Thermo-modernisation of the building of the Popków District of Ropczyce — Bear 10 (Q118646): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project involves the renovation of the energy upgrade of the building of the Ropczyce District of Ropczyce District in the municipality of Ropczyce 10. The health care centre is a member of the Ropczyce (Public Health Insurance Institution), the constituent body of which is a county authority. The total usable total building is 1 108.35 m². The ZOZ used in Ropczyce is 798.32 m² (i.e. basement, ground floor and 1st floor). In the remaining pa...)
Property / summary
 
The project involves the renovation of the energy upgrade of the building of the Ropczyce District of Ropczyce District in the municipality of Ropczyce 10. The health care centre is a member of the Ropczyce (Public Health Insurance Institution), the constituent body of which is a county authority. The total usable total building is 1 108.35 m². The ZOZ used in Ropczyce is 798.32 m² (i.e. basement, ground floor and 1st floor). In the remaining part of the building. 310.03 m², which is excluded from the eligible costs, is a pharmacy (ground floor) and a social housing (2nd floor). The ratio by qualified to the total is 72.03 %. The annual reduction of energy demand as a result of a project to improve energy efficiency is 62.33 %. The direct objective is to modernise the energy utility of a public building. The project is a response to the needs of the inhabitants, which are linked to the increase in the functionality of public utilities, including through the insulation of the roof, the external walls, the external walls of the basement — wheel, the replacement of windows, the insulation of outdoor walls in contact with the ground, the replacement of external doors, replacement of lighting, and the replacement of lighting that is built on energy efficient ones. The implementation of the project will contribute to reducing the energy intensity of the public building in the district of Romankovanowski. The planned modernisation work will reduce the electricity and heat consumption, which will have a positive impact on the environment, the comfort of the use of the building and a reduction in the cost of living. As a result of the project, the estimated fall in GHG emissions is expected to be 66,48 tonnes CO2/rok equivalent (since 2020). In addition, the annual energy cost savings in 2020 will be PLN 55 082,64 per year. (English)
Property / summary: The project involves the renovation of the energy upgrade of the building of the Ropczyce District of Ropczyce District in the municipality of Ropczyce 10. The health care centre is a member of the Ropczyce (Public Health Insurance Institution), the constituent body of which is a county authority. The total usable total building is 1 108.35 m². The ZOZ used in Ropczyce is 798.32 m² (i.e. basement, ground floor and 1st floor). In the remaining part of the building. 310.03 m², which is excluded from the eligible costs, is a pharmacy (ground floor) and a social housing (2nd floor). The ratio by qualified to the total is 72.03 %. The annual reduction of energy demand as a result of a project to improve energy efficiency is 62.33 %. The direct objective is to modernise the energy utility of a public building. The project is a response to the needs of the inhabitants, which are linked to the increase in the functionality of public utilities, including through the insulation of the roof, the external walls, the external walls of the basement — wheel, the replacement of windows, the insulation of outdoor walls in contact with the ground, the replacement of external doors, replacement of lighting, and the replacement of lighting that is built on energy efficient ones. The implementation of the project will contribute to reducing the energy intensity of the public building in the district of Romankovanowski. The planned modernisation work will reduce the electricity and heat consumption, which will have a positive impact on the environment, the comfort of the use of the building and a reduction in the cost of living. As a result of the project, the estimated fall in GHG emissions is expected to be 66,48 tonnes CO2/rok equivalent (since 2020). In addition, the annual energy cost savings in 2020 will be PLN 55 082,64 per year. (English) / rank
 
Normal rank

Revision as of 08:50, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermo-modernisation of the building of the Popków District of Ropczyce — Bear 10
Project in Poland financed by DG Regio

