“Expansion of the composting plant at RIPOK Czarnówko” (Q122545): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The purpose of the planned investment is to expand the composting plant in the area of municipal waste processing. The extension of the phase is assumed. At this stage, it is envisaged to build: — 3 bioreactors and 1 empty reactors with process air cleaning systems, i.e. a biofilter and a ventilation system, i.e. 3 ventilation fans built in a container fan in a container; compost/stabilisation square; surfaced area between bioreactors and a ripe...) |
||
Property / summary | |||
The purpose of the planned investment is to expand the composting plant in the area of municipal waste processing. The extension of the phase is assumed. At this stage, it is envisaged to build: — 3 bioreactors and 1 empty reactors with process air cleaning systems, i.e. a biofilter and a ventilation system, i.e. 3 ventilation fans built in a container fan in a container; compost/stabilisation square; surfaced area between bioreactors and a ripening patch — manoeuvring area/technology; a watertight underground tank for leachate, delivery of the crushers. The purpose of composting plants is to: — Biological stabilisation of the waste fraction of the fraction 0-80 mm containing biodegradable waste and the production of green and kitchen waste from the separate collection and sewage sludge. The capacity of the reactors is ca. 9500 tonnes/year. The aim of the project is to reduce the disposal of waste, to increase recycling and to improve the quality of the processing. (English) | |||
Property / summary: The purpose of the planned investment is to expand the composting plant in the area of municipal waste processing. The extension of the phase is assumed. At this stage, it is envisaged to build: — 3 bioreactors and 1 empty reactors with process air cleaning systems, i.e. a biofilter and a ventilation system, i.e. 3 ventilation fans built in a container fan in a container; compost/stabilisation square; surfaced area between bioreactors and a ripening patch — manoeuvring area/technology; a watertight underground tank for leachate, delivery of the crushers. The purpose of composting plants is to: — Biological stabilisation of the waste fraction of the fraction 0-80 mm containing biodegradable waste and the production of green and kitchen waste from the separate collection and sewage sludge. The capacity of the reactors is ca. 9500 tonnes/year. The aim of the project is to reduce the disposal of waste, to increase recycling and to improve the quality of the processing. (English) / rank | |||
Normal rank |
Revision as of 09:52, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | “Expansion of the composting plant at RIPOK Czarnówko” |
Project in Poland financed by DG Regio |
Statements
6,133,131.74 zloty
0 references
8,991,852.41 zloty
0 references
85.0 percent
0 references
1 October 2018
0 references
31 December 2019
0 references
ZAKŁAD ZAGOSPODAROWANIA ODPADÓW „CZYSTA BŁĘKITNA KRAINA” SP. Z O.O. W CZARNÓWKU
0 references
Przedmiotem planowanej inwestycji jest rozbudowa kompostowni na terenie Regionalnej Instalacji Przetwarzania Odpadów Komunalnych. Zakłada się rozbudowę etapową. Na obecnym etapie zakłada się budowę : -3 bioreaktorów oraz 1 bez uzbrojenia z instalacją do oczyszczania powietrza procesowego tj. biofiltrem oraz system wentylacji tj. 3 wentylatorów napowietrzających zabudowanych w kontenerowej wentylatorowni; placu dojrzewania kompostu/stabilizatu; utwardzonego plac pomiędzy bioreaktorami a placem dojrzewania – teren manewrowy/plac technologiczny; szczelnego, podziemnego zbiornika na odcieki, dostawę rozdrabniarki. Celem instalacji kompostowania jest: - stabilizacja biologiczna odpadów frakcji 0-80 mm zawierającej odpady biodegradowalne oraz produkcja kompostu z odpadów zielonych i kuchennych z selektywnej zbiórki, a także osadów ściekowych. Przepustowość reaktorów to ok. 9500 Mg/rok. Celem projektu jest redukcja składowania odpadów, zwiększenie recyklingu i poprawa jakości przetwarzania. (Polish)
0 references
The purpose of the planned investment is to expand the composting plant in the area of municipal waste processing. The extension of the phase is assumed. At this stage, it is envisaged to build: — 3 bioreactors and 1 empty reactors with process air cleaning systems, i.e. a biofilter and a ventilation system, i.e. 3 ventilation fans built in a container fan in a container; compost/stabilisation square; surfaced area between bioreactors and a ripening patch — manoeuvring area/technology; a watertight underground tank for leachate, delivery of the crushers. The purpose of composting plants is to: — Biological stabilisation of the waste fraction of the fraction 0-80 mm containing biodegradable waste and the production of green and kitchen waste from the separate collection and sewage sludge. The capacity of the reactors is ca. 9500 tonnes/year. The aim of the project is to reduce the disposal of waste, to increase recycling and to improve the quality of the processing. (English)
0 references
Identifiers
RPPM.11.02.00-22-0014/17
0 references