Energy renovation of 34 social rental units located 7bis, 9bis and 11 bis Rue Chateaubriand in Plaisance du Touch (31) (Q3682893): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3769171 / rank
 
Normal rank

Revision as of 16:25, 24 November 2021

Project Q3682893 in France
Language Label Description Also known as
English
Energy renovation of 34 social rental units located 7bis, 9bis and 11 bis Rue Chateaubriand in Plaisance du Touch (31)
Project Q3682893 in France

    Statements

    0 references
    116,982.96 Euro
    0 references
    259,962.13 Euro
    0 references
    45.0 percent
    0 references
    1 October 2017
    0 references
    30 November 2021
    0 references
    S.A. PROMOLOGIS
    0 references
    0 references
    Le projet concerne la rénovation énergétique par la S.A. Promologis de 34 logements sociaux locatifs situés 7bis, 9bis et 11 bis rue Chateaubriand à Plaisance du Touch (31). La période prévisionnelle d'exécution de l'opération s'étend du 01/10/2017 au 31/05/2021.Les objectifs recherchés sont de réhabiliter le patrimoine immobilier en optimisant la performance énergétique des logements, réduire la facture énergétique des locataires et lutter contre la précarité énergétique, améliorer le confort thermique et le confort d’utilisation, réduire les émissions de gaz à effet de serre. Le résultat escompté est le passage d’une étiquette avant travaux D : 218KW/m2 CEP à une étiquette B : 77 KW/m2 CEP après travaux. D’après l'audit énergétique fourni dans le dossier de demande d’aide, les travaux devraient engendrer un gain énergétique de près de 65 %. (French)
    0 references
    The project concerns the energy renovation by S.A. Promologis of 34 rental social housing units located 7bis, 9bis and 11 bis rue Chateaubriand in Plaisance du Touch (31). The planned period of execution of the operation runs from 01/10/2017 to 31/05/2021.The objectives are to rehabilitate the building assets by optimising the energy performance of the dwellings, reduce the energy bill of tenants and combat energy poverty, improve thermal comfort and comfort of use, reduce greenhouse gas emissions. The expected result is the passage of a label before work D: 218KW/m² CEP to a B label: 77 KW/m² CEP after work. According to the energy audit provided in the aid application file, the work is expected to generate an energy gain of almost 65 %. (English)
    18 November 2021
    0 references

    Identifiers

    MP0017732
    0 references