Implementation of the Sanitation System of the Centre Tranche 1 Collection Networks (Priority) Phase 2 (Q3700750): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Implementation of the Centre’s Sanitation System (SADA Chiconi, and Ouangani) -Strength 1 Phase 2 Collection System. The project is located in the department of Mayotte. The work in the central area of Mayotte is part of this framework and in line with the conclusions of the SDAUE., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Implementation of the Sanitation System of the Centre Tranche 1 Collection Networks (Priority) Phase 2

Revision as of 11:55, 22 November 2021

Project Q3700750 in France
Language Label Description Also known as
English
Implementation of the Sanitation System of the Centre Tranche 1 Collection Networks (Priority) Phase 2
Project Q3700750 in France

    Statements

    0 references
    4,400,000.0 Euro
    0 references
    8,000,000.0 Euro
    0 references
    55.0 percent
    0 references
    15 January 2017
    0 references
    1 July 2020
    0 references
    Syndicat Intercommunal d'Eau et d'Assainissement de Mayotte (SIEAM)
    0 references
    Réalisation du système d'assainissement du Centre (SADA CHICONI, et OUANGANI) -Réseau de collecte Tranche 1 Phase 2. Le projet est localisé dans le département de Mayotte. Les travaux dans la zone centre de Mayotte s'inscrivent dans ce cadre et en cohérence avec les conclusions du SDAUE. (French)
    0 references
    Implementation of the Centre’s Sanitation System (SADA Chiconi, and Ouangani) -Strength 1 Phase 2 Collection System. The project is located in the department of Mayotte. The work in the central area of Mayotte is part of this framework and in line with the conclusions of the SDAUE. (English)
    22 November 2021
    0 references

    Identifiers

    PY0011361
    0 references