2020 — Demolition of the Drawing Pavilion site in Cherbourg (Q3680309): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q3764498 / rank | |||
Normal rank |
Revision as of 15:44, 24 November 2021
Project Q3680309 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | 2020 — Demolition of the Drawing Pavilion site in Cherbourg |
Project Q3680309 in France |
Statements
161,000.00 Euro
0 references
700,000.0 Euro
0 references
23.0 percent
0 references
1 October 2019
0 references
30 December 2021
0 references
ETS PUB FONCIER DE NORMANDIE
0 references
76000
0 references
Les bâtiments du site Pavillon Tiroir situés 4 et 10 à 16 rue de l’Hermitage à Cherbourg ont été construits entre mi 1960 et la fin des années 70.Le site est composé de 4 parcelles et se décompose comme suit :- AW272, AW146 : Bâtiment en R+3 fortement dégradé et impacté fortement par l’amiante : 1 766 m² de surface plancher- AW14 : Ancienne maison d’habitation en R+1 + comble : 190 m² de surface plancher- AW487 : chemin d’accès , parcelle non bâtiLes bâtiments étaient utilisés comme locaux administratifs pour l’hôpital et à usage d’habitation pour son personnel. Au vu de la politique du CHPC pour améliorer l’accueil, l’intégration et la formation des internes, le CHPC dispose d’un parc de logement vieillissant et insuffisant, dispersé sur les différents établissements et peu propice au développement d’un esprit collectif. L’espace libéré par la déconstruction des anciens bâtiments pourrait permettre la construction d’un bâtiment à usage d’habitation d’une capacité de 60 studios permettrait de répondre de manière plus adaptée qu’aujourd’hui aux souhaits de ces futurs professionnels. Entre la demande d’intervention et le début des missions d’études, le Plan de Prévention des Risques Naturels (PPRN), en cours d'adoption à Cherbourg, présage des contraintes importantes sur le terrain retenu au regard du risque inondations. Les bâtiment étant devenus obsolètes, fortement dégradés et présentant un impact fort de l’amiante, le désamiantage et la déconstruction ont été programmésDe ce fait, et au vu de cette contrainte, un espace de stationnement dédié au CHPC sera finalement réalisé. (French)
0 references
The buildings of the Drawing Pavilion site located 4 and 10 to 16 rue de l’Hermitage in Cherbourg were built between mid 1960 and the late 1970s.The site consists of 4 plots and breaks down as follows:- AW272, AW146: Building in R+ 3 severely degraded and impacted by asbestos: 1 766 m² floor area- AW14: Old house in R+ 1 + full: 190 m² floor area- AW487: access Road, Unbuilt ParcelThe buildings were used as administrative premises for the hospital and for residential use for its staff. In the light of the CHPC’s policy to improve the reception, integration and training of interns, the CHPC has an ageing and insufficient housing stock, dispersed across the various institutions and not conducive to the development of a collective spirit. The space freed up by the deconstruction of the old buildings could allow the construction of a dwelling-use building with a capacity of 60 studios would be able to respond in a more appropriate way than today to the wishes of these future professionals. Between the request for action and the start of the study missions, the Natural Risk Prevention Plan (PPRN), currently being adopted in Cherbourg, foreshadows the major constraints in the field identified in view of the risk of flooding. As the buildings have become obsolete, severely degraded and have a strong impact of asbestos, asbestos removal and deconstruction have been programmed. Therefore, in view of this constraint, a parking space dedicated to the CHPC will be realised. (English)
18 November 2021
0 references
Identifiers
20E01002
0 references