(‎Created claim: summary (P836): The project is covered by a building group building in Łomnia-Zdrój. According to the energy audit of the building, it was decided to include the following works in the project: 1. Wall insulation, joinery replacement: — The replacement of a mechanical coupling installation with a new installation with thermostatic radiator (s) fitted with thermostatic radiator valves (with heads) and infrared valves; The insulation of the external wall of the l...)
Property / summary
 
The project is covered by a building group building in Łomnia-Zdrój. According to the energy audit of the building, it was decided to include the following works in the project: 1. Wall insulation, joinery replacement: — The replacement of a mechanical coupling installation with a new installation with thermostatic radiator (s) fitted with thermostatic radiator valves (with heads) and infrared valves; The insulation of the external wall of the light technology, where the insulation layer is 20 cm thick; — warming subjected to a 18 cm thick layer of insulation, placed on the costume. — warming subjected to a 20 cm thick layer of insulation; An insulation layer of 25 cm thick insulation; — Exchange of window frames (not yet mentioned) for joinery (PVC, ALs or wood) of total Umax = 1,10 W/(m2K); — The replacement of exterior doors of wood (not named) on the door (PVC, aluminium or wood) with a total coefficient Umax = 1,30 W/(m2K). — The replacement of external (previously not listed) steel doors to the door (PVC, aluminium or wood) with a total coefficient Umax = 1,30 W/(m2K), — Modernisation of the gap by replacing their joinery (PVC, ALs or wood) with a total coefficient Umax = 1,10 W/(m2K). The project is characterised by the following indicators: 1. % value of energy efficiency improvement: 49.5 %; 2. Heat meters were used in the project; 3. The energy audit of a building indicates the need for equipment to be fitted with a given temperature through active operation (thermostats) and/or pressure differential controls (subvertical). The equipment was used in the project. 4. % CO2 emissions reduction: 48.5 %; 5. % reduction of particulate matter (PM 10 and PM 2,5): 49.5 %. (English)
Property / summary: The project is covered by a building group building in Łomnia-Zdrój. According to the energy audit of the building, it was decided to include the following works in the project: 1. Wall insulation, joinery replacement: — The replacement of a mechanical coupling installation with a new installation with thermostatic radiator (s) fitted with thermostatic radiator valves (with heads) and infrared valves; The insulation of the external wall of the light technology, where the insulation layer is 20 cm thick; — warming subjected to a 18 cm thick layer of insulation, placed on the costume. — warming subjected to a 20 cm thick layer of insulation; An insulation layer of 25 cm thick insulation; — Exchange of window frames (not yet mentioned) for joinery (PVC, ALs or wood) of total Umax = 1,10 W/(m2K); — The replacement of exterior doors of wood (not named) on the door (PVC, aluminium or wood) with a total coefficient Umax = 1,30 W/(m2K). — The replacement of external (previously not listed) steel doors to the door (PVC, aluminium or wood) with a total coefficient Umax = 1,30 W/(m2K), — Modernisation of the gap by replacing their joinery (PVC, ALs or wood) with a total coefficient Umax = 1,10 W/(m2K). The project is characterised by the following indicators: 1. % value of energy efficiency improvement: 49.5 %; 2. Heat meters were used in the project; 3. The energy audit of a building indicates the need for equipment to be fitted with a given temperature through active operation (thermostats) and/or pressure differential controls (subvertical). The equipment was used in the project. 4. % CO2 emissions reduction: 48.5 %; 5. % reduction of particulate matter (PM 10 and PM 2,5): 49.5 %. (English) / rank
 
Normal rank

Revision as of 11:42, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy renovation of a School/Girl School Team in a Łomnicz Zdrój municipality in Piwnna — Zdrój
Project in Poland financed by DG Regio

