Reconstruction of a sports field with a jump in a pitch in a dal line at the Primary School in Martysinka (Q119301): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The main objective of the project according to the objective assigned to Measure 6.4.3 of the ROP PP is to improve school general education and students’ physical fitness. Implementation of the project will lead to a comprehensive development of school pupils by investing in the sports infrastructure of the Primary School in Martyksza in the municipality of Tyczyn. The main objective of the project consists of the sub-objectives detailed below:...) |
||
Property / summary | |||
The main objective of the project according to the objective assigned to Measure 6.4.3 of the ROP PP is to improve school general education and students’ physical fitness. Implementation of the project will lead to a comprehensive development of school pupils by investing in the sports infrastructure of the Primary School in Martyksza in the municipality of Tyczyn. The main objective of the project consists of the sub-objectives detailed below: — improving the conditions for physical education, improving the physical performance of pupils and stimulating the interest of sport in extra-curricular activities [student sport clubs], — creating opportunities for additional sports for which there was no opportunity for the existing infrastructure — 4 new [volleyball, handball, basketball, tennis], — improving the health of children and young people — reducing negative social phenomena — bringing up sport through sport, the applicant will meet the objectives of the project by converting the existing grassland field into a pitch area of 41/22 m, enclosed, equipped with football, with an artificial surface with a rubber cube, with the following functionality: Hand and football fields. 38 x 18 m, -2 basketball court fields. 18 x 14 m each, — volleyball sports field 18 x 9 m, — natural tennis ground 23,77 x 10.97 m, — the treads and stroke of the stroke in the medal area. 43,08 x 2,5/2.83 m. Preparatory work, construction work for the ground and the subconstruction of the pitches, — construction work — pavement, — fencing and sawnings, — field equipment. (English) | |||
Property / summary: The main objective of the project according to the objective assigned to Measure 6.4.3 of the ROP PP is to improve school general education and students’ physical fitness. Implementation of the project will lead to a comprehensive development of school pupils by investing in the sports infrastructure of the Primary School in Martyksza in the municipality of Tyczyn. The main objective of the project consists of the sub-objectives detailed below: — improving the conditions for physical education, improving the physical performance of pupils and stimulating the interest of sport in extra-curricular activities [student sport clubs], — creating opportunities for additional sports for which there was no opportunity for the existing infrastructure — 4 new [volleyball, handball, basketball, tennis], — improving the health of children and young people — reducing negative social phenomena — bringing up sport through sport, the applicant will meet the objectives of the project by converting the existing grassland field into a pitch area of 41/22 m, enclosed, equipped with football, with an artificial surface with a rubber cube, with the following functionality: Hand and football fields. 38 x 18 m, -2 basketball court fields. 18 x 14 m each, — volleyball sports field 18 x 9 m, — natural tennis ground 23,77 x 10.97 m, — the treads and stroke of the stroke in the medal area. 43,08 x 2,5/2.83 m. Preparatory work, construction work for the ground and the subconstruction of the pitches, — construction work — pavement, — fencing and sawnings, — field equipment. (English) / rank | |||
Normal rank |
Revision as of 08:38, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of a sports field with a jump in a pitch in a dal line at the Primary School in Martysinka |
Project in Poland financed by DG Regio |
Statements
270,748.68 zloty
0 references
383,998.07 zloty
0 references
85.0 percent
0 references
18 January 2016
0 references
15 April 2017
0 references
GMINA TYCZYN
0 references
Celem głównym projektu adekwatnie do celu przypisanego do działania 6.4.3 RPO WP jest poprawa edukacji ogólnokształcącej i sprawności fizycznej uczniów. Realizacja projektu przyniesie wszechstronny rozwój młodzieży szkolnej poprzez inwestycje w infrastrukturę sportową Szkoły Podstawowej im. Króla Kazimierza Wielkiego w Matysówce w Gminie Tyczyn. Na cel główny projektu składają się cele cząstkowe, wyszczególnione poniżej: - poprawa warunków prowadzenia zajęć wychowania fizycznego, - poprawa sprawności fizycznej uczniów i pobudzenie zainteresowania sportem w ramach zajęć pozalekcyjnych [uczniowskie kluby sportowe], - stworzenie możliwości uprawiania dodatkowych dyscyplin sportowych, na które nie było możliwości przy istniejącej infrastrukturze - 4 nowe [piłka siatkowa, ręczna, koszykówka, tenis ziemny], - poprawa stanu zdrowia dzieci i młodzieży, - ograniczenie negatywnych zjawisk społecznych – wychowanie poprzez sport, Wnioskodawca osiągnie cele zakładane w projekcie poprzez przebudowę istniejącego boiska trawiastego na nowoczesne boisko wielofunkcyjne ze skocznią do skoku w dal o wymiarach 41/22 m, ogrodzone, wyposażone w piłkochwyty, ze sztuczną nawierzchnię z kostki gumowej, o nw. funkcjonalności: - boisko do piłki ręcznej i nożnej o wym. 38 x 18 m, - 2 boiska do koszykówki o wym. 18 x 14 m każde, - boisko do siatkówki o wym. 18 x 9 m, - boisko do tenisa ziemnego o wym. 23,77 x 10,97 m, - bieżnia i skocznia do skoku w dal o wym. 43,08 x 2,5/2,83 m. W ramach inwestycji wykonane zostaną: - roboty przygotowawcze, - roboty kształtowania terenu i podbudowy boiska, - roboty budowlane - nawierzchnie, - ogrodzenie i piłkochwyty, - wyposażenie boiska. (Polish)
0 references
The main objective of the project according to the objective assigned to Measure 6.4.3 of the ROP PP is to improve school general education and students’ physical fitness. Implementation of the project will lead to a comprehensive development of school pupils by investing in the sports infrastructure of the Primary School in Martyksza in the municipality of Tyczyn. The main objective of the project consists of the sub-objectives detailed below: — improving the conditions for physical education, improving the physical performance of pupils and stimulating the interest of sport in extra-curricular activities [student sport clubs], — creating opportunities for additional sports for which there was no opportunity for the existing infrastructure — 4 new [volleyball, handball, basketball, tennis], — improving the health of children and young people — reducing negative social phenomena — bringing up sport through sport, the applicant will meet the objectives of the project by converting the existing grassland field into a pitch area of 41/22 m, enclosed, equipped with football, with an artificial surface with a rubber cube, with the following functionality: Hand and football fields. 38 x 18 m, -2 basketball court fields. 18 x 14 m each, — volleyball sports field 18 x 9 m, — natural tennis ground 23,77 x 10.97 m, — the treads and stroke of the stroke in the medal area. 43,08 x 2,5/2.83 m. Preparatory work, construction work for the ground and the subconstruction of the pitches, — construction work — pavement, — fencing and sawnings, — field equipment. (English)
0 references
Identifiers
RPPK.06.04.03-18-0039/16
0 references