Reconstruction of water supply station in the municipality of Cyców on plot No 133 (Q105681): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The main objective of the project is to improve the quality of the water supplied for social purposes by upgrading the existing water supply infrastructure in the municipality of Cyclists. The specific objective of the project is to improve the quality of life of the inhabitants of Cyclists by reducing the risks arising from exposure to contaminated water. Scope of the project in accordance with the indicators to be achieved and the material and...) |
||
Property / summary | |||
The main objective of the project is to improve the quality of the water supplied for social purposes by upgrading the existing water supply infrastructure in the municipality of Cyclists. The specific objective of the project is to improve the quality of life of the inhabitants of Cyclists by reducing the risks arising from exposure to contaminated water. Scope of the project in accordance with the indicators to be achieved and the material and financial schedule: 1) water intake — wells — modernisation of existing wells and replacement of submersible pumps for more energy efficient; 2) SUW building with equipment — modernisation works are planned, including insulation of the building, replacement of the roof, floor etc., as well as modernisation or replacement of equipment for the efficient treatment of water; (3) water supply — the water supply tank is planned — 150 m³ of water supply pipelines — internal and external pipeline piping will be constructed — internal and external pipeline technology will be constructed from both tanks — wells No 1 and wells No 2 to the existing sewage network located within the boundaries of the plot 4), the fence is planned to be destroyed and the construction of 5) is planned to be added to the existing sewage network situated within the boundaries of this plot 6) — road surface paving in the SUW 9) external roads (non-eligible), as part of access road to SUW 10), the land surveying and water analyses 11) technical documentation 12) project promotion 14) Feasibility study of the project 7) Feasibility study of the project in accordance with result indicators: Anticipated number of people benefiting from an improved water supply: 3168. In the framework of the project for the modernisation of the water treatment plant in Cycowo, there will be an improvement in the quality of the water supplied to the 3168 people served by the SUW. (English) | |||
Property / summary: The main objective of the project is to improve the quality of the water supplied for social purposes by upgrading the existing water supply infrastructure in the municipality of Cyclists. The specific objective of the project is to improve the quality of life of the inhabitants of Cyclists by reducing the risks arising from exposure to contaminated water. Scope of the project in accordance with the indicators to be achieved and the material and financial schedule: 1) water intake — wells — modernisation of existing wells and replacement of submersible pumps for more energy efficient; 2) SUW building with equipment — modernisation works are planned, including insulation of the building, replacement of the roof, floor etc., as well as modernisation or replacement of equipment for the efficient treatment of water; (3) water supply — the water supply tank is planned — 150 m³ of water supply pipelines — internal and external pipeline piping will be constructed — internal and external pipeline technology will be constructed from both tanks — wells No 1 and wells No 2 to the existing sewage network located within the boundaries of the plot 4), the fence is planned to be destroyed and the construction of 5) is planned to be added to the existing sewage network situated within the boundaries of this plot 6) — road surface paving in the SUW 9) external roads (non-eligible), as part of access road to SUW 10), the land surveying and water analyses 11) technical documentation 12) project promotion 14) Feasibility study of the project 7) Feasibility study of the project in accordance with result indicators: Anticipated number of people benefiting from an improved water supply: 3168. In the framework of the project for the modernisation of the water treatment plant in Cycowo, there will be an improvement in the quality of the water supplied to the 3168 people served by the SUW. (English) / rank | |||
Normal rank |
Revision as of 09:34, 9 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of water supply station in the municipality of Cyców on plot No 133 |
Project in Poland financed by DG Regