Photovoltaic power plant of 1 791 kW in Chwalowice. (Q118597): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The overall objective of the project is to reduce greenhouse gas emissions from the energy sector and the specific objective of producing electricity from renewable sources. The achievement of these objectives will contribute to the improvement of the environment and the protection of the environment. The project’s objectives will be achieved within a period of 12 months from the date of completion of the investment consisting of the extension o...)
Property / summary
 
The overall objective of the project is to reduce greenhouse gas emissions from the energy sector and the specific objective of producing electricity from renewable sources. The achievement of these objectives will contribute to the improvement of the environment and the protection of the environment. The project’s objectives will be achieved within a period of 12 months from the date of completion of the investment consisting of the extension of the photovoltaic (PV) plant. the investment is the construction of a PV power plant with a capacity of 1 791 kW. The planned installation will be located in Chwałowice, town of Radomyśl nad Sanem on plots Nos 2307, 2308, 2316. The plant will be composed of photovoltaic panels. The panels will cooperate with inverters having a total power of 1 791 kW (AC). The connection of the equipment is planned to the existing cable line of the SN St-1 station as a constituent element of the current solar plant 99 kW. Part of inverters is planned to connect to the existing RS. The energy produced by the plant will be supplied to the energy network SN 15 kV, via the existing electrical connection connection — SN 15 kV. The measurement of energy shall be achieved by the existing measuring gate. the project implementation includes the following:• completion of a section of the 15 kV cable line, station STP-3 and STP-2 and STP-2 and STP-1. STP-1 — existing station hit• modification of the existing SN power cable of the STP-1 station after the new route on the section ca. 100 m.rus:• two prefabricated overhead paired track stations 15/0.4 kV with a target capacity of 630 kVA• switchgear RS-2 and RS-3 switchgear with measurement and measurement systems at 0,4kVPerformance:• N cable natural cable from switchgear RS-1 to RS-3 to the projected energy nodes W2 — W13• earthing installations:• Photoerection of photovoltaic panels• electrical installations• the monitoring system together with the transmission of data (English)
Property / summary: The overall objective of the project is to reduce greenhouse gas emissions from the energy sector and the specific objective of producing electricity from renewable sources. The achievement of these objectives will contribute to the improvement of the environment and the protection of the environment. The project’s objectives will be achieved within a period of 12 months from the date of completion of the investment consisting of the extension of the photovoltaic (PV) plant. the investment is the construction of a PV power plant with a capacity of 1 791 kW. The planned installation will be located in Chwałowice, town of Radomyśl nad Sanem on plots Nos 2307, 2308, 2316. The plant will be composed of photovoltaic panels. The panels will cooperate with inverters having a total power of 1 791 kW (AC). The connection of the equipment is planned to the existing cable line of the SN St-1 station as a constituent element of the current solar plant 99 kW. Part of inverters is planned to connect to the existing RS. The energy produced by the plant will be supplied to the energy network SN 15 kV, via the existing electrical connection connection — SN 15 kV. The measurement of energy shall be achieved by the existing measuring gate. the project implementation includes the following:• completion of a section of the 15 kV cable line, station STP-3 and STP-2 and STP-2 and STP-1. STP-1 — existing station hit• modification of the existing SN power cable of the STP-1 station after the new route on the section ca. 100 m.rus:• two prefabricated overhead paired track stations 15/0.4 kV with a target capacity of 630 kVA• switchgear RS-2 and RS-3 switchgear with measurement and measurement systems at 0,4kVPerformance:• N cable natural cable from switchgear RS-1 to RS-3 to the projected energy nodes W2 — W13• earthing installations:• Photoerection of photovoltaic panels• electrical installations• the monitoring system together with the transmission of data (English) / rank
 
Normal rank

Revision as of 08:50, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Photovoltaic power plant of 1 791 kW in Chwalowice.
Project in Poland financed by DG Regio

