Reconstruction of Item 1 — Studies and Works (Q3713406): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3776344 / rank
 
Normal rank

Revision as of 19:25, 24 November 2021

Project Q3713406 in France
Language Label Description Also known as
English
Reconstruction of Item 1 — Studies and Works
Project Q3713406 in France

    Statements

    0 references
    2,518,127.5 Euro
    0 references
    4,197,545.85 Euro
    0 references
    59.99 percent
    0 references
    1 March 2019
    0 references
    1 March 2020
    0 references
    GRAND PORT MARITIME DE LA REUNION
    0 references
    0 references
    Suite à l’étude de faisabilité, la première solution a été retenue par le maître d'ouvrage à l'issu du rapport d'étude. Cette solution consiste à démolir le tablier construit en 1957 jusqu'au niveau du corbeau réalisé en 2ème phase en 1965. (French)
    0 references
    Following the feasibility study, the first solution was chosen by the contracting authority on the basis of the study report. This solution consists of demolishing the apron built in 1957 to the level of the raven made in the second phase in 1965. (English)
    22 November 2021
    0 references

    Identifiers

    RE0018406
    0 references