Establishment of Interdisciplinary Centre for oncology and Transplantology (Q114500): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project entitled: The establishment of an Interdisciplinary Centre of Torocolonology and Transplantology is part of the project types for Pina 12.1.2 in accordance with the SZOOP and the competition rules, and includes the upgrading and modernisation of the site of health infrastructure and its equipment in medical equipment and IT solutions (software, hardware). The scope of the project includes tasks of: 1.Pre-construction and superstructu...)
Property / summary
 
The project entitled: The establishment of an Interdisciplinary Centre of Torocolonology and Transplantology is part of the project types for Pina 12.1.2 in accordance with the SZOOP and the competition rules, and includes the upgrading and modernisation of the site of health infrastructure and its equipment in medical equipment and IT solutions (software, hardware). The scope of the project includes tasks of: 1.Pre-construction and superstructure work 2 Construction and superstructure construction of the construction and superstructure building of the construction of a 3.Purchase of medical equipment 4. purchase of equipment 1.5 T 5. purchase of equipment IT 6. purchase of economic equipment 7.Indirect costs, including promotion 1. Reconstruction of the first renovation of the construction of the construction of the BUILDINGS of 312.22 m² and the upgrading of the KCKP area with a surface area of 2 724 m², including: The alterations to the basement of the cellar, with a room for the installation of the x-ray apparatus, the cloakroom, the space of Pro-Morte, a room for pre-installation of the equipment and storage facilities, and the reconstruction of a part of the premises on the ground floor with a view to the establishment of an operating room for the ambulance, an increase in the patient lock between the ambulance station and the OAITP room, the development of an enhanced patient watch room, the extension of the peace of the OAITP doctors’ room, the extension of the peace of the OAITP doctors’ room and connection with the construction of a part of the terrace over the part of the division over the part of the branch to overbuild the engine room 2. PURCHASE OF THE NECESSARY MEDICAL, IT AND ECONOMIC EQUIPMENT 3. The purchase of INFRASTRUCTURE’S INFRASTRUCTURE (MAGNETTS) 1.5 T Adopted solutions are in conformity with the Regulation. The Minister for Transport, Construction and the Maritime Economy of 05.07.2013 amending the Regulation on technical conditions to be met by buildings and their location. The investment takes into account the best value for money. (English)
Property / summary: The project entitled: The establishment of an Interdisciplinary Centre of Torocolonology and Transplantology is part of the project types for Pina 12.1.2 in accordance with the SZOOP and the competition rules, and includes the upgrading and modernisation of the site of health infrastructure and its equipment in medical equipment and IT solutions (software, hardware). The scope of the project includes tasks of: 1.Pre-construction and superstructure work 2 Construction and superstructure construction of the construction and superstructure building of the construction of a 3.Purchase of medical equipment 4. purchase of equipment 1.5 T 5. purchase of equipment IT 6. purchase of economic equipment 7.Indirect costs, including promotion 1. Reconstruction of the first renovation of the construction of the construction of the BUILDINGS of 312.22 m² and the upgrading of the KCKP area with a surface area of 2 724 m², including: The alterations to the basement of the cellar, with a room for the installation of the x-ray apparatus, the cloakroom, the space of Pro-Morte, a room for pre-installation of the equipment and storage facilities, and the reconstruction of a part of the premises on the ground floor with a view to the establishment of an operating room for the ambulance, an increase in the patient lock between the ambulance station and the OAITP room, the development of an enhanced patient watch room, the extension of the peace of the OAITP doctors’ room, the extension of the peace of the OAITP doctors’ room and connection with the construction of a part of the terrace over the part of the division over the part of the branch to overbuild the engine room 2. PURCHASE OF THE NECESSARY MEDICAL, IT AND ECONOMIC EQUIPMENT 3. The purchase of INFRASTRUCTURE’S INFRASTRUCTURE (MAGNETTS) 1.5 T Adopted solutions are in conformity with the Regulation. The Minister for Transport, Construction and the Maritime Economy of 05.07.2013 amending the Regulation on technical conditions to be met by buildings and their location. The investment takes into account the best value for money. (English) / rank
 
Normal rank

Revision as of 11:51, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Establishment of Interdisciplinary Centre for oncology and Transplantology
Project in Poland financed by DG Regio

