Q3694702 (Q3694702): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: Setting new description) |
(Created claim: summary (P836): The aim of this operation is to restore sedimentary and biological continuity to the threshold of the Pont des Chemins de Fer de Provence, located on the river Bléone, in the commune of Digne-les-Bains; the operation is included in an intervention program on four thresholds of this river (“work plan for the restoration of ecological continuity on the Bléone River”). The operation also incorporates the so-called accompanying measures, i.e. on the...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of this operation is to restore sedimentary and biological continuity to the threshold of the Pont des Chemins de Fer de Provence, located on the river Bléone, in the commune of Digne-les-Bains; the operation is included in an intervention program on four thresholds of this river (“work plan for the restoration of ecological continuity on the Bléone River”). The operation also incorporates the so-called accompanying measures, i.e. on the one hand the work made necessary by the disappearance of the threshold and the expected consequences for the evolution of the bottom of the river bed (consolidation of the two piles of the railway bridge and rehabilitation of the dike feet) and, on the other hand, measures to reduce environmental impacts. (English) | |||||||||||||||
Property / summary: The aim of this operation is to restore sedimentary and biological continuity to the threshold of the Pont des Chemins de Fer de Provence, located on the river Bléone, in the commune of Digne-les-Bains; the operation is included in an intervention program on four thresholds of this river (“work plan for the restoration of ecological continuity on the Bléone River”). The operation also incorporates the so-called accompanying measures, i.e. on the one hand the work made necessary by the disappearance of the threshold and the expected consequences for the evolution of the bottom of the river bed (consolidation of the two piles of the railway bridge and rehabilitation of the dike feet) and, on the other hand, measures to reduce environmental impacts. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of this operation is to restore sedimentary and biological continuity to the threshold of the Pont des Chemins de Fer de Provence, located on the river Bléone, in the commune of Digne-les-Bains; the operation is included in an intervention program on four thresholds of this river (“work plan for the restoration of ecological continuity on the Bléone River”). The operation also incorporates the so-called accompanying measures, i.e. on the one hand the work made necessary by the disappearance of the threshold and the expected consequences for the evolution of the bottom of the river bed (consolidation of the two piles of the railway bridge and rehabilitation of the dike feet) and, on the other hand, measures to reduce environmental impacts. (English) / qualifier | |||||||||||||||
point in time: 22 November 2021
|
Revision as of 10:25, 22 November 2021
Project Q3694702 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3694702 in France |
Statements
1,463,188.0 Euro
0 references
2,926,376.0 Euro
0 references
50.0 percent
0 references
13 February 2018
0 references
12 February 2021
0 references
SYNDICAT MIXTE ASSE BLEONE
0 references
Cette opération d’arasement complet du seuil du Pont des Chemins de Fer de Provence, localisé sur la rivière Bléone, dans la commune de Digne-les-Bains, vise le rétablissement de la continuité sédimentaire et biologique ; l’opération est inscrite dans un programme d’intervention sur quatre seuils de cette rivière (« programme de travaux visant au rétablissement des continuités écologiques sur la Bléone »). L’opération intègre aussi les mesures dites « d’accompagnement », c’est-à-dire d’une part les travaux rendus nécessaires par la disparition du seuil et les conséquences attendues sur l’évolution du fond du lit de la rivière (consolidation des deux piles du Pont ferroviaire et réfection des pieds de digues) et d’autre part les mesures de réduction des impacts environnementaux. (French)
0 references
The aim of this operation is to restore sedimentary and biological continuity to the threshold of the Pont des Chemins de Fer de Provence, located on the river Bléone, in the commune of Digne-les-Bains; the operation is included in an intervention program on four thresholds of this river (“work plan for the restoration of ecological continuity on the Bléone River”). The operation also incorporates the so-called accompanying measures, i.e. on the one hand the work made necessary by the disappearance of the threshold and the expected consequences for the evolution of the bottom of the river bed (consolidation of the two piles of the railway bridge and rehabilitation of the dike feet) and, on the other hand, measures to reduce environmental impacts. (English)
22 November 2021
0 references
Identifiers
PA0019663
0 references