Research Centre — lab for by-products of combustion and energy (Q127198): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): CBR in the form of the by-products of combustion products and energy, where R & D will be carried out to develop innovative products and processes in the form of pro-environmental product technologies from coal, biomass and waste combustion. The CBR will use the potential of the Połaniec Power Plant (ENEA), which is the 5th largest unit of this type in PL. As a result, a large amount of waste and UPS are also generating heavy waste. With our sup...) |
||
Property / summary | |||
CBR in the form of the by-products of combustion products and energy, where R & D will be carried out to develop innovative products and processes in the form of pro-environmental product technologies from coal, biomass and waste combustion. The CBR will use the potential of the Połaniec Power Plant (ENEA), which is the 5th largest unit of this type in PL. As a result, a large amount of waste and UPS are also generating heavy waste. With our support, the company will acquire the real estate and R & D infrastructure, including the equipment and equipment needed to run CBR and will then start the R & D work with the current and newly hired staff and in close cooperation with the JN and the power plant. Following the completion of the R & D work, the results will be implemented in practice. The projected results of the project will lead to a significant increase in the innovative potential of our company as well as from the waste companies. Synergies will also benefit energy. Production processes and technoranges will be developed for processing and will be 100 % transferable and adjusted to target customers — power plants, companies operating the energy sector. As a result of the project, the following entries will be achieved: number of labs supported: 1, number of realism. proj. B + R: 4, ink. CI6: PLN 5 528 400, CI28: 1, ink. CI1: 1, ink. CI2: 1, ink. CI26: 1, number of facilities for persons with disabilities: 1, increase of poisoning: 5 FTE (of which: 2k, 3M), Number (2), prod.: 4, number of pro.B + R. 4 units, number of masterpieces with support: 1. The project is in line with the specific objectives set for Priority Axis 1 of INNOVATION and NAUR, and the objective of the project (the implementation of the R & D work) is in line with the objective of Measure 1.2 ROP WŚ for the period 2014-2020. The project will also be part of the RISK — SUSTAINABLE ENERGY DEVELOPMENT and resource-efficient construction. (English) | |||
Property / summary: CBR in the form of the by-products of combustion products and energy, where R & D will be carried out to develop innovative products and processes in the form of pro-environmental product technologies from coal, biomass and waste combustion. The CBR will use the potential of the Połaniec Power Plant (ENEA), which is the 5th largest unit of this type in PL. As a result, a large amount of waste and UPS are also generating heavy waste. With our support, the company will acquire the real estate and R & D infrastructure, including the equipment and equipment needed to run CBR and will then start the R & D work with the current and newly hired staff and in close cooperation with the JN and the power plant. Following the completion of the R & D work, the results will be implemented in practice. The projected results of the project will lead to a significant increase in the innovative potential of our company as well as from the waste companies. Synergies will also benefit energy. Production processes and technoranges will be developed for processing and will be 100 % transferable and adjusted to target customers — power plants, companies operating the energy sector. As a result of the project, the following entries will be achieved: number of labs supported: 1, number of realism. proj. B + R: 4, ink. CI6: PLN 5 528 400, CI28: 1, ink. CI1: 1, ink. CI2: 1, ink. CI26: 1, number of facilities for persons with disabilities: 1, increase of poisoning: 5 FTE (of which: 2k, 3M), Number (2), prod.: 4, number of pro.B + R. 4 units, number of masterpieces with support: 1. The project is in line with the specific objectives set for Priority Axis 1 of INNOVATION and NAUR, and the objective of the project (the implementation of the R & D work) is in line with the objective of Measure 1.2 ROP WŚ for the period 2014-2020. The project will also be part of the RISK — SUSTAINABLE ENERGY DEVELOPMENT and resource-efficient construction. (English) / rank | |||
