(‎Created claim: summary (P836): The project is based on the construction of a road and network infrastructure for the operation of the Gospodarczesskówka Komunaloun.1.Total area of the EAZ Piaskówka 5.95 ha, including the investment parcels 4,77 h2.Total area of SAG Kommune 12.91 ha, including the investment parcels 12,13 ha2.SAG. In both cases, a road system will be operated in the EAZ, including its integration into urban roads. Roads shall be fitted with pavements, drainage...)
Property / summary
 
The project is based on the construction of a road and network infrastructure for the operation of the Gospodarczesskówka Komunaloun.1.Total area of the EAZ Piaskówka 5.95 ha, including the investment parcels 4,77 h2.Total area of SAG Kommune 12.91 ha, including the investment parcels 12,13 ha2.SAG. In both cases, a road system will be operated in the EAZ, including its integration into urban roads. Roads shall be fitted with pavements, drainage, in both cases for retention basins, for investment parcels and lighting. Roads will be a public municipal road. The saga will be equipped with nets: water and sewage pipes and technology for the location of power supply cables, gas and teletechnique. As part of ineligible costs, both land will be grubbed up with an average and a high level and a levelling of the site will be carried out. The two zones will thus be completely equipped with SAG. The subject of the investment is the performance of the infrastructure to be used for the operation of the EAZ. This includes for the EAZ Piaskówka budowę:ulicy within the 656 Zesshichs790 wschszech20 wschszech650 bikszechs720 bstszews650 bstszeńjunction (2 mx20 water mains network). 600 m.600 m is a network of street lighting with a x m network of street lighting, with a window of a technology canal with a long length of approx. mj drainage system. 600 m and 2 retention basins for the upgrade of existing network infrastructure for SAG Kommune budowę:drogi 0,31 Longitudinal van 0,28 km8 from publ. from the throttle valve manoeuvre 20mx20mcable road lighting network LEDmains downstream. 250 sewer network with a length of approximately 250 technological channel in the vicinity of the technology channel. 350 storm-water storm-water drainage system in the vicinity. 330 m with the retard reservoir of upgrading of the existing network infrastructure c.g. description in point Q (English)
Property / summary: The project is based on the construction of a road and network infrastructure for the operation of the Gospodarczesskówka Komunaloun.1.Total area of the EAZ Piaskówka 5.95 ha, including the investment parcels 4,77 h2.Total area of SAG Kommune 12.91 ha, including the investment parcels 12,13 ha2.SAG. In both cases, a road system will be operated in the EAZ, including its integration into urban roads. Roads shall be fitted with pavements, drainage, in both cases for retention basins, for investment parcels and lighting. Roads will be a public municipal road. The saga will be equipped with nets: water and sewage pipes and technology for the location of power supply cables, gas and teletechnique. As part of ineligible costs, both land will be grubbed up with an average and a high level and a levelling of the site will be carried out. The two zones will thus be completely equipped with SAG. The subject of the investment is the performance of the infrastructure to be used for the operation of the EAZ. This includes for the EAZ Piaskówka budowę:ulicy within the 656 Zesshichs790 wschszech20 wschszech650 bikszechs720 bstszews650 bstszeńjunction (2 mx20 water mains network). 600 m.600 m is a network of street lighting with a x m network of street lighting, with a window of a technology canal with a long length of approx. mj drainage system. 600 m and 2 retention basins for the upgrade of existing network infrastructure for SAG Kommune budowę:drogi 0,31 Longitudinal van 0,28 km8 from publ. from the throttle valve manoeuvre 20mx20mcable road lighting network LEDmains downstream. 250 sewer network with a length of approximately 250 technological channel in the vicinity of the technology channel. 350 storm-water storm-water drainage system in the vicinity. 330 m with the retard reservoir of upgrading of the existing network infrastructure c.g. description in point Q (English) / rank
 
Normal rank

Revision as of 11:34, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Establishment of the economic activity zone ‘Piasskaika-Komunalna’ in Tarnów
Project in Poland financed by DG Regio

