(‎Created claim: summary (P836): The project is divided into three strands:1. Analysis of the optimal location and capacity of a possible biogasification plant in the Kajaani region. Identification of raw material sources, and analysis of the content and feasibility of feeds. Digestion tests and examinations of cleared feeds. The use of the plant’s digestion residue as fertiliser in fields will also be investigated. This information provides information on where the plant shoul...)
Property / summary
 
The project is divided into three strands:1. Analysis of the optimal location and capacity of a possible biogasification plant in the Kajaani region. Identification of raw material sources, and analysis of the content and feasibility of feeds. Digestion tests and examinations of cleared feeds. The use of the plant’s digestion residue as fertiliser in fields will also be investigated. This information provides information on where the plant should be located, taking into account both financial and logistical aspects. The size of the installation is determined by the number of usable inputs in the area.2. Study of the cooperation network, energy study3. Preparation of a pre-plan, strategic business model (English)
Property / summary: The project is divided into three strands:1. Analysis of the optimal location and capacity of a possible biogasification plant in the Kajaani region. Identification of raw material sources, and analysis of the content and feasibility of feeds. Digestion tests and examinations of cleared feeds. The use of the plant’s digestion residue as fertiliser in fields will also be investigated. This information provides information on where the plant should be located, taking into account both financial and logistical aspects. The size of the installation is determined by the number of usable inputs in the area.2. Study of the cooperation network, energy study3. Preparation of a pre-plan, strategic business model (English) / rank
 
Normal rank
Property / summary: The project is divided into three strands:1. Analysis of the optimal location and capacity of a possible biogasification plant in the Kajaani region. Identification of raw material sources, and analysis of the content and feasibility of feeds. Digestion tests and examinations of cleared feeds. The use of the plant’s digestion residue as fertiliser in fields will also be investigated. This information provides information on where the plant should be located, taking into account both financial and logistical aspects. The size of the installation is determined by the number of usable inputs in the area.2. Study of the cooperation network, energy study3. Preparation of a pre-plan, strategic business model (English) / qualifier
 
point in time: 22 November 2021
Timestamp+2021-11-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:28, 22 November 2021

Project Q3748790 in France
Language Label Description Also known as
English
No label defined
Project Q3748790 in France

    Statements

    0 references
    43,020 Euro
    0 references
    43,020.0 Euro
    0 references
    100.0 percent
    0 references
    19 June 2014
    0 references
    31 December 2015
    0 references
    JAHOTEC OY
    0 references

    64°12'27.14"N, 27°43'37.67"E
    0 references
    87100
    0 references
    Hanke jakautuu kolmeen osa-alueeseen:1. Mahdollisen biokaasutuslaitoksen optimaalisen sijainnin ja kapasiteetin selvittäminen Kajaanin alueella. Raaka-ainelähteiden kartoittaminen, sekä syötteiden sisällön ja hyödyntämiskelpoisuuden tutkiminen. Selvitettyjen syötteiden mädätystestit ja tutkimukset. Selvitetään myös tehtaan mädätysjäännöksen käyttö lannoitteena peltoihin. Näiden tietojen pohjalta saadaan tietoa siitä mihin laitos tulisi sijoittaa niin taloudelliset kuin logistiset näkökulmat huomioiden. Laitoksen koko määräytyy alueella olevien käyttökelpoisten syötteiden määrän perusteella.2. Yhteistyöverkoston selvitys, energiaselvitys3. Esisuunnitelman laatiminen, strateginen liiketoimintamalli (Finnish)
    0 references
    The project is divided into three strands:1. Analysis of the optimal location and capacity of a possible biogasification plant in the Kajaani region. Identification of raw material sources, and analysis of the content and feasibility of feeds. Digestion tests and examinations of cleared feeds. The use of the plant’s digestion residue as fertiliser in fields will also be investigated. This information provides information on where the plant should be located, taking into account both financial and logistical aspects. The size of the installation is determined by the number of usable inputs in the area.2. Study of the cooperation network, energy study3. Preparation of a pre-plan, strategic business model (English)
    22 November 2021
    0 references

    Identifiers

    0 references