High quality vocational education in the Giżycki unit, in cooperation with entrepreneurs (Q132882): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project focuses on the development of an educational infrastructure used by students from the Group of Electronic Schools and Information Education in Gżysk, in the school building and in the Centre for Practical Education (CKP). In the school building on the first floor, a vocational training workshop will be created: economic and accounting techniques, office techniques, drawing of technical and computer-aided design, communication in a fo...)
Property / summary
 
The project focuses on the development of an educational infrastructure used by students from the Group of Electronic Schools and Information Education in Gżysk, in the school building and in the Centre for Practical Education (CKP). In the school building on the first floor, a vocational training workshop will be created: economic and accounting techniques, office techniques, drawing of technical and computer-aided design, communication in a foreign language. The establishment of staff consists of the completion of the renovation of premises, electrical and logical installations, lighting, equipment for school equipment and modern teaching aids and ICT tools, in accordance with the list of KOZUs for these staff. The school building will convert toilets according to sanitary requirements, set up a toilet for disabled, installed a stairs for the disabled. The ground floor and first floor will be reassembled in accordance with the principles of universal design. A toilet for disabled people will be created in the CKP building, the position for the testing of diesel engines and the supplemented isolation of the foundations. CKP: the construction and operation of vehicles, electronics and electronics, the operation of mechatronics equipment and systems will be equipped with educational equipment to achieve the skills needed in the enterprises of waterborne transport, as well as in the production and processing of food. Method of implementation: entrusting and controlling the execution of works and supplies of equipment to economic operators selected by means of public procurement contracts. The construction work and equipment for the school building will be carried out in 2017. The equipment of the CKP will be carried out in 2018. The project will result in a better alignment of the conditions of vocational training at the school with the needs of shipping and food production and processing companies, which will increase the interest in these forms of education and thus the number of graduates, which is in line with the objectives set out in the SZOOP ROP WiM for this sub-Action. (English)
Property / summary: The project focuses on the development of an educational infrastructure used by students from the Group of Electronic Schools and Information Education in Gżysk, in the school building and in the Centre for Practical Education (CKP). In the school building on the first floor, a vocational training workshop will be created: economic and accounting techniques, office techniques, drawing of technical and computer-aided design, communication in a foreign language. The establishment of staff consists of the completion of the renovation of premises, electrical and logical installations, lighting, equipment for school equipment and modern teaching aids and ICT tools, in accordance with the list of KOZUs for these staff. The school building will convert toilets according to sanitary requirements, set up a toilet for disabled, installed a stairs for the disabled. The ground floor and first floor will be reassembled in accordance with the principles of universal design. A toilet for disabled people will be created in the CKP building, the position for the testing of diesel engines and the supplemented isolation of the foundations. CKP: the construction and operation of vehicles, electronics and electronics, the operation of mechatronics equipment and systems will be equipped with educational equipment to achieve the skills needed in the enterprises of waterborne transport, as well as in the production and processing of food. Method of implementation: entrusting and controlling the execution of works and supplies of equipment to economic operators selected by means of public procurement contracts. The construction work and equipment for the school building will be carried out in 2017. The equipment of the CKP will be carried out in 2018. The project will result in a better alignment of the conditions of vocational training at the school with the needs of shipping and food production and processing companies, which will increase the interest in these forms of education and thus the number of graduates, which is in line with the objectives set out in the SZOOP ROP WiM for this sub-Action. (English) / rank
 
Normal rank

Revision as of 13:12, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
High quality vocational education in the Giżycki unit, in cooperation with entrepreneurs
Project in Poland financed by DG Regio

    Statements

    0 references
    1,587,869.14 zloty
    0 references
    381,088.59359999996 Euro
    13 January 2020
    0 references
    1,924,503.51 zloty
    0 references
    461,880.84239999996 Euro
    13 January 2020
    0 references
    82.9 percent
    0 references
    11 October 2016
    0 references
    31 August 2018
    0 references
    POWIAT GIŻYCKI
    0 references

