Thermal modernisation of public buildings in the municipality of Midzana Góra (Q127878): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project for improving the energy efficiency of public buildings concerns: a team of Schools in the Kodomyn Second School of the School in Cmińsk, the Primary School in Plawu, the Kodmiołock Municipal Health Centre in the municipality of Mizioana Góra. Buildings are energy-intensive so they need to be interfered with by the municipal authorities which own the premises. In terms of financial advantages, the Municipality of Mizdzana Góra will b...) |
||
Property / summary | |||
The project for improving the energy efficiency of public buildings concerns: a team of Schools in the Kodomyn Second School of the School in Cmińsk, the Primary School in Plawu, the Kodmiołock Municipal Health Centre in the municipality of Mizioana Góra. Buildings are energy-intensive so they need to be interfered with by the municipal authorities which own the premises. In terms of financial advantages, the Municipality of Mizdzana Góra will be the most affected by the investment, who will, in a reduced need for primary energy needed to heat the buildings, heat the water and the electricity from the grid, will suffer a substantial decrease in the cost of maintaining it. Improving ambient air quality will be a very important element of the project, as it will diminish its pollination (increase in quality of life), the increase in the use of renewable energy sources, energy efficient lighting and energy renovation, will result in reduced energy demand for heating, the preparation of CWUs and lighting. Main tasks to be carried out: insulation of external walls, overhead floor and flat roof/roof, replacement of doors, window frames, modernisation of the service for hot and hot water., mechanical ventilation, new windows and doors, LED lighting together with the installation of a photovoltaic installation. All in/in activities will lead to a significant reduction in energy demand (increase in energy efficiency), the benefit of reducing greenhouse gas emissions, reducing energy consumption for hot and heating hot water heating, increasing the share of renewable energy in the territory of the municipality and hence the entire area of the NFAs. The project contributes to the achievement of the objectives set out in the ITI Strategy strategy, including strategic objective 5, improving energy efficiency and investments in renewable energy, the objectives of ITI and ROPs, the indicators set out in point 5 of the ITI KOF strategy. (English) | |||
Property / summary: The project for improving the energy efficiency of public buildings concerns: a team of Schools in the Kodomyn Second School of the School in Cmińsk, the Primary School in Plawu, the Kodmiołock Municipal Health Centre in the municipality of Mizioana Góra. Buildings are energy-intensive so they need to be interfered with by the municipal authorities which own the premises. In terms of financial advantages, the Municipality of Mizdzana Góra will be the most affected by the investment, who will, in a reduced need for primary energy needed to heat the buildings, heat the water and the electricity from the grid, will suffer a substantial decrease in the cost of maintaining it. Improving ambient air quality will be a very important element of the project, as it will diminish its pollination (increase in quality of life), the increase in the use of renewable energy sources, energy efficient lighting and energy renovation, will result in reduced energy demand for heating, the preparation of CWUs and lighting. Main tasks to be carried out: insulation of external walls, overhead floor and flat roof/roof, replacement of doors, window frames, modernisation of the service for hot and hot water., mechanical ventilation, new windows and doors, LED lighting together with the installation of a photovoltaic installation. All in/in activities will lead to a significant reduction in energy demand (increase in energy efficiency), the benefit of reducing greenhouse gas emissions, reducing energy consumption for hot and heating hot water heating, increasing the share of renewable energy in the territory of the municipality and hence the entire area of the NFAs. The project contributes to the achievement of the objectives set out in the ITI Strategy strategy, including strategic objective 5, improving energy efficiency and investments in renewable energy, the objectives of ITI and ROPs, the indicators set out in point 5 of the ITI KOF strategy. (English) / rank | |||