    Statements

    0 references
    746,266.83 zloty
    0 references
    179,104.03919999997 Euro
    13 January 2020
    0 references
    1,243,778.06 zloty
    0 references
    298,506.7344 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    2 May 2016
    0 references
    29 December 2017
    0 references
    MIASTO I GMINA PIWNICZNA-ZDRÓJ
    0 references
    Projektem objęty jest budynek Zespołu Szkół w Łomnicy-Zdroju. Zgodnie z przeprowadzonym audytem energetycznym dla budynku zdecydowano się na ujęcie w zakresie projektu następujących prac: 1. Docieplenie ścian, wymiana stolarki: - Wymiana instalacji c.o.na nową instalację z grzejnikami wyposażonymi w zawory termostatyczne (wraz z głowicami) oraz zawory podpionowe; - Ocieplenie ścian zewnętrznych technologii lekkiej-mokrej, gdzie grubość warstwy izolacji wyniesie 20 cm.; - Ocieplenie poddasza warstwą izolacji o grubości 18 cm, układaną na stropie poddasza. - Ocieplenie poddasza nad łącznikiem warstwą izolacji o grubości 20 cm; - Ocieplenie stropodachu warstwą izolacji o grubości 25 cm; - Wymiana stolarki okiennej (dotychczas nie wymienionej) na stolarkę (z PCV, profili AL. lub drewna) o całkowitym współczynniku Umax=1,10 W/(m2K); - Wymiana drzwi zewnętrznych drewnianych (wcześniej nie wymienionych) na drzwi (z PCV, aluminium lub drewna) o całkowitym współczynniku Umax=1,30 W/(m2K). - Wymiana drzwi zewnętrznych stalowych (wcześniej nie wymienionych) na drzwi (z PCV, aluminium lub drewna) o całkowitym współczynniku Umax=1,30 W/(m2K), - Modernizacja luksfer poprzez zastąpienie ich stolarką (z PCV, profili AL. lub drewna) o całkowitym współczynniku Umax=1,10 W/(m2K). Projekt cechują następujące wskaźniki: 1. % wartość poprawy efektywności energetycznej: 49,5 %; 2. W projekcie zostały zastosowane liczniki ciepła; 3. Audyt energetyczny budynku wskazuje na konieczność wprowadzenia urządzeń utrzymujących zadaną temp. poprzez aktywne działanie (termostaty) i/lub regulatory różnicy ciśnień (zawory podpionowe). W projekcie zostały zastosowane ww. urządzenia. 4. % wartość redukcji emisji CO2: 48,5%; 5. % wartość obniżenia emisji pyłów (PM 10 i PM 2,5): 49,5%. (Polish)
    0 references
    The project is covered by a building group building in Łomnia-Zdrój. According to the energy audit of the building, it was decided to include the following works in the project: 1. Wall insulation, joinery replacement: — The replacement of a mechanical coupling installation with a new installation with thermostatic radiator (s) fitted with thermostatic radiator valves (with heads) and infrared valves; The insulation of the external wall of the light technology, where the insulation layer is 20 cm thick; — warming subjected to a 18 cm thick layer of insulation, placed on the costume. — warming subjected to a 20 cm thick layer of insulation; An insulation layer of 25 cm thick insulation; — Exchange of window frames (not yet mentioned) for joinery (PVC, ALs or wood) of total Umax = 1,10 W/(m2K); — The replacement of exterior doors of wood (not named) on the door (PVC, aluminium or wood) with a total coefficient Umax = 1,30 W/(m2K). — The replacement of external (previously not listed) steel doors to the door (PVC, aluminium or wood) with a total coefficient Umax = 1,30 W/(m2K), — Modernisation of the gap by replacing their joinery (PVC, ALs or wood) with a total coefficient Umax = 1,10 W/(m2K). The project is characterised by the following indicators: 1. % value of energy efficiency improvement: 49.5 %; 2. Heat meters were used in the project; 3. The energy audit of a building indicates the need for equipment to be fitted with a given temperature through active operation (thermostats) and/or pressure differential controls (subvertical). The equipment was used in the project. 4. % CO2 emissions reduction: 48.5 %; 5. % reduction of particulate matter (PM 10 and PM 2,5): 49.5 %. (English)
    0 references

    Identifiers

    RPMP.04.03.02-12-0258/16