Reducing low emissions from the housing sector in the municipality of Gfish by means of co-financing the replacement of low legal heat sources with solid fuel for modern heating equipment (Q112427): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project involves the replacement of 150 inefficient heat sources based on solid fuels, into modern heating appliances with fittings and fittings, and for the fitting and adaptation of hot and hot water heaters in residential buildings in the municipality of Gfish. The scope of the modernisation works will be based on the energy assessment of each building. The project does not plan to connect residential buildings to the local district heati...) |
||
Property / summary | |||
The project involves the replacement of 150 inefficient heat sources based on solid fuels, into modern heating appliances with fittings and fittings, and for the fitting and adaptation of hot and hot water heaters in residential buildings in the municipality of Gfish. The scope of the modernisation works will be based on the energy assessment of each building. The project does not plan to connect residential buildings to the local district heating network, hence the project relates only to the replacement of old heat sources for new installations of solid fuel boilers 145 and heat pumps 5. material scope of the project: Activity 1: project documentation Action 1.1. Preparation of the financial and economic analysis of the Action 1.2 project. Preparation of financial and economic analysis of project 2. replacement of non-organic heat sources Action 2.1. Replacement of boilers, Measure 2.2. The work of the installation of the internal installation ADAPT3 is carried out by action to raise the awareness of green society, Action 3.1. Workshop training organisation 4 Indirect costs, Action 4.1. Costs of information and publicity, project management and checks on the modernisation and operation of heating systems: estimated annual decrease in greenhouse gas emissions: 424,921 Mg CO2Year 34,42 emission levels for PM10: base 4,511 Mgr, Target 0,170 Mgr 96,22, PM2,5 emission level: the baseline 1,899 Mgr 91,47, the target 0,162 Mgr of the project will additionally consist of a system to control the modernisation and operation of heating systems and carry out actions to raise the awareness of the public in the form of training for energy efficient energy management, aimed at a wide audience of the municipality. In addition, the need to implement this project results from the POP registration for Małopolskie and PGN of Gfish Municipality. (English) | |||
Property / summary: The project involves the replacement of 150 inefficient heat sources based on solid fuels, into modern heating appliances with fittings and fittings, and for the fitting and adaptation of hot and hot water heaters in residential buildings in the municipality of Gfish. The scope of the modernisation works will be based on the energy assessment of each building. The project does not plan to connect residential buildings to the local district heating network, hence the project relates only to the replacement of old heat sources for new installations of solid fuel boilers 145 and heat pumps 5. material scope of the project: Activity 1: project documentation Action 1.1. Preparation of the financial and economic analysis of the Action 1.2 project. Preparation of financial and economic analysis of project 2. replacement of non-organic heat sources Action 2.1. Replacement of boilers, Measure 2.2. The work of the installation of the internal installation ADAPT3 is carried out by action to raise the awareness of green society, Action 3.1. Workshop training organisation 4 Indirect costs, Action 4.1. Costs of information and publicity, project management and checks on the modernisation and operation of heating systems: estimated annual decrease in greenhouse gas emissions: 424,921 Mg CO2Year 34,42 emission levels for PM10: base 4,511 Mgr, Target 0,170 Mgr 96,22, PM2,5 emission level: the baseline 1,899 Mgr 91,47, the target 0,162 Mgr of the project will additionally consist of a system to control the modernisation and operation of heating systems and carry out actions to raise the awareness of the public in the form of training for energy efficient energy management, aimed at a wide audience of the municipality. In addition, the need to implement this project results from the POP registration for Małopolskie and PGN of Gfish Municipality. (English) / rank | |||