Normal rank |
Revision as of 12:46, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of public buildings in the municipality of Midzana Góra |
Project in Poland financed by DG Regio |
Statements
7,447,128.95 zloty
0 references
9,980,366.0 zloty
0 references
85.0 percent
0 references
11 January 2017
0 references
31 December 2020
0 references
GMINA MIEDZIANA GÓRA
0 references
Projekt z zakresu poprawy efektywności energetycznej budynków użyteczności publicznej dotyczy:Zespołu Szkół w Kostomłotach Drugich, Zespołu Szkół w Cmińsku, Szkoły Podstawowej w Porzeczu, Samorządowego Ośrodka Zdrowia w Kostomłotach D. w gminie Miedziana Góra. Budynki są obiektami energochłonnymi, stąd wymagają ingerencji ze strony władz gminy, które są właścicielami obiektu. Pod względem korzyści finansowych realizację inwestycji najbardziej odczują władze Gminy Miedziana Góra, którzy w zmniejszonym zapotrzebowaniu na energię pierwotną potrzebną do ogrzania budynków, ogrzania c.w.u, a także poboru energii elektrycznej z sieci, odczują różnicę w znacznym spadku kosztów jego utrzymania. Bardzo istotnym elementem przedsięwzięcia będzie poprawa jakości powietrza atmosferycznego, gdyż zmniejszy się jego zapylenie (wzrost jakości życia) Wzrost wykorzystania odnawialnych źródeł energii, energooszczędne oświetlenie oraz termomodernizacja budynków, spowodują mniejsze zapotrzebowanie na energię służącą ogrzewaniu, przygotowaniu cwu oraz oświetleniu. Główne zadania przewidziane do realizacji: docieplenie ścian zewnętrznych, stropu pod nieogrzewanym poddaszem i stropodachu/dachu, wymiana stolarki drzwiowej, okiennej, modernizacja instalacji c.o i c.w.u.,wentylacja mechaniczna,nowe okna i drzwi, oświetlenie LED wraz z montażem instalacji fotowoltaicznej. Wszystkie w/w działania prowadzić będą do znacznego zmniejszenia zapotrzebowania energetycznego (wzrost efektywności energetycznej) Korzyści:redukcja emisji gazów cieplarnianych, zmniejszenie zużycia energii dla potrzeb ogrzewania c.w.u. czy ogrzewania, zwiększenie udziału energii pochodzącej ze źródeł odnawialnych na obszarze gminy, a tym samym na całym obszarze KOF. Projekt przyczynia się do wypełnienia celów wpisanych w Strategii ZIT KOF, a są to m.in. cel strategiczny 5, Poprawa efektywności energetycznej oraz inwestycje w odnawialne źródła energii, cele ZIT KOF i RPO, wskaźniki określonych w pkt 5 strategii ZIT KOF. (Polish)
0 references
The project for improving the energy efficiency of public buildings concerns: a team of Schools in the Kodomyn Second School of the School in Cmińsk, the Primary School in Plawu, the Kodmiołock Municipal Health Centre in the municipality of Mizioana Góra. Buildings are energy-intensive so they need to be interfered with by the municipal authorities which own the premises. In terms of financial advantages, the Municipality of Mizdzana Góra will be the most affected by the investment, who will, in a reduced need for primary energy needed to heat the buildings, heat the water and the electricity from the grid, will suffer a substantial decrease in the cost of maintaining it. Improving ambient air quality will be a very important element of the project, as it will diminish its pollination (increase in quality of life), the increase in the use of renewable energy sources, energy efficient lighting and energy renovation, will result in reduced energy demand for heating, the preparation of CWUs and lighting. Main tasks to be carried out: insulation of external walls, overhead floor and flat roof/roof, replacement of doors, window frames, modernisation of the service for hot and hot water., mechanical ventilation, new windows and doors, LED lighting together with the installation of a photovoltaic installation. All in/in activities will lead to a significant reduction in energy demand (increase in energy efficiency), the benefit of reducing greenhouse gas emissions, reducing energy consumption for hot and heating hot water heating, increasing the share of renewable energy in the territory of the municipality and hence the entire area of the NFAs. The project contributes to the achievement of the objectives set out in the ITI Strategy strategy, including strategic objective 5, improving energy efficiency and investments in renewable energy, the objectives of ITI and ROPs, the indicators set out in point 5 of the ITI KOF strategy. (English)
0 references
Identifiers
RPSW.06.01.00-26-0007/16
0 references