    54°2'10.0"N, 21°45'58.0"E
    0 references
    Przedmiotem projektu jest rozwój infrastruktury edukacyjnej, z której korzystają uczniowie Zespołu Szkół Elektronicznych i Informatycznych w Giżycku w budynku szkoły i w Centrum Kształcenia Praktycznego (CKP). W budynku szkoły na I piętrze zostaną utworzone pracownie kształcenia zawodowego: ekonomiczno-rachunkowa, techniki biurowej, rysunku technicznego i komputerowego wspomagania projektowania, komunikacji w języku obcym. Tworzenie pracowni polega na wykonaniu remontu pomieszczeń, instalacji elektrycznych i logicznych, oświetlenia, wyposażenia w sprzęt szkolny i nowoczesne pomoce dydaktyczne i narzędzia TIK według wykazu KOWEZIU dla tych pracowni. W budynku szkoły zostaną przebudowane toalety według wymogów sanitarnych, utworzona toaleta dla niepełnosprawnych, zainstalowana platforma schodowa dla niepełnosprawnych. Parter i I piętro zostaną wyremontowane zgodnie z zasadami uniwersalnego projektowania. W budynku CKP zostanie utworzona toaleta dla niepełnosprawnych, stanowisko do badania silników diesla oraz uzupełniona izolacja fundamentów. Pracownie CKP: budowy i eksploatacji pojazdów samochodowych, elektrotechniki i elektroniki, eksploatacji urządzeń i systemów mechatronicznych zostaną doposażone w sprzęt dydaktyczny umożliwiający uzyskanie umiejętności niezbędnych w firmach transportu wodnego oraz produkcji i przetwórstwa żywności. Sposób wdrażania: powierzanie i kontrola wykonania robót budowlanych i dostaw sprzętu wykonawcom wyłonionym poprzez zamówienia publiczne. Roboty budowlane i wyposażenie pracowni w budynku szkolnym zostaną wykonane w roku 2017. Wyposażenie pracowni w CKP zostanie zrealizowane w roku 2018. Rezultatem projektu będzie lepsze dostosowanie warunków kształcenia zawodowego w szkole potrzeb przedsiębiorstw transportu wodnego oraz produkcji i przetwórstwa żywności co zwiększy zainteresowanie tymi formami kształcenia a tym samym liczbę absolwentów szkoły , co jest zgodne z założeniami określonymi w SZOOP RPO WiM dla tego poddziałania. (Polish)
    0 references
    The project focuses on the development of an educational infrastructure used by students from the Group of Electronic Schools and Information Education in Gżysk, in the school building and in the Centre for Practical Education (CKP). In the school building on the first floor, a vocational training workshop will be created: economic and accounting techniques, office techniques, drawing of technical and computer-aided design, communication in a foreign language. The establishment of staff consists of the completion of the renovation of premises, electrical and logical installations, lighting, equipment for school equipment and modern teaching aids and ICT tools, in accordance with the list of KOZUs for these staff. The school building will convert toilets according to sanitary requirements, set up a toilet for disabled, installed a stairs for the disabled. The ground floor and first floor will be reassembled in accordance with the principles of universal design. A toilet for disabled people will be created in the CKP building, the position for the testing of diesel engines and the supplemented isolation of the foundations. CKP: the construction and operation of vehicles, electronics and electronics, the operation of mechatronics equipment and systems will be equipped with educational equipment to achieve the skills needed in the enterprises of waterborne transport, as well as in the production and processing of food. Method of implementation: entrusting and controlling the execution of works and supplies of equipment to economic operators selected by means of public procurement contracts. The construction work and equipment for the school building will be carried out in 2017. The equipment of the CKP will be carried out in 2018. The project will result in a better alignment of the conditions of vocational training at the school with the needs of shipping and food production and processing companies, which will increase the interest in these forms of education and thus the number of graduates, which is in line with the objectives set out in the SZOOP ROP WiM for this sub-Action. (English)
    0 references

    Identifiers

    RPWM.09.03.01-28-0005/16
    0 references