelzavas pagasta divas esošās neatkarīgās centralizētās siltumapgades sistmas (Dzelzavas ciems un Aizpurves ciems);•Veikt esošo katlu mājas siltumtīklu sūkņu nomaiņu, lai nodrošinātu nepieciešamo hidraulisko režīmu apvienotajās centralizētajās siltumapgādes sistēmās.Projekta rezultātā:•Dzelzavas pagasta katlu māju kopējais lietderības koeficents palielināsies no 61,02% uz 87%;•Tiks uzstādīts jauns šķeldas katls ar siltuma jaudu 1,2MW un lietderības koeficientu 87%;•Esošie ūdenssildāmie katli paliks rezervē – avārijas gadījumiem;•Samazināsies siltuma ražošanas iekārtu ietekme uz vidi.Paredzams, ka projekts tiks īstenots 22 mēnešu laikā no līguma ar CFLA noslēgšanas brīža par KF līdzfinansējuma piesaisti. Tā kopējās izmaksas varētu sasniegt ap EUR 984051,69, no kā aptuveni EUR 251 194 sastādīt KF līdzfinansējums. (Latvian)
0 references
SIA “Madonas siltums” implements the project in order to improve the operational efficiency of existing boiler houses of the Ironava parish, thus ensuring continuous and stable supply of thermal energy to existing and potential new customers in order to reduce or keep thermal energy costs at the current level, as well as to increase the company’s value. Analysing the current situation, it can be concluded that in order for the production of heat in the Ironava parish to work effectively, it is necessary to combine two existing district heating systems (heating system of Dzelzava village and heating system of Aizpurve village), as well as to reconstruct the existing boiler house in Dzelzava village. The project of upgrading thermal energy objects provides for a number of measures:•In addition to the existing 2pcs for water heated boilers “Orions” 2H2M with installed heat output of 1.0 MW each, installs a new woodchip boiler with heat output 1,2 MW;•Off the existing conduit lighthouses in the heating system•Construct the thermal energy storage with moving boilers and chips for the supply systems;•Deliver from the existing Iron of Manufactured Lighthouses to the district of the building.•Connect the heating in the building with the cable storage with moving boilers and chips for the supply systems;•Describing from the existing Iron Lighthouses to the outlet of the district.•Constituting the heating system.•Buishable boilers for heating systems;•Exit for the existing consumable boilers.Conditional installation of the heating system.•Conditional heating house building with installed heating boilers with installed heat supply systems;•Bake out of the existing consumable heating boiler with a heat output of 1.2 MW.Contracting the heating system on the heating system•Containing the boilers in the storage with moving boilers and chips for the installation of the heating system;•Deliver out of the existing Iron of the Ciling Lightings from the Outside of the Customer Lighthouses.•Continuating the building with the cable storage with moving boilers and chips supply systems;•Deliver out from the existing Iron Cover-loaded Lighthouses from the Outdoor-Use of the heating system.•Consurable in the heating house.•Consulate the thermal storage with moving boilers and chips supply systems;•Deliver from the existing Iron of the production of the cables from the lighthouses.Constituted on the districts of the heating system•Constructing the boilers in the storage spacehouse with moving boilers and chips supply systems;•Deliver out of the existing conduits for the production of the lighthouses from the outlets.Connect the heating system from the heating system•Construct the thermal energy storage with moving boilers and chips for the supply systems;•Exhibiling from the existing Iron of the production of the outdoors.Connect the heating system from the external heating system.•Constructing the thermal energy into the house.•Blu for the thermal boilers with the installed heat supply systems;•Deliver for a new woodchip boiler with a heat output of 1,2 MW;Constituting the existing boilers in the heating house•Inclu in the storage of the chips with the installed heating boilers of 1.0 MW;Oblining a new woodchip boiler with a heat output of 1.2 MW;•Contracting the conduit of the heating of the heating boilers.•Including the building with the installed thermal capacity of 1,0 MW each, installing a new woodchip boiler with a heat output of 1.2 MW;•At the existing heating system.•Consurfault of the building with the thermalthouthouses with the installed heat of the boilers with the installation of the heating system;•Delivering from the existing woodchip boiler with a heat output of 1,2 MW;The constitutive of the heating house•Includes the storage of the chips with the installed heating boilers with the power supply systems;•Exhibit for the existing Iron of the Coverheading and the Connected Club of the Outside of the Lighthouses•Constructing the heating house•Include the storage with moving boilers and chipsets for the installation of the heating boilers with heat output of 1,2 MW;Consuying the conduits of the production of the lighthouse from the heating system•Containing the thermal boilers in the storage with the installed heating boilers with the installed heating boilers with a thermal output of 1,2 MW;The constitutive power of the existing consumables.Conducting the Its total cost could amount to around EUR 984051.69, of which the CF co-funding some EUR 251 194. (English)
15 July 2021
0 references
Kļavu iela 6A, Dzelzava, Dzelzavas pag., Madonas nov., LV-4873
0 references
Identifiers
4.3.1.0/17/A/070
0 references