Disposal and disposal of asbestos products from the town of Tokarnia. (Q112590): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project covers the dismantling, packaging and transport and storage at landfill sites of materials which are dangerous to cover the roof and façade elements of buildings containing asbestos. The project plans to dismantle and dispose of asbestos products from 90 sites. The total mass of dismantled and discarded asbestos is estimated to be 324 Mg. The project is aimed at property owners located in Tokarnia municipality. Asbestos panels will b...) |
||
Property / summary | |||
The project covers the dismantling, packaging and transport and storage at landfill sites of materials which are dangerous to cover the roof and façade elements of buildings containing asbestos. The project plans to dismantle and dispose of asbestos products from 90 sites. The total mass of dismantled and discarded asbestos is estimated to be 324 Mg. The project is aimed at property owners located in Tokarnia municipality. Asbestos panels will be disposed of in both residential buildings and economic buildings. 100 dismantled and disposed asbestos containing objects will have a first or second degree of urgency in terms of technical state according to the inventory. under the project, 2 zadania:1.Demontaż and the use of asbestos products.2.Indirect costs, including project management and promotion, will be carried out. (English) | |||
Property / summary: The project covers the dismantling, packaging and transport and storage at landfill sites of materials which are dangerous to cover the roof and façade elements of buildings containing asbestos. The project plans to dismantle and dispose of asbestos products from 90 sites. The total mass of dismantled and discarded asbestos is estimated to be 324 Mg. The project is aimed at property owners located in Tokarnia municipality. Asbestos panels will be disposed of in both residential buildings and economic buildings. 100 dismantled and disposed asbestos containing objects will have a first or second degree of urgency in terms of technical state according to the inventory. under the project, 2 zadania:1.Demontaż and the use of asbestos products.2.Indirect costs, including project management and promotion, will be carried out. (English) / rank | |||
Normal rank |
Revision as of 11:49, 9 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Disposal and disposal of asbestos products from the town of Tokarnia. |
Project in Poland financed by DG Regio |
Statements
115,382.78 zloty
0 references
135,744.47 zloty
0 references
85.0 percent
0 references
1 August 2017
0 references
31 December 2019
0 references
GMINA TOKARNIA
0 references
Przedmiotem projektu jest demontaż, pakowanie i transport oraz składowanie na składowiskach materiałów niebezpiecznych pokryć dachowych ilub elementów elewacji budynków zawierających azbest. W ramach projektu planuje się demontaż i utylizację wyrobów azbestowych z 90 obiektów. Szacuje się, że łączna masa zdemontowanego i zutylizowanego azbestu wyniesie 324 Mg. Projekt skierowany jest do właścicieli nieruchomości zlokalizowanych na terenie Gminy Tokarnia. Płyty zawierające azbest zostaną zutylizowane zarówno z budynków mieszkalnych, jak również budynków gospodarczych. 100 zdemontowanych i zutylizowanych obiektów zawierających azbest będzie posiadać I lub II stopień pilności pod względem stanu technicznego zgodnie z inwentaryzacją W ramach projektu zrealizowane zostaną 2 zadania:1.Demontaż i utylizacja wyrobów azbestowych.2.Koszty pośrednie, w tym zarządzanie projektem i promocja. (Polish)
0 references
The project covers the dismantling, packaging and transport and storage at landfill sites of materials which are dangerous to cover the roof and façade elements of buildings containing asbestos. The project plans to dismantle and dispose of asbestos products from 90 sites. The total mass of dismantled and discarded asbestos is estimated to be 324 Mg. The project is aimed at property owners located in Tokarnia municipality. Asbestos panels will be disposed of in both residential buildings and economic buildings. 100 dismantled and disposed asbestos containing objects will have a first or second degree of urgency in terms of technical state according to the inventory. under the project, 2 zadania:1.Demontaż and the use of asbestos products.2.Indirect costs, including project management and promotion, will be carried out. (English)
0 references
Identifiers
RPMP.05.02.02-12-0480/17
0 references