Improving the quality of the education system in Leżajsk through the upgrading and retrofitting of Primary School No 1 (Q119297): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): Investment scope: Building Primary School No. 1 — Equipment: supply of ICT equipment and teaching facilities for modern training methods for three classes, conversion of prisoners and wooden ceilings, façade work, insulation and repair in the ‘old’ part of the teaching building, and electrical works with repairs in both parts. The planned teaching aids, including ICT, will provide students with an educational opportunity to inspire science and t...)
Property / summary
 
Investment scope: Building Primary School No. 1 — Equipment: supply of ICT equipment and teaching facilities for modern training methods for three classes, conversion of prisoners and wooden ceilings, façade work, insulation and repair in the ‘old’ part of the teaching building, and electrical works with repairs in both parts. The planned teaching aids, including ICT, will provide students with an educational opportunity to inspire science and the humanities. Gymnastics hall — upgrading the sanitary and cloakroom facilities and new installations. The following will be carried out: in part, the new access to the floor of the room with the mobile lift for disabled people. The application does not include the already carried out of the demolition of concrete steps from the site in the construction project in the north. In addition to the design documentation, the scope shall include the corrective work. The direct objective of the project is to raise the conditions for general education to support key skills in the municipality of Leżajsk. Planned products: • Number of infrastructure facilities in general education supported -2 • Number of facilities adapted to the needs of under-performing persons — unit 1• Number of projects financed reasonable accommodation costs for persons with disabilities -1 • Number of places in supported childcare or educational infrastructure — 121 • Number of facilities supported with improved energy efficiency — unit 2• Number of equipment purchased as part of the project — unit 111• Number of facilities supported to strengthen the physical capacity of students — unit 1• Number of facilities to be provided within the project — unit 3. The project will increase energy efficiency by converting the service and electrical installations with the LED lighting in the school building and the gym and by thermo-modernisation of the stratcher, after its conversion, in the old part. (English)
Property / summary: Investment scope: Building Primary School No. 1 — Equipment: supply of ICT equipment and teaching facilities for modern training methods for three classes, conversion of prisoners and wooden ceilings, façade work, insulation and repair in the ‘old’ part of the teaching building, and electrical works with repairs in both parts. The planned teaching aids, including ICT, will provide students with an educational opportunity to inspire science and the humanities. Gymnastics hall — upgrading the sanitary and cloakroom facilities and new installations. The following will be carried out: in part, the new access to the floor of the room with the mobile lift for disabled people. The application does not include the already carried out of the demolition of concrete steps from the site in the construction project in the north. In addition to the design documentation, the scope shall include the corrective work. The direct objective of the project is to raise the conditions for general education to support key skills in the municipality of Leżajsk. Planned products: • Number of infrastructure facilities in general education supported -2 • Number of facilities adapted to the needs of under-performing persons — unit 1• Number of projects financed reasonable accommodation costs for persons with disabilities -1 • Number of places in supported childcare or educational infrastructure — 121 • Number of facilities supported with improved energy efficiency — unit 2• Number of equipment purchased as part of the project — unit 111• Number of facilities supported to strengthen the physical capacity of students — unit 1• Number of facilities to be provided within the project — unit 3. The project will increase energy efficiency by converting the service and electrical installations with the LED lighting in the school building and the gym and by thermo-modernisation of the stratcher, after its conversion, in the old part. (English) / rank
 
Normal rank

Revision as of 08:38, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the quality of the education system in Leżajsk through the upgrading and retrofitting of Primary School No 1
Project in Poland financed by DG Regio