Normal rank |
Revision as of 12:54, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Research Centre — lab for by-products of combustion and energy |
Project in Poland financed by DG Regio |
Statements
4,471,500.0 zloty
0 references
9,999,900.0 zloty
0 references
55.0 percent
0 references
1 May 2018
0 references
30 November 2020
0 references
CEBRIO GRZEGORZ PELCZAR
0 references
CBR w postaci laboratorium ubocznych produktów spalania i odpadów z energetyki, w którym realizowane będą prace B+R mające na celu opracowanie innowacyjnych produktów i procesów w postaci pro-środowiskowych technologii produktowego zagosp. odpadów przem. ze spalania węgla, biomasy i odpadów. CBR będzie wykorzystywał potencjał elektrowni Połaniec (ENEA), która jest 5-tą pod względem wielkości jednostką tego typu w PL. Co za tym idzie połaniecka siłowania generuje również sporo odpadów i UPS. Przy wsparciu nasza firma nabędzie nieruchomość i infrastrukturę B+R, w tym sprzęt i aparaturę, niezbędną do prowadzenia CBR, a następnie rozpocznie realizację prac B+R przy wykorzystaniu obecnie posiadanej i nowo zatrudnionej kadry naukowej i w ścisłej współpracy z JN i elektrownią. Po zakończeniu realizacji prac B+R nastąpi wdrożenie ich wyników w praktyce gosp. Zakładane rezultaty projektu przyczynią się do znacznego wzrostu potencjału innowacyjnego naszej firmy jak i firm z branży zagosp. odpadów. Efektem synergii będą też korzyści energetyki. Opracowane prod. i technol. będą dot. przetwórstwa przem. i będą w 100% transferowalne i dostos. do odbiorców, którym będą dedykowane – elektrownie, firmy obsługujące sektor energetyczny. W wyniku realizacji projektu osiągnięte zostaną następujące wsk.: liczba wspartych lab.: 1, liczba realiz. proj. B+R: 4, wsk. CI6: 5 528 400 zł, wsk. CI28: 1, wsk. CI1: 1, wsk. CI2: 1, wsk. CI26: 1, liczba obiektów dostos. do osób z niepełnospr.: 1, wzrost zatrud.: 5 EPC (w tym: 2K, 3M), liczba wprowadz.innow.proc.:2, prod.:4, liczba proj.B+R realiz.przy wykorzyst.wspartej infrastr.bad.: 4 szt.,liczba przeds.korzyst.ze wspartej infrastr.bad.:1 szt. Projekt jest zgodny z celami szczegółowymi wyznaczonymi dla osi priorytetowej 1 INNOWACJE I NAUKA, a cel projektu (realizacja prac B+R) jest zgodny z celem Działania 1.2 RPO WŚ na lata 2014-2020. Ponadto projekt wpisuje się RIS-y – ZRÓWNOWAŻONY ROZWÓJ ENERGETYCZNY oraz ZASOBOOSZCZĘDNE BUDOWNICTWO. (Polish)
0 references
CBR in the form of the by-products of combustion products and energy, where R & D will be carried out to develop innovative products and processes in the form of pro-environmental product technologies from coal, biomass and waste combustion. The CBR will use the potential of the Połaniec Power Plant (ENEA), which is the 5th largest unit of this type in PL. As a result, a large amount of waste and UPS are also generating heavy waste. With our support, the company will acquire the real estate and R & D infrastructure, including the equipment and equipment needed to run CBR and will then start the R & D work with the current and newly hired staff and in close cooperation with the JN and the power plant. Following the completion of the R & D work, the results will be implemented in practice. The projected results of the project will lead to a significant increase in the innovative potential of our company as well as from the waste companies. Synergies will also benefit energy. Production processes and technoranges will be developed for processing and will be 100 % transferable and adjusted to target customers — power plants, companies operating the energy sector. As a result of the project, the following entries will be achieved: number of labs supported: 1, number of realism. proj. B + R: 4, ink. CI6: PLN 5 528 400, CI28: 1, ink. CI1: 1, ink. CI2: 1, ink. CI26: 1, number of facilities for persons with disabilities: 1, increase of poisoning: 5 FTE (of which: 2k, 3M), Number (2), prod.: 4, number of pro.B + R. 4 units, number of masterpieces with support: 1. The project is in line with the specific objectives set for Priority Axis 1 of INNOVATION and NAUR, and the objective of the project (the implementation of the R & D work) is in line with the objective of Measure 1.2 ROP WŚ for the period 2014-2020. The project will also be part of the RISK — SUSTAINABLE ENERGY DEVELOPMENT and resource-efficient construction. (English)
0 references
Identifiers
RPSW.01.02.00-26-0054/17
0 references