Normal rank |
Revision as of 11:47, 9 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reducing low emissions from the housing sector in the municipality of Gfish by means of co-financing the replacement of low legal heat sources with solid fuel for modern heating equipment |
Project in Poland financed by DG Regio |
Statements
1,383,767.24 zloty
0 references
1,404,917.0 zloty
0 references
98.5 percent
0 references
1 February 2017
0 references
31 July 2020
0 references
GMINA GRYBÓW
0 references
Przedmiotowy projekt zakłada wymianę 150 nieefektywnych źródeł ciepła opartych o paliwa stałe, na nowoczesne urządzenia grzewcze wraz z armaturą i osprzętem oraz przystosowaniem instalacji wew. c.o i c.w.u w budynkach mieszkalnych na terenie Gminy Grybów. Zakres prac modernizacyjnych wynikał będzie z oceny energetycznej każdego budynku. W ramach projektu nie planuje się podłączania budynków mieszkalnych do lokalnej sieci ciepłowniczej, stąd projekt dotyczy wyłącznie wymiany starych źródeł ciepła na nowe instalacje kotły paliwa stałe 145 szt. i pompy ciepła 5 szt.Zakres rzeczowy przedmiotowego projektu: ZADANIE 1 Dokumentacja projektowa Działanie 1.1. Opracowanie analizy finansowej i ekonomicznej projektu Działanie 1.2. Opracowanie analizy finansowej i ekonomicznej projektu ZADANIE 2 Wymiana nieekologicznych źródeł ciepła Działanie 2.1. Wymiana kotłów Działanie 2.2. Prace przystosowawcze instalacji wewnętrznych ZADANIE 3 Działania podnoszące świadomość ekologiczną społeczeństwa Działanie 3.1. Organizacja szkoleńwarsztatówspotkań ZADANIE 4 Koszty pośrednie Działanie 4.1. Koszty informacji i promocji, zarządzania projektem oraz kontroli modernizacji i eksploatacji systemów grzewczychWskaźniki rezultatu projektu:Szacowany roczny spadek emisji gazów cieplarnianych: 424,921 Mg CO2rok 34,42Poziom emisji pyłu PM10: bazowy 4,511 Mgrok, docelowy 0,170 Mgrok redukcja 96,22 Poziom emisji pyłu PM2,5: bazowy 1,899 Mgrok, docelowy 0,162 Mgrok redukcja 91,47W ramach projektu planuje się dodatkowo system kontroli modernizacji i eksploatacji systemów grzewczych oraz realizację działań na rzecz podnoszenia świadomości ekologicznej społeczeństwa w formie szkoleńwarsztatówspotkań z zakresu racjonalnej gospodarki energetycznej, skierowanych do szerokiego grona odbiorców z terenu gminy. Konieczność realizacji przedmiotowego projektu wynika ponadto z zapisów POP dla wojew. małopolskiego oraz PGN Gminy Grybów (Polish)
0 references
The project involves the replacement of 150 inefficient heat sources based on solid fuels, into modern heating appliances with fittings and fittings, and for the fitting and adaptation of hot and hot water heaters in residential buildings in the municipality of Gfish. The scope of the modernisation works will be based on the energy assessment of each building. The project does not plan to connect residential buildings to the local district heating network, hence the project relates only to the replacement of old heat sources for new installations of solid fuel boilers 145 and heat pumps 5. material scope of the project: Activity 1: project documentation Action 1.1. Preparation of the financial and economic analysis of the Action 1.2 project. Preparation of financial and economic analysis of project 2. replacement of non-organic heat sources Action 2.1. Replacement of boilers, Measure 2.2. The work of the installation of the internal installation ADAPT3 is carried out by action to raise the awareness of green society, Action 3.1. Workshop training organisation 4 Indirect costs, Action 4.1. Costs of information and publicity, project management and checks on the modernisation and operation of heating systems: estimated annual decrease in greenhouse gas emissions: 424,921 Mg CO2Year 34,42 emission levels for PM10: base 4,511 Mgr, Target 0,170 Mgr 96,22, PM2,5 emission level: the baseline 1,899 Mgr 91,47, the target 0,162 Mgr of the project will additionally consist of a system to control the modernisation and operation of heating systems and carry out actions to raise the awareness of the public in the form of training for energy efficient energy management, aimed at a wide audience of the municipality. In addition, the need to implement this project results from the POP registration for Małopolskie and PGN of Gfish Municipality. (English)
0 references
Identifiers
RPMP.04.04.03-12-0131/17
0 references