    Statements

    0 references
    4,713,224.76 zloty
    0 references
    1,131,173.9423999998 Euro
    13 January 2020
    0 references
    8,995,866.46 zloty
    0 references
    2,159,007.9504 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 February 2018
    0 references
    31 December 2020
    0 references
    DEWELOPER APKLAN PIOTR KAWALEC
    0 references
    Ogólnym celem projektu jest ograniczenie emisji gazów cieplarnianych przez sektor energetyczny zaś celem szczegółowym wytwarzanie energii elektrycznej pochodzącej z odnawialnych źródeł. Realizacja tych celów wpłynie na poprawę stanu i ochronę środowiska naturalnego. Cele projektu osiągnięte zostaną w okresie 12 miesięcy od dnia zakończenia realizacji inwestycji polegającej na rozbudowie elektrowni fotowoltaicznej.Przedmiotem inwestycji jest budowa elektrowni fotowoltaicznej o mocy 1791 kW. Projektowana instalacja będzie zlokalizowana w miejscowości Chwałowice, gm. Radomyśl nad Sanem na działkach nr 2307, 2308, 2316. Elektrownia składać się będzie z paneli fotowoltaicznych. Panele będą współpracowały z inwerterami o łącznej mocy 1791 kW (AC). Przyłączenie urządzeń planuje się do istniejącej linii kablowej SN zakończonej na słupie stacji trafo STp-1 będącej elementem składowym istniejącej obecnie instalacji solarnej o mocy 99 kW. Część inwerterów planuje się przyłączyć do istniejącej rozdzielnicy RS. Energia produkowana przez elektrownię będzie dostarczana do sieci energetycznej SN 15kV, poprzez istniejące przyłącze napowietrzno - kablowe SN 15 kV. Pomiar energii realizowany będzie za pomocą istniejącej bramki pomiarowej.Realizacja projektu obejmuje swym zakresem:•wykonanie odcinka linii kablowej SN 15kV w relacji, stacja STp-3 i STp-2 oraz STp-2 i STp-1. STp-1 - istniejąca stacja trafo•przebudowa istniejącego kabla SN zasilającego stację STp-1 po nowej trasie na odcinku ok. 100 m.Montaż:•dwóch prefabrykowanych napowietrznych stacji transformatorowych 15/0,4kV o docelowej mocy 630 kVA•rozdzielnic RS-2 i RS-3 wraz z układami pomiarowo-rozliczeniowych na napięciu 0,4kVWykonanie:•linii kablowych nN kablem ziemnym od rozdzielnic RS-1 – RS-3 do projektowanych węzłów energetycznych W2 – W13•instalacji uziemiającejMontaż:•konstrukcji wsporczych•paneli fotowoltaicznych•inwerterów fotowoltaicznych•instalacji elektrycznej•systemu monitoringu wraz z transmisją danych (Polish)
    0 references
    The overall objective of the project is to reduce greenhouse gas emissions from the energy sector and the specific objective of producing electricity from renewable sources. The achievement of these objectives will contribute to the improvement of the environment and the protection of the environment. The project’s objectives will be achieved within a period of 12 months from the date of completion of the investment consisting of the extension of the photovoltaic (PV) plant. the investment is the construction of a PV power plant with a capacity of 1 791 kW. The planned installation will be located in Chwałowice, town of Radomyśl nad Sanem on plots Nos 2307, 2308, 2316. The plant will be composed of photovoltaic panels. The panels will cooperate with inverters having a total power of 1 791 kW (AC). The connection of the equipment is planned to the existing cable line of the SN St-1 station as a constituent element of the current solar plant 99 kW. Part of inverters is planned to connect to the existing RS. The energy produced by the plant will be supplied to the energy network SN 15 kV, via the existing electrical connection connection — SN 15 kV. The measurement of energy shall be achieved by the existing measuring gate. the project implementation includes the following:• completion of a section of the 15 kV cable line, station STP-3 and STP-2 and STP-2 and STP-1. STP-1 — existing station hit• modification of the existing SN power cable of the STP-1 station after the new route on the section ca. 100 m.rus:• two prefabricated overhead paired track stations 15/0.4 kV with a target capacity of 630 kVA• switchgear RS-2 and RS-3 switchgear with measurement and measurement systems at 0,4kVPerformance:• N cable natural cable from switchgear RS-1 to RS-3 to the projected energy nodes W2 — W13• earthing installations:• Photoerection of photovoltaic panels• electrical installations• the monitoring system together with the transmission of data (English)
    0 references

    Identifiers

    RPPK.03.01.00-18-0499/17
    0 references