Energy renovation of 38 rental social housing units located 7 rue Sylvain Dauriac in Pins-JUSTARET (31) (Q3682890): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q3769171 / rank | |||
Normal rank |
Revision as of 16:25, 24 November 2021
Project Q3682890 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of 38 rental social housing units located 7 rue Sylvain Dauriac in Pins-JUSTARET (31) |
Project Q3682890 in France |
Statements
178,922.48 Euro
0 references
397,605.51 Euro
0 references
45.0 percent
0 references
18 December 2017
0 references
31 October 2021
0 references
S.A. PROMOLOGIS
0 references
Le projet concerne la rénovation énergétique par la S.A. Promologis de 38 logements sociaux locatifs situés 7 rue Sylvain Dauriac à Pins-Justaret (31). La période prévisionnelle d'exécution de l'opération s'étend du 18/12/2017 au 30/04/2021. Les objectifs recherchés sont de réhabiliter le patrimoine immobilier en optimisant la performance énergétique des logements, réduire la facture énergétique des locataires et lutter contre la précarité énergétique, améliorer le confort thermique et le confort d’utilisation, réduire les émissions de gaz à effet de serre. Le résultat escompté est le passage d’une étiquette avant travaux D : 217KW/m2 CEP à une étiquette B : 73 KW/m2 CEP après travaux. D’après l'audit énergétique fourni dans le dossier de demande d’aide, les travaux devraient engendrer un gain énergétique de près de 66 %. (French)
0 references
The project concerns the energy renovation by S.A. Promologis of 38 rental social housing units located 7 rue Sylvain Dauriac in Pins-JUSTARET (31). The estimated period of execution of the operation runs from 18/12/2017 to 30/04/2021. The objectives are to rehabilitate the property by optimising the energy performance of housing, reducing the energy bill of tenants and combating energy poverty, improving thermal comfort and comfort in use, and reducing greenhouse gas emissions. The expected result is the passage of a label before work D: 217KW/m² CEP to a B label: 73 KW/m² CEP after work. According to the energy audit provided in the aid application file, the work is expected to generate an energy gain of almost 66 %. (English)
18 November 2021
0 references
Identifiers
MP0017734
0 references