Emergency Measures 2017 — Water Resource Improvement — Combani Dam — Flood Evacuator Upgrade and Telemetry Design (Q3700755): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Completion of the upgrade of the Combani Dam Flood Evacuator in order to modify the evacuator by allowing the storage of an additional volume (increase of the RN by one metre) while ensuring a level of safety of the dam in accordance with regulatory requirements., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Emergency Measures 2017 — Water Resource Improvement — Combani Dam — Flood Evacuator Upgrade and Telemetry Design

Revision as of 11:55, 22 November 2021

Project Q3700755 in France
Language Label Description Also known as
English
Emergency Measures 2017 — Water Resource Improvement — Combani Dam — Flood Evacuator Upgrade and Telemetry Design
Project Q3700755 in France

    Statements

    0 references
    1,179,229.0 Euro
    0 references
    2,034,194.0 Euro
    0 references
    57.97 percent
    0 references
    15 January 2017
    0 references
    31 December 2019
    0 references
    SI D'EAU ET D'ASSAINISSEMENT DE MAYOTTE (SIEAM)
    0 references
    Réalisation des travaux de la rehausse de l'évacuateur de crues du barrage de Combani afin de modifier l'évacuateur en permettant le stockage d'un volume supplémentaire (élévation de la RN d'un mètre) tout en assurant un niveau de sûreté du barrage conforme aux exigences réglementaires. (French)
    0 references
    Completion of the upgrade of the Combani Dam Flood Evacuator in order to modify the evacuator by allowing the storage of an additional volume (increase of the RN by one metre) while ensuring a level of safety of the dam in accordance with regulatory requirements. (English)
    22 November 2021
    0 references

    Identifiers

    PY0017590
    0 references