Construction of the university restaurant building (Q3700401): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): This is the construction of a building on the site of the Guyana University Pole (PUG), with a floor area of 1 825 m² on a plot of 3.500 m², facing the building of the Student Life. The purpose of the building will be university restoration for students and PUG staff. The kitchen will produce 1500 meals per day and the dining room will have a seating capacity of 1000. At the end of the works the building will be made available to the CROUS Antil...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Construction of the university restaurant building

Revision as of 11:50, 22 November 2021

Project Q3700401 in France
Language Label Description Also known as
English
Construction of the university restaurant building
Project Q3700401 in France

    Statements

    0 references
    2,968,000.0 Euro
    0 references
    6,285,000.0 Euro
    0 references
    47.22 percent
    0 references
    1 June 2015
    0 references
    1 October 2017
    0 references
    Rectorat de la Guyane
    0 references
    Il s'agit de la construction d'un bâtiment sur le site du Pôle Universitaire Guyanais (PUG), avec une superficie du plancher de 1825m2 sur un terrain de 3500m2, face au bâtiment de la Vie Etudiante. Le bâtiment aura comme vocation la restauration universitaire pour les étudiants et le personnel du PUG. La cuisine pourra produire 1500 repas par jour et la salle à manger aura une capacité de 1000 places assises. A la fin des travaux le bâtiment sera mis à disposition au CROUS Antilles-Guyane, qui sera le gestionnaire du restaurant universitaire. (French)
    0 references
    This is the construction of a building on the site of the Guyana University Pole (PUG), with a floor area of 1 825 m² on a plot of 3.500 m², facing the building of the Student Life. The purpose of the building will be university restoration for students and PUG staff. The kitchen will produce 1500 meals per day and the dining room will have a seating capacity of 1000. At the end of the works the building will be made available to the CROUS Antilles-Guyane, who will be the manager of the university restaurant. (English)
    22 November 2021
    0 references

    Identifiers

    GY0000646
    0 references