Facilities for the EMP of Saint-Brieuc (Q3687825): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q3770845 / rank | |||
Normal rank |
Revision as of 16:30, 24 November 2021
Project Q3687825 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Facilities for the EMP of Saint-Brieuc |
Project Q3687825 in France |
Statements
1,254,543.47 Euro
0 references
6,400,732.0 Euro
0 references
19.6 percent
0 references
1 May 2016
0 references
31 December 2018
0 references
CA SAINT-BRIEUC ARMOR AGGLOMERATION
0 references
Dans le cadre de la transformation de la gare de Saint-Brieuc en pôle d'échanges multimodal (PEM), ce projet comprend en la création d'une passerelle piétonne permettant de traverser le faisceau ferroviaire et d'accéder aux quais ainsi que la création d’un parvis au Sud des voies ferrées en miroir du parvis Nord existant. (French)
0 references
As part of the transformation of the Saint-Brieuc train station into a multimodal exchange hub (PEM), this project includes the creation of a pedestrian walkway to cross the railway beam and access to the platforms, and the creation of a foreword to the south of the tracks mirroring the existing North square. (English)
18 November 2021
0 references
SAINT-BRIEUC
0 references
Identifiers
2014FR16M2OP003-655
0 references