Solar Gmina Werry (Q123709): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project involves the installation of RES installations designed for the production of electricity and heat ensuring the maximum possible capacity adjusted to meet the needs of the facility. With the project, there are 85 RES micro-installations — 73 solar installations and 12 solar installations. The main objectives of the project are to improve the energy efficiency of residential buildings and to improve the quality of ambient air within t...) |
||
Property / summary | |||
The project involves the installation of RES installations designed for the production of electricity and heat ensuring the maximum possible capacity adjusted to meet the needs of the facility. With the project, there are 85 RES micro-installations — 73 solar installations and 12 solar installations. The main objectives of the project are to improve the energy efficiency of residential buildings and to improve the quality of ambient air within the municipality of Wyry. The project is covered both by the Province and by the Gostyń, so that all residents of the municipality can benefit from the effects of the project. Limitation so called “low emissions” will not only have a positive impact on the air in the municipality, but will also contribute to the improvement of living conditions in the region. In addition, the use of RES systems has an educational value which positively influences the environmental awareness of the inhabitants of the municipality and of their visitors. (English) | |||
Property / summary: The project involves the installation of RES installations designed for the production of electricity and heat ensuring the maximum possible capacity adjusted to meet the needs of the facility. With the project, there are 85 RES micro-installations — 73 solar installations and 12 solar installations. The main objectives of the project are to improve the energy efficiency of residential buildings and to improve the quality of ambient air within the municipality of Wyry. The project is covered both by the Province and by the Gostyń, so that all residents of the municipality can benefit from the effects of the project. Limitation so called “low emissions” will not only have a positive impact on the air in the municipality, but will also contribute to the improvement of living conditions in the region. In addition, the use of RES systems has an educational value which positively influences the environmental awareness of the inhabitants of the municipality and of their visitors. (English) / rank | |||
Normal rank |
Revision as of 10:02, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Solar Gmina Werry |
Project in Poland financed by DG Regio |
Statements
844,878.66 zloty
0 references
1,716,539.33 zloty
0 references
53.52 percent
0 references
25 July 2018
0 references
14 May 2019
0 references
GMINA WYRY
0 references
Przedmiotem projektu jest wykonanie instalacji OZE przeznaczonych do produkcji energii elektrycznej i cieplnej zapewniających maksymalną możliwą wydajność dostosowaną do potrzeb danego obiektu. Dzięki realizacji projektu powstanie 85 mikroinstalacji OZE - 73 instalacje fotowoltaiczne i 12 instalacji solarnych. Głównymi celami projektu są poprawa efektywności energetycznej budynków mieszkalnych oraz poprawa jakości powietrza atmosferycznego na terenie Gminy Wyry. Projektem są objęte zarówno Wyry jak i Gostyń, dzięki czemu z efektów projektu będą mogli korzystać wszyscy mieszkańcy Gminy. Ograniczenie tzw. "niskiej emisji" wpłynie pozytywnie nie tylko na powietrze w Gminie, ale przyczyni się również do poprawy warunków życiowych w regionie. Dodatkowo zastosowanie systemów OZE posiada walory edukacyjne, które pozytywnie wpłyną na świadomość ekologiczną mieszkańców Gminy oraz przyjezdnych. (Polish)
0 references
The project involves the installation of RES installations designed for the production of electricity and heat ensuring the maximum possible capacity adjusted to meet the needs of the facility. With the project, there are 85 RES micro-installations — 73 solar installations and 12 solar installations. The main objectives of the project are to improve the energy efficiency of residential buildings and to improve the quality of ambient air within the municipality of Wyry. The project is covered both by the Province and by the Gostyń, so that all residents of the municipality can benefit from the effects of the project. Limitation so called “low emissions” will not only have a positive impact on the air in the municipality, but will also contribute to the improvement of living conditions in the region. In addition, the use of RES systems has an educational value which positively influences the environmental awareness of the inhabitants of the municipality and of their visitors. (English)
0 references
Identifiers
RPSL.04.01.01-24-037G/17
0 references