    Statements

    0 references
    16,424,999.91 zloty
    0 references
    3,941,999.9784 Euro
    13 January 2020
    0 references
    21,900,000.0 zloty
    0 references
    5,256,000.0 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    24 April 2015
    0 references
    31 December 2018
    0 references
    KRAKOWSKI SZPITAL SPECJALISTYCZNY IM. JANA PAWŁA II
    0 references
    Projekt pn. Utworzenie Interdyscyplinarnego Centrum Torakoonkologii i Transplantologii wpisuje się w typy projektów dla Poddziałnia 12.1.2 zgodnie z SZOOP i regulaminem konkursu i obejmuje przebudowę i modernizację obiektu infrastruktury ochrony zdrowia i jego wyposażenie w sprzęt medyczny oraz rozwiązania w zakresie IT (oprogramowanie, sprzęt). Zakres rzeczowy projektu obejmuje zadania: 1.Prace przygotowawcze 2.Przebudowa i nadbudowa budynku Torakochirurgii-prace budowlane 3.Zakup wyposażenia medycznego 4.Zakup infrastruktury rezonansu magnetycznego 1.5 T 5.Zakup wyposażenia IT 6.Zakup wyposażenia gospodarczego 7.Koszty pośrednie, w tym promocja 1. PRZEBUDOWA I NADBUDOWA BUDYNKU TORAKOCHIRURGII (rozbudowa o 312,22m2 i modernizacja OKCKP części o powierzchni2724m2), w tym: -przebudowa piwnic z dostos.pomieszczeń do zamontowania aparatu RTG, szatnią, pomieszczeniem Pro-Morte, pomieszczeniem wstępnej dezynfekcji sprzętu i magazynów -przebudowa części pomieszczeń na parterze celem powstania sali wybudzeń dla Bloku Operacyjnego, powiększenie śluzy dla pacjentów pomiędzy Blokiem Operacyjnym a OAITP, powstanie nowej sali operacyjnej, przeprojektowanie pomieszczeń przy śluzie dla karetek na pracownię USG, zaprojektowanie sali wzmożonego nadzoru pacjentów, powiększenie pokoju lekarzy OAITP -rozbudowa I p. przez nadbudowanie nad parterem pomieszczeń i połączenie w całość z istniejącymi na I p. -wzmocnienie stropu żelbetowego Akermana nad parterem przed rozbudową I p. -zabudowa części tarasu nad parterem -moderniz. części pomieszczeń całego oddziału -nadbudowa maszynowni 2. ZAKUP NIEZBĘDNEGO WYPOSAŻENIA MEDYCZNEGO, INFORMATYCZNEGO I GOSPODARCZEGO 3. ZAKUP INFRASTRUKTURY REZONANSU MAGNETYCZNEGO 1.5 T Przyjęte rozwiązania są zgodne z Rozporządz. Ministra Transportu, Budownictwa i Gospodarki Morskiej z 05.07.2013 zmieniającym rozporządz. w sprawie warunków technicznych, jakim powinny odpowiadać budynki i ich usytuowanie. Inwestycja zakłada optymalną relację jakości do cen. (Polish)
    0 references
    The project entitled: The establishment of an Interdisciplinary Centre of Torocolonology and Transplantology is part of the project types for Pina 12.1.2 in accordance with the SZOOP and the competition rules, and includes the upgrading and modernisation of the site of health infrastructure and its equipment in medical equipment and IT solutions (software, hardware). The scope of the project includes tasks of: 1.Pre-construction and superstructure work 2 Construction and superstructure construction of the construction and superstructure building of the construction of a 3.Purchase of medical equipment 4. purchase of equipment 1.5 T 5. purchase of equipment IT 6. purchase of economic equipment 7.Indirect costs, including promotion 1. Reconstruction of the first renovation of the construction of the construction of the BUILDINGS of 312.22 m² and the upgrading of the KCKP area with a surface area of 2 724 m², including: The alterations to the basement of the cellar, with a room for the installation of the x-ray apparatus, the cloakroom, the space of Pro-Morte, a room for pre-installation of the equipment and storage facilities, and the reconstruction of a part of the premises on the ground floor with a view to the establishment of an operating room for the ambulance, an increase in the patient lock between the ambulance station and the OAITP room, the development of an enhanced patient watch room, the extension of the peace of the OAITP doctors’ room, the extension of the peace of the OAITP doctors’ room and connection with the construction of a part of the terrace over the part of the division over the part of the branch to overbuild the engine room 2. PURCHASE OF THE NECESSARY MEDICAL, IT AND ECONOMIC EQUIPMENT 3. The purchase of INFRASTRUCTURE’S INFRASTRUCTURE (MAGNETTS) 1.5 T Adopted solutions are in conformity with the Regulation. The Minister for Transport, Construction and the Maritime Economy of 05.07.2013 amending the Regulation on technical conditions to be met by buildings and their location. The investment takes into account the best value for money. (English)
    0 references

    Identifiers

    RPMP.12.01.02-12-0605/16
    0 references