    Statements

    0 references
    678,665.29 zloty
    0 references
    162,879.6696 Euro
    13 January 2020
    0 references
    1,357,958.82 zloty
    0 references
    325,910.1168 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 December 2016
    0 references
    31 August 2017
    0 references
    MIASTO LEŻAJSK
    0 references
    Zakres inwestycji: Budynek Szkoły Podstawowej nr 1 - wyposażenie: dostawa sprzętu ICT oraz wyposażenia dydaktycznego w zakresie nowoczesnych metod kształcenia dla trzech klasopracowni, przebudowa więźby dachowej i drewnianego stropu, roboty elewacji, izolacyjne i naprawcze w „starej” części budynku dydaktycznego, a roboty elektryczne z naprawczymi w obu częściach. Planowane pomoce dydaktyczne, w tym ICT będą dla uczniów ofertą edukacyjną mającą ich zainspirować naukami ścisłymi i humanistyczno-przyrodniczymi. Sala gimnastyczna - przebudowa zaplecza sanitarno-szatniowego i nowe instalacje. Wykonane zostaną: w części nowe dojście do budynku sali z podjazdem dla osób niepełnosprawnych. Wniosek nie obejmuje wykonanej już rozbiórki schodów betonowych od strony północnej sali –zawartej w projekcie budowlanym. Poza dokumentacją projektową zakres obejmuje roboty naprawcze. Bezpośrednim celem projektu jest podniesienia warunków edukacji ogólnokształcącej wspierającej kluczowe umiejętności na terenie Gminy Miasta Leżajsk. Planowane produkty : •Liczba wspartych obiektów infrastruktury edukacji ogólnej -2 szt. •Liczba obiektów dostosowanych do potrzeb osób z niepełno sprawnościami – szt.1 •Liczba projektów, w których sfinansowano koszty racjonalnych usprawnień dla osób z niepełnosprawnościami -1 szt. •Liczba miejsc w objętej wsparciem infrastrukturze w zakresie opieki nad dziećmi lub infrastrukturze edukacyjnej - 121 os. •Liczba obiektów objętych wsparciem o poprawionej wydajności energetycznej –szt.2 •Liczba zakupionego sprzętu wyposażenia w ramach projektu – szt.111 •Liczba wspartych obiektów służących wzmacnianiu sprawności fizycznej uczniów – szt.1 •Liczba pracowni doposażonych w ramach projektu – szt.3. W projekcie nastąpi zwiększenie efektywności energetycznej poprzez przebudowę instalacji c.o. i instalacji elektrycznej z oświetleniem typu LED w budynku szkolnym i sali gimnastycznej oraz przez termomodernizację stropu strychowego,po jego przebudowie - w starej części. (Polish)
    0 references
    Investment scope: Building Primary School No. 1 — Equipment: supply of ICT equipment and teaching facilities for modern training methods for three classes, conversion of prisoners and wooden ceilings, façade work, insulation and repair in the ‘old’ part of the teaching building, and electrical works with repairs in both parts. The planned teaching aids, including ICT, will provide students with an educational opportunity to inspire science and the humanities. Gymnastics hall — upgrading the sanitary and cloakroom facilities and new installations. The following will be carried out: in part, the new access to the floor of the room with the mobile lift for disabled people. The application does not include the already carried out of the demolition of concrete steps from the site in the construction project in the north. In addition to the design documentation, the scope shall include the corrective work. The direct objective of the project is to raise the conditions for general education to support key skills in the municipality of Leżajsk. Planned products: • Number of infrastructure facilities in general education supported -2 • Number of facilities adapted to the needs of under-performing persons — unit 1• Number of projects financed reasonable accommodation costs for persons with disabilities -1 • Number of places in supported childcare or educational infrastructure — 121 • Number of facilities supported with improved energy efficiency — unit 2• Number of equipment purchased as part of the project — unit 111• Number of facilities supported to strengthen the physical capacity of students — unit 1• Number of facilities to be provided within the project — unit 3. The project will increase energy efficiency by converting the service and electrical installations with the LED lighting in the school building and the gym and by thermo-modernisation of the stratcher, after its conversion, in the old part. (English)
    0 references

    Identifiers

    RPPK.06.04.03-18-0035/16
    0 references