    Statements

    0 references
    7,404,516.75 zloty
    0 references
    1,777,084.02 Euro
    13 January 2020
    0 references
    14,788,764.42 zloty
    0 references
    3,549,303.4608 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 January 2018
    0 references
    31 May 2020
    0 references
    GMINA MIASTA TARNOWA
    0 references
    Przedmiotem projektu jest budowa infrastruktury drogowej oraz sieciowej na potrzeby funkcjonowania Strefy Aktywności GospodarczejPiaskówka Komunalna.1.Powierzchnia całkowita SAG Piaskówka 5,95 ha, w tym działki inwestycyjne 4,77 ha2.Powierzchnia całkowita SAG Komunalna 12,91 ha, w tym działki inwestycyjne 12,13 ha2.Wyposażenie SAG. W obu przypadkach realizowany będzie układ drogowy w SAG z jego włączeniem do dróg miejskich. Drogi będą wyposażone w chodniki, odwodnienie, w obu przypadkach do zbiorników retencyjnych, zjazdy do działek inwestycyjnych i oświetlenie. Drogi będą publicznymi drogami gminnymi. SAGi będą wyposażone w sieci: wodociągową i kanalizacyjną oraz kanały technologiczne dla lokalizacji przewodów zasilających w energię elektryczną, gaz i teletechnikę. W ramach kosztów niekwalifikowanych oba tereny zostaną wykarczowane zieleń średnia i wysoka oraz przeprowadzona zostanie niwelacja terenu . Tym samym obie strefy będą kompletnie wyposażonymi SAG. Przedmiotem inwestycji jest wykonanie infrastruktury która będzie wykorzystywana do obsługi SAG. Obejmuje ona dla SAG Piaskówka budowę:ulicy wewnątrz strefy656 mbciągów pieszych790 mbdróg rowerowych720 mbskrzyżowania trójwlotowego2 placów manewrowych 20mx20msieci wodociągowej o dł. ok.600 msieci kanalizacyjnej o dł ok.600 m sieci oświetlenia ulicznego o dł ok.650 mkanału technologicznego o dł. ok.650 msieci kanalizacji deszczowej o dł. ok. 600 m i 2 zbiorników retencyjnychprzebudowę istniejącej infrastruktury sieciowejdla SAG Komunalna budowę:drogi o dł. 0,31 kmciągu pieszorowerowego o dł. 0,28 km8 zjazdów publ. z przepustamiplacu manewrowego 20mx20mkablowej sieci oświetlenia drogowego LEDsieci wodociągowej o dł.ok. 250 msieci kanalizacyjnej o dł. ok. 250 mkanału technologicznego o dł. ok. 350 msieci kanalizacji deszczowej o dł. ok. 330 m ze zbiornikiem retencyjnymprzebudowę istniejącej infrastruktury sieciowejc.d.opisu w pkt. Q (Polish)
    0 references
    The project is based on the construction of a road and network infrastructure for the operation of the Gospodarczesskówka Komunaloun.1.Total area of the EAZ Piaskówka 5.95 ha, including the investment parcels 4,77 h2.Total area of SAG Kommune 12.91 ha, including the investment parcels 12,13 ha2.SAG. In both cases, a road system will be operated in the EAZ, including its integration into urban roads. Roads shall be fitted with pavements, drainage, in both cases for retention basins, for investment parcels and lighting. Roads will be a public municipal road. The saga will be equipped with nets: water and sewage pipes and technology for the location of power supply cables, gas and teletechnique. As part of ineligible costs, both land will be grubbed up with an average and a high level and a levelling of the site will be carried out. The two zones will thus be completely equipped with SAG. The subject of the investment is the performance of the infrastructure to be used for the operation of the EAZ. This includes for the EAZ Piaskówka budowę:ulicy within the 656 Zesshichs790 wschszech20 wschszech650 bikszechs720 bstszews650 bstszeńjunction (2 mx20 water mains network). 600 m.600 m is a network of street lighting with a x m network of street lighting, with a window of a technology canal with a long length of approx. mj drainage system. 600 m and 2 retention basins for the upgrade of existing network infrastructure for SAG Kommune budowę:drogi 0,31 Longitudinal van 0,28 km8 from publ. from the throttle valve manoeuvre 20mx20mcable road lighting network LEDmains downstream. 250 sewer network with a length of approximately 250 technological channel in the vicinity of the technology channel. 350 storm-water storm-water drainage system in the vicinity. 330 m with the retard reservoir of upgrading of the existing network infrastructure c.g. description in point Q (English)
    0 references

    Identifiers

    RPMP.03.01.02-12-0585/16
    0 references