Ilôt de senescence network in ancient forests — Phase 1 (Q3702295): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q3761863 / rank | |||
Normal rank |
Revision as of 19:15, 24 November 2021
Project Q3702295 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Ilôt de senescence network in ancient forests — Phase 1 |
Project Q3702295 in France |
Statements
22,565.0 Euro
0 references
45,131.76 Euro
0 references
50.0 percent
0 references
15 March 2017
0 references
30 June 2019
0 references
Conservatoire d'Espaces Naturels d'Auvergne
0 references
Le projet RIFA a pour objectif la constitution d'un réseau d'îlots de sénescence en forêts anciennes représentatifs de la diversité des types forestiers auvergnats. il comprend: - la réalisation d'un état des lieux du réseau d'ilots de sénescence en forêt ancienne déjà existant en Auvergne - l'analyse des territoires de forêts anciennes et types forestiers retenus pour améliorer et renforcer le réseau d'ilots de sénescence existant, - la priorisation et hiérarchisation des parcelles pour la constitution du réseau. C'est la partie la plus importante du projet. Elle consiste à sélectionner les parcelles d'actions prioritaires en se basant sur les résultats de la phase précédente. Il est prévu de réaliser un diagnostic écologique et foncier en vue de hiérarchiser les futures parcelles constitutives des ilots et de replacer celles-ci dans la trame forestière des SRCE. (French)
0 references
The objective of the RIFA project is to establish a network of islets of senescence in old forests representative of the diversity of auvergnat forest types. It includes: — carrying out a survey of the network of senescence ilots in old forest already existing in Auvergne — an analysis of the territories of old forests and forest types chosen to improve and strengthen the existing network of senescence ilots, — prioritisation and prioritisation of plots for the establishment of the network. This is the most important part of the project. It consists of selecting priority action parcels based on the results of the previous phase. It is planned to carry out an ecological and land diagnosis with a view to prioritising future plots of the ilots and placing them in the forest frame of the SRCE. (English)
22 November 2021
0 references
Identifiers
MC0012841
0 references