Animation and operational implementation 2016 of the Bourbince territorial contract (Q3694864): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3772596 / rank
 
Normal rank

Revision as of 17:25, 24 November 2021

Project Q3694864 in France
Language Label Description Also known as
English
Animation and operational implementation 2016 of the Bourbince territorial contract
Project Q3694864 in France

    Statements

    0 references
    15,845.02 Euro
    0 references
    79,225.1 Euro
    0 references
    20.0 percent
    0 references
    1 January 2016
    0 references
    31 December 2016
    0 references
    Syndicat intercommunal du bassin versant de la Bourbince (SIBVB)
    0 references
    0 references
    le SIBVB a procédé à un état des lieux en 2012 sur les 42 communes du bassin versant de la Bourbince. Cela a conduit à l'élaboration d'un contrat territorial. Initialement prévue fin 2014, la signature définitive du contrat territorial est intervenue en juin 2015. Deux postes sont dédiés aux missions de mise en oeuvre de ce contrat territorial : un chargé de mission (animateur principal du Contrat Territorial) et un technicien de rivière. (French)
    0 references
    SIBVB carried out an inventory of the 42 communes in the Bourbince watershed in 2012. This led to the development of a territorial contract. Initially scheduled for late 2014, the final signature of the territorial contract took place in June 2015. Two posts are dedicated to the implementation tasks of this territorial contract: a staff member (lead facilitator of the Territorial Contract) and a river technician. (English)
    22 November 2021
    0 references

    Identifiers

    BG0002634
    0 references