Cycling facilities on Javary Street, Fives Bridge and Pierre Legrand Street in Lille (Q3688146): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3771531 / rank
 
Normal rank

Revision as of 17:31, 24 November 2021

Project Q3688146 in France
Language Label Description Also known as
English
Cycling facilities on Javary Street, Fives Bridge and Pierre Legrand Street in Lille
Project Q3688146 in France

    Statements

    0 references
    193,673.0 Euro
    0 references
    997,800.35 Euro
    0 references
    19.41 percent
    0 references
    31 August 2017
    0 references
    31 December 2018
    0 references
    Métropole Européenne de Lille
    0 references
    0 references
    La MEL prévoit l'aménagement du réseau modes doux sur le secteur Javary-Fives-Legrand à Lille afin d'offrir un itinéraire continu et sécurisé aux usagers sur une longueur de près d'un kilomètre. L'élargissement des trottoirs, la sécurisation des traversées, la réalisation de pistes cyclables et la connexion avec le réseau existant permettront d'effacer les coupures urbaines créer par les axes ferrés et routiers et d'inciter ainsi les déplacements à vélo ou à pied. (French)
    0 references
    The MEL plans the development of the soft-mode network on the Javary-Fives-Legrand sector in Lille in order to offer a continuous and secure route for users over a length of almost one kilometre. Widening sidewalks, securing crossings, building cycle paths and connecting with the existing network will remove urban cuts created by rail and road roads and thus encourage cycling and walking. (English)
    22 November 2021
    0 references

    Identifiers

    NP0012959
    0 references