(‎Created claim: summary (P836): The project involves carrying out works that are aimed at thermo-modernisation of a public service of an educational nature, i.e. the place of establishment of an undertaking in Buków Śląska. The planned investment includes the modernisation of the CO system with the replacement of a boiler with a high-efficiency boiler using a renewable fuel (pellet), the modernisation of the hot-water installations, including the installation of solar panels,...)
Property / summary
 
The project involves carrying out works that are aimed at thermo-modernisation of a public service of an educational nature, i.e. the place of establishment of an undertaking in Buków Śląska. The planned investment includes the modernisation of the CO system with the replacement of a boiler with a high-efficiency boiler using a renewable fuel (pellet), the modernisation of the hot-water installations, including the installation of solar panels, the insulation of horizontal and vertical divisions together with the replacement of window and door frames and the creation of a green wall in the nursery building. The implementation of the project will lead to a significant reduction in pollutant emissions (mainly CO2) and a significant reduction in the costs incurred by the heating of the facility. The technological approach used in the project was adopted on the basis of the energy audit. It should be stressed that the project carries out the full scope of work resulting from the audit, while at the same time it does not foresee any other tasks not recommended by the energy audit (except for promotion expenditure). The project is also in line with the territorially competent National Low Carbon Economy Plan adopted by the Council of Names on 2016-10-27 The project is planned to carry out the project. 9 months in 2019 (material implementation from 2019-04-01 to 2019-11-30, financial end 2019-12-31). The start of the implementation will be preceded by the selection of the contractor for the construction and assembly work. The applicant is applying for a financial contribution of PLN 499 800,00, which represents 85.00 % of the eligible costs. The product products will be the energy modernised 1 building with a usable (thermal modernisation) floor area of 594 m², 2 units of heat generation from RES that have been built, and 1 heat generators will be modernised. (English)
Property / summary: The project involves carrying out works that are aimed at thermo-modernisation of a public service of an educational nature, i.e. the place of establishment of an undertaking in Buków Śląska. The planned investment includes the modernisation of the CO system with the replacement of a boiler with a high-efficiency boiler using a renewable fuel (pellet), the modernisation of the hot-water installations, including the installation of solar panels, the insulation of horizontal and vertical divisions together with the replacement of window and door frames and the creation of a green wall in the nursery building. The implementation of the project will lead to a significant reduction in pollutant emissions (mainly CO2) and a significant reduction in the costs incurred by the heating of the facility. The technological approach used in the project was adopted on the basis of the energy audit. It should be stressed that the project carries out the full scope of work resulting from the audit, while at the same time it does not foresee any other tasks not recommended by the energy audit (except for promotion expenditure). The project is also in line with the territorially competent National Low Carbon Economy Plan adopted by the Council of Names on 2016-10-27 The project is planned to carry out the project. 9 months in 2019 (material implementation from 2019-04-01 to 2019-11-30, financial end 2019-12-31). The start of the implementation will be preceded by the selection of the contractor for the construction and assembly work. The applicant is applying for a financial contribution of PLN 499 800,00, which represents 85.00 % of the eligible costs. The product products will be the energy modernised 1 building with a usable (thermal modernisation) floor area of 594 m², 2 units of heat generation from RES that have been built, and 1 heat generators will be modernised. (English) / rank
 
Normal rank

Revision as of 08:12, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of Buków Śląskie.
Project in Poland financed by DG Regio

    Statements

    0 references
    499,800.0 zloty
    0 references
    119,952.0 Euro
    13 January 2020
    0 references
    588,000.0 zloty
    0 references
    141,120.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2019
    0 references
    31 December 2019
    0 references
    GMINA NAMYSŁÓW
    0 references
    Projekt obejmuje przeprowadzenie prac ukierunkowanych na głęboką termomodernizacje obiektu użyteczności publicznej o charakterze edukacyjnym, tj. siedziby Przedszkola w Bukowie Śląskiej. Planowana inwestycja obejmuje modernizację instalacji CO wraz z wymianą kotła na wysokosprawny kocioł wykorzystujący paliwa odnawialne (pellet), modernizację instalacji c.w.u., wraz z instalacją paneli fotowoltaicznych, docieplenie przegród poziomych i pionowych wraz z wymianą stolarki okiennej i drzwiowej, a także planowane jest utworzenie zielonej ściany w budynku przedszkola. Realizacja projektu przyczyni się do znacznego ograniczenia emisji zanieczyszczeń (głównie CO2) oraz istotnego ograniczenia kosztów ponoszonych na ogrzewanie obiektu. Podejście technologiczne zastosowane w projekcie zostało przyjęte na bazie opracowanego audytu energetycznego. Należy podkreślić, że projekt realizuje cały zakres prac wynikający z opracowanego audytu, a jednocześnie nie przewiduje realizacji żadnych innych zadań nie zalecanych przez audyt energetyczny (wyjątkiem są wydatki na działania promocyjne). Projekt jest także zgodny z właściwym terytorialnie Planem Gospodarki Niskoemisyjnej, przyjętym przez Radę Gminy Namysłów w dn. 2016-10-27. Realizacja projektu planowana jest na ok. 9 miesięcy w 2019 r. (realizacja rzeczowa od 2019-04-01 do 2019-11-30, zakończenie finansowe 2019-12-31). Rozpoczęcie rzeczowej realizacji zostanie poprzedzone przeprowadzeniem wyboru wykonawcy prac budowlano-montażowych. Wnioskodawca ubiega się o dofinansowanie w kwocie 499 800,00 zł, co stanowi 85,00% kosztów kwalifikowanych. Produktami projektu będzie zmodernizowany energetycznie 1 budynek, o powierzchnia użytkowej (poddanej termomodernizacji) 594 m2, wybudowane 2 jednostki wytwarzania energii cieplnej z OZE, oraz zmodernizowane zostanie 1 źródeł ciepła. (Polish)
    0 references
    The project involves carrying out works that are aimed at thermo-modernisation of a public service of an educational nature, i.e. the place of establishment of an undertaking in Buków Śląska. The planned investment includes the modernisation of the CO system with the replacement of a boiler with a high-efficiency boiler using a renewable fuel (pellet), the modernisation of the hot-water installations, including the installation of solar panels, the insulation of horizontal and vertical divisions together with the replacement of window and door frames and the creation of a green wall in the nursery building. The implementation of the project will lead to a significant reduction in pollutant emissions (mainly CO2) and a significant reduction in the costs incurred by the heating of the facility. The technological approach used in the project was adopted on the basis of the energy audit. It should be stressed that the project carries out the full scope of work resulting from the audit, while at the same time it does not foresee any other tasks not recommended by the energy audit (except for promotion expenditure). The project is also in line with the territorially competent National Low Carbon Economy Plan adopted by the Council of Names on 2016-10-27 The project is planned to carry out the project. 9 months in 2019 (material implementation from 2019-04-01 to 2019-11-30, financial end 2019-12-31). The start of the implementation will be preceded by the selection of the contractor for the construction and assembly work. The applicant is applying for a financial contribution of PLN 499 800,00, which represents 85.00 % of the eligible costs. The product products will be the energy modernised 1 building with a usable (thermal modernisation) floor area of 594 m², 2 units of heat generation from RES that have been built, and 1 heat generators will be modernised. (English)
    0 references

    Identifiers

    RPOP.03.02.01-16-0009/18
    0 references