    Statements

    0 references
    455,767.1 zloty
    0 references
    109,384.10399999999 Euro
    13 January 2020
    0 references
    1,192,175.67 zloty
    0 references
    286,122.16079999995 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    16 November 2017
    0 references
    30 August 2019
    0 references
    POWIAT ROPCZYCKO-SĘDZISZOWSKI
    0 references
    Projekt obejmuje modernizację energetyczną budynku Filii Przychodni Rejonowej w Ropczycach zlokalizowanej na terenie Gminy Ropczyce w miejscowości Niedźwiada 10. Przychodnia wchodzi w skład Zespołu Opieki Zdrowotnej w Ropczycach (samodzielny publiczny zakład opieki zdrowotnej), którego organem założycielskim jest Powiat Ropczycko-Sędziszowski. Łączna pow. użytkowa całego budynku wynosi 1 108,35 m2. Pow. użytkowana przez ZOZ w Ropczycach wynosi 798,32 m2 (tj. piwnica, parter oraz I piętro). W pozostałej części bud. o pow. 310,03 m2, która została wyłączona z kosztów kwalifikowanych znajduje się apteka (poziom parteru) oraz mieszkania socjalne (II piętro). Stosunek pow. kwalifikowanej do całkowitej wynosi 72,03 %. Roczne zmniejszenie zapotrzebowania na energię w wyniku realizacji przedsięwzięcia służącego poprawie efektywności energetycznej wynosi 62,33%. Celem bezpośrednim jest modernizacja energetyczna budynku użyteczności publicznej. Projekt jest odpowiedzią na potrzeby mieszkańców, które wiążą się ze zwiększeniem funkcjonalności obiektów użyteczności publicznej m.in. poprzez ocieplenie stropodachu, ścian zewnętrznych, ścian zewnętrznych piwnic – cokół, wymianę okien, ocieplenie ścian zewnętrznych piwnic stykających się z gruntem, wymianę drzwi zewnętrznych, wymianę oświetlenia wbudowanego na energooszczędne. Realizacja projektu przyczyni się do zmniejszenia energochłonności budynku użyteczności publicznej na terenie powiatu ropczycko-sędziszowskiego. Planowane prace modernizacyjne spowodują zmniejszenie zużycia energii elektrycznej oraz energii cieplnej, co będzie miało pozytywny wpływ na środowisko naturalne, komfort użytkowania budynku oraz redukcje kosztów ich utrzymania. W wyniku realizacji projektu zakłada się, iż szacowany spadek emisji gazów cieplarnianych wyniesie 66,48 tony ekwiwalentu CO2/rok (od roku 2020). Ponadto roczna oszczędność kosztów energii w 2020 r. wyniesie 55 082,64 zł/rok. (Polish)
    0 references
    The project involves the renovation of the energy upgrade of the building of the Ropczyce District of Ropczyce District in the municipality of Ropczyce 10. The health care centre is a member of the Ropczyce (Public Health Insurance Institution), the constituent body of which is a county authority. The total usable total building is 1 108.35 m². The ZOZ used in Ropczyce is 798.32 m² (i.e. basement, ground floor and 1st floor). In the remaining part of the building. 310.03 m², which is excluded from the eligible costs, is a pharmacy (ground floor) and a social housing (2nd floor). The ratio by qualified to the total is 72.03 %. The annual reduction of energy demand as a result of a project to improve energy efficiency is 62.33 %. The direct objective is to modernise the energy utility of a public building. The project is a response to the needs of the inhabitants, which are linked to the increase in the functionality of public utilities, including through the insulation of the roof, the external walls, the external walls of the basement — wheel, the replacement of windows, the insulation of outdoor walls in contact with the ground, the replacement of external doors, replacement of lighting, and the replacement of lighting that is built on energy efficient ones. The implementation of the project will contribute to reducing the energy intensity of the public building in the district of Romankovanowski. The planned modernisation work will reduce the electricity and heat consumption, which will have a positive impact on the environment, the comfort of the use of the building and a reduction in the cost of living. As a result of the project, the estimated fall in GHG emissions is expected to be 66,48 tonnes CO2/rok equivalent (since 2020). In addition, the annual energy cost savings in 2020 will be PLN 55 082,64 per year. (English)
    0 references

    Identifiers

    RPPK.03.02.00-18-0019/18
    0 references