Comprehensive adaptation of degraded GOK building to restore fundamental and new societal functions along with the management of public spaces (Q107537): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The aim was to ensure that this is not the case. Mr P. is improving the quality of life of the inhabitants of the OR and of the Gram as a whole. The problems arising from the diagnosis are being removed for the purposes of the LPR. Target group: residents of G. Goraj, associations, artistic groups, departmental teams for the sake of social unrest Results: Number of persons used. P.-4377os./rok; Products: The number of infrastructure facilities t...)
Property / summary
 
The aim was to ensure that this is not the case. Mr P. is improving the quality of life of the inhabitants of the OR and of the Gram as a whole. The problems arising from the diagnosis are being removed for the purposes of the LPR. Target group: residents of G. Goraj, associations, artistic groups, departmental teams for the sake of social unrest Results: Number of persons used. P.-4377os./rok; Products: The number of infrastructure facilities to be located. Number of facilities adapted to the needs of persons with a disability of 1 to 0.08 ha; Effects: improvements to the labour market; increase in the increase in the labour market; congestion problems; increasing access to social services (section of the Social Security Office: * refurbishment and fitting-out of rooms, * renovation and fitting-out of premises, * renovation and fitting-out of premises, * renovation and fitting-out of premises, * renovation and refurbishment work for walls, * installation of outdoor lift, * installation of outdoor support, 2) internal electrical installations: * dismantling works, * lighting, * outdoor display, * speech, * monitoring IP, * isent.oddgrospeaks, * electronic lighting. 4) internal sanitary installations: * tap water, * fire-fighting, * sewage, * c.o.s., * ventilation of the meeting room. * air-conditioning in the viewing room. * Single-lead and gravity ventilation, * biomass boiler; (5) land management: As a result, the building will be modernised and the building will be equipped to restore the original and new functions. (English)
Property / summary: The aim was to ensure that this is not the case. Mr P. is improving the quality of life of the inhabitants of the OR and of the Gram as a whole. The problems arising from the diagnosis are being removed for the purposes of the LPR. Target group: residents of G. Goraj, associations, artistic groups, departmental teams for the sake of social unrest Results: Number of persons used. P.-4377os./rok; Products: The number of infrastructure facilities to be located. Number of facilities adapted to the needs of persons with a disability of 1 to 0.08 ha; Effects: improvements to the labour market; increase in the increase in the labour market; congestion problems; increasing access to social services (section of the Social Security Office: * refurbishment and fitting-out of rooms, * renovation and fitting-out of premises, * renovation and fitting-out of premises, * renovation and fitting-out of premises, * renovation and refurbishment work for walls, * installation of outdoor lift, * installation of outdoor support, 2) internal electrical installations: * dismantling works, * lighting, * outdoor display, * speech, * monitoring IP, * isent.oddgrospeaks, * electronic lighting. 4) internal sanitary installations: * tap water, * fire-fighting, * sewage, * c.o.s., * ventilation of the meeting room. * air-conditioning in the viewing room. * Single-lead and gravity ventilation, * biomass boiler; (5) land management: As a result, the building will be modernised and the building will be equipped to restore the original and new functions. (English) / rank
 
Normal rank

Revision as of 09:45, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive adaptation of degraded GOK building to restore fundamental and new societal functions along with the management of public spaces
Project in Poland financed by DG Regio

