Every nursery school has chances of success (Q116379): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project is aimed at all children (Dz.) from Entrepreneurship 3 from the Hajnówka River Integrated Department, including 56 children (25 children (K), 31 boys (M)). This includes the possibility for all kindergartens to use the doactino — educators for an extended period of pre-school work, including: on closing days at the end of the day 17.00 hours at 18.30 (1,5 hours) and open at Saturday from 8.00 to 16.00 (8 hours). In addition, the proj...) |
||
Property / summary | |||
The project is aimed at all children (Dz.) from Entrepreneurship 3 from the Hajnówka River Integrated Department, including 56 children (25 children (K), 31 boys (M)). This includes the possibility for all kindergartens to use the doactino — educators for an extended period of pre-school work, including: on closing days at the end of the day 17.00 hours at 18.30 (1,5 hours) and open at Saturday from 8.00 to 16.00 (8 hours). In addition, the project will expand the offer of nursery schools to 33 children [11K, 22M] in terms of a deficit, including: 12 children [1K, 11 M] with special needs and 21 children [10K, 11 M] with opinions on the need for psychological and pedagogical assistance, a decision on physical disability, opinions on sensory integration or other documents establishing deficits. The project will tailor the playground’s playground to the needs of children with deficits by providing for the retrofitting and fitting of the field equipment with safe surfaces. The project also implies an increase in the skills and professional competences of 10 teachers (N- 10K). (English) | |||
Property / summary: The project is aimed at all children (Dz.) from Entrepreneurship 3 from the Hajnówka River Integrated Department, including 56 children (25 children (K), 31 boys (M)). This includes the possibility for all kindergartens to use the doactino — educators for an extended period of pre-school work, including: on closing days at the end of the day 17.00 hours at 18.30 (1,5 hours) and open at Saturday from 8.00 to 16.00 (8 hours). In addition, the project will expand the offer of nursery schools to 33 children [11K, 22M] in terms of a deficit, including: 12 children [1K, 11 M] with special needs and 21 children [10K, 11 M] with opinions on the need for psychological and pedagogical assistance, a decision on physical disability, opinions on sensory integration or other documents establishing deficits. The project will tailor the playground’s playground to the needs of children with deficits by providing for the retrofitting and fitting of the field equipment with safe surfaces. The project also implies an increase in the skills and professional competences of 10 teachers (N- 10K). (English) / rank | |||
Normal rank |
Revision as of 11:55, 9 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Every nursery school has chances of success |
Project in Poland financed by DG Regio |
Statements
423,996.0 zloty
0 references
498,980.0 zloty
0 references
84.97 percent
0 references
1 August 2018
0 references
30 August 2019
0 references
GMINA MIEJSKA HAJNÓWKA
0 references
Projekt skierowany jest do wszystkich dzieci (dz) z Przedszkola nr 3 z Oddziałami Integracyjnymi w Hajnówce, łącznie obejmie 56 dzieci [25 dzieci (K), 31 chłopców (M)]. Obejmuje umożliwienie wszystkim przedszkolakom korzystania z opieki dodaktyczno - wychowawczej w wydłużonym czasie pracy przedszkola, w tym: w dni powszednie z godz. 17.00 na godz. 18.30 (1,5 godziny) i otwarcie w soboty w godz od 8.00 do 16.00 (8 godzin). Ponadto w ramach projektu rozszerzona zostanie oferta przedszkola o dodatkowe zajęcia specjalistyczne dla 33 dzieci [11K, 22M] w zakresie stwierdzonych deficytow, w tym: dla 12 dzieci [1K, 11 M] posiadających orzeczenia o potrzebie kształcenia specjalnego oraz 21 dzieci [10K, 11 M] posiadających opinie o potrzebie pomocy psychologiczno-pedagogicznej, orzeczenie o niepełnosprawności fizycznej, opinie Integracji Sensorycznej lub inne dokumenty stwierdzające występowanie deficytów. W ramach projektu zostanie dostosowany plac zabaw do potrzeb dzieci z deficytami poprzez doposażenie i montaż urządzeń terenowych z bezpieczną nawierzchnią. Projekt zakłada również podniesienie umiejętnosci i kompetencji zawodowych 10 nauczycieli (N- 10K). (Polish)
0 references
The project is aimed at all children (Dz.) from Entrepreneurship 3 from the Hajnówka River Integrated Department, including 56 children (25 children (K), 31 boys (M)). This includes the possibility for all kindergartens to use the doactino — educators for an extended period of pre-school work, including: on closing days at the end of the day 17.00 hours at 18.30 (1,5 hours) and open at Saturday from 8.00 to 16.00 (8 hours). In addition, the project will expand the offer of nursery schools to 33 children [11K, 22M] in terms of a deficit, including: 12 children [1K, 11 M] with special needs and 21 children [10K, 11 M] with opinions on the need for psychological and pedagogical assistance, a decision on physical disability, opinions on sensory integration or other documents establishing deficits. The project will tailor the playground’s playground to the needs of children with deficits by providing for the retrofitting and fitting of the field equipment with safe surfaces. The project also implies an increase in the skills and professional competences of 10 teachers (N- 10K). (English)
0 references
Identifiers
RPPD.03.01.01-20-0270/17
0 references