Construction of a selective waste collection point (Q122527): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The object of the project is the construction of a new, completely equipped set of selective waste collection point with an accompanying infrastructure. The construction and assembly works will be carried out under the “design and demolition” mode. The equipment of the PSZOK will be commissioned separately. The investor’s oversight of all investment tasks (design, construction and delivery of equipment) will be ensured. Mandatory information and...)
Property / summary
 
The object of the project is the construction of a new, completely equipped set of selective waste collection point with an accompanying infrastructure. The construction and assembly works will be carried out under the “design and demolition” mode. The equipment of the PSZOK will be commissioned separately. The investor’s oversight of all investment tasks (design, construction and delivery of equipment) will be ensured. Mandatory information and publicity measures will be carried out. The project also included tasks related to its preparation and management. In the framework of cross-financing (Flexibility Instrument), educational activities on waste prevention, proper handling and recovery and recycling of waste are planned. The aim of the project is to increase the efficiency of the municipal waste management system in the city and municipality of Gniezno, in order to achieve the required levels of recycling and recovery of municipal waste. (English)
Property / summary: The object of the project is the construction of a new, completely equipped set of selective waste collection point with an accompanying infrastructure. The construction and assembly works will be carried out under the “design and demolition” mode. The equipment of the PSZOK will be commissioned separately. The investor’s oversight of all investment tasks (design, construction and delivery of equipment) will be ensured. Mandatory information and publicity measures will be carried out. The project also included tasks related to its preparation and management. In the framework of cross-financing (Flexibility Instrument), educational activities on waste prevention, proper handling and recovery and recycling of waste are planned. The aim of the project is to increase the efficiency of the municipal waste management system in the city and municipality of Gniezno, in order to achieve the required levels of recycling and recovery of municipal waste. (English) / rank
 
Normal rank

Revision as of 09:52, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a selective waste collection point
Project in Poland financed by DG Regio

    Statements

    0 references
    1,353,456.15 zloty
    0 references
    324,829.47599999997 Euro
    13 January 2020
    0 references
    1,963,450.68 zloty
    0 references
    471,228.16319999995 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2019
    0 references
    30 November 2020
    0 references
    GMINA GNIEW
    0 references
    Przedmiotem projektu jest budowa nowego, kompletnie wyposażonego Punktu Selektywnego Zbierania Odpadów Komunalnych w Gniewie wraz z infrastrukturą towarzyszącą. Prace budowlano-montażowe realizowane będą w trybie „zaprojektuj i wybuduj”. Odrębnie zamówione zostanie wyposażenie PSZOK. Zapewniony zostanie nadzór inwestorski nad całością zadania inwestycyjnego (projektowaniem, budową i dostawą wyposażenia). Przeprowadzone zostaną obowiązkowe działania w zakresie informacji i promocji. W ramach projektu uwzględnione zostały również zadania związane z jego przygotowaniem i zarządzaniem. W ramach cross-financingu (instrumentu elastyczności) zaplanowano działania edukacyjne w zakresie zapobiegania powstawaniu odpadów, właściwego postępowania z odpadami oraz odzysku i recyklingu odpadów. Celem projektu jest zwiększenie efektywności systemu gospodarowania odpadami komunalnymi na terenie Miasta i Gminy Gniew, dla osiągnięcia wymaganych poziomów recyklingu i odzysku odpadów komunalnych. (Polish)
    0 references
    The object of the project is the construction of a new, completely equipped set of selective waste collection point with an accompanying infrastructure. The construction and assembly works will be carried out under the “design and demolition” mode. The equipment of the PSZOK will be commissioned separately. The investor’s oversight of all investment tasks (design, construction and delivery of equipment) will be ensured. Mandatory information and publicity measures will be carried out. The project also included tasks related to its preparation and management. In the framework of cross-financing (Flexibility Instrument), educational activities on waste prevention, proper handling and recovery and recycling of waste are planned. The aim of the project is to increase the efficiency of the municipal waste management system in the city and municipality of Gniezno, in order to achieve the required levels of recycling and recovery of municipal waste. (English)
    0 references

    Identifiers

    RPPM.11.02.00-22-0002/16
    0 references