    Statements

    0 references
    1,398,783.59 zloty
    0 references
    335,708.0616 Euro
    13 January 2020
    0 references
    2,035,477.44 zloty
    0 references
    488,514.5856 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    26 April 2016
    0 references
    31 July 2020
    0 references
    GMINA GORAJ
    0 references
    Celem gł. P. jest podniesienie jakości życia mieszkańców OR oraz całej Gm. Goraj. P. jest odpow. na problemy wynikające z diagnozy przygot. na potrzeby LPR. Grupa docel: mieszkańcy G. Goraj, stowarzyszenia, grupy artystyczne, zespoły dział.na rzecz rozw. lok. społ. Rezultaty: Liczba osób korzyst. z obiektów infrastr. społ./kultur./ turyst. będącej przed. P.-4377os./rok; Produkty: Liczba obiektów infrastr. zlokaliz.na OR-1szt.; Liczba obiektów dost. do potrzeb osób z niepełnosprawnościami-1szt., Powierzchnia obsz. objętych rewitaliz.-0,08 ha; Efekty:zwiększ. dostępn. do rynku pracy;wzrost aktywn. gospod.; ogranicz.problemów społ; zwiększenie dostępu do usług społ. (punkt poradn. społ. i wypożyczalnia sprzętu rehablit.)i kultur.;zwiększenie bezpiecz.Zadania w projekcie:1) prace modern. budynku wewn.:*remont sali widowiskowej,*przeb.stropu i schodów,*remont i adaptacja pomieszczeń,*roboty termomodernizacyjne(docieplenie ścian, montaż zaworów termostatycznych,kocioł na biomasę),*montaż platformy przychodowej na klatce schodowej, *montaż podnośnika przy wejściu głównym,*zadaszenie schodów zewnętrznych, 2)instalacje elektryczne wewn.:*prace demontażowe,*inst. oświetleniowa,*inst.ganiazdowa,*sieć komputerowa,*oświetlenie sceny,*nagłośnienie sceniczne, *nagłośnienie mowy, *inst. alarmowa,*syst.oddymiania,3) instlacje elekt.zewnętrz.:*monitoring CCTV IP, *isnt.odgromowa,*oświetlenie zewn. 4) instalacje sanitarne wewn.: *wodociągowa,*przeciwpożarowa, *kanalizacyjna,*c.o.poddasza,*wentylacja mech. sali widowisk.,*klimatyzacja sali widow.*wentylacja jednoprzewodowa i grawitacyjna,*kotłownia na biomasę; 5)zagospodarowanie terenu:*rob.rozbiórkowe,*wiata rekrea.,*gabiony,*krąg rekreacyjno-wypoczy.,*nawierzchnie, *mała architektura-*stoły do gry-2szt.,*ławki parkowe-2szt.,*donice ogrodowe-3szt.;6)zakup wyposażenia budynku. W efekcie realizacji proj. zmodernizowany i wyposażony zostanie budynek,co pozwoli na przywrócenie mu pierwotnych oraz nadanie nowych funkcji społ.-kultur. (Polish)
    0 references
    The aim was to ensure that this is not the case. Mr P. is improving the quality of life of the inhabitants of the OR and of the Gram as a whole. The problems arising from the diagnosis are being removed for the purposes of the LPR. Target group: residents of G. Goraj, associations, artistic groups, departmental teams for the sake of social unrest Results: Number of persons used. P.-4377os./rok; Products: The number of infrastructure facilities to be located. Number of facilities adapted to the needs of persons with a disability of 1 to 0.08 ha; Effects: improvements to the labour market; increase in the increase in the labour market; congestion problems; increasing access to social services (section of the Social Security Office: * refurbishment and fitting-out of rooms, * renovation and fitting-out of premises, * renovation and fitting-out of premises, * renovation and fitting-out of premises, * renovation and refurbishment work for walls, * installation of outdoor lift, * installation of outdoor support, 2) internal electrical installations: * dismantling works, * lighting, * outdoor display, * speech, * monitoring IP, * isent.oddgrospeaks, * electronic lighting. 4) internal sanitary installations: * tap water, * fire-fighting, * sewage, * c.o.s., * ventilation of the meeting room. * air-conditioning in the viewing room. * Single-lead and gravity ventilation, * biomass boiler; (5) land management: As a result, the building will be modernised and the building will be equipped to restore the original and new functions. (English)
    0 references

    Identifiers

    RPLU.13.04.00-06-0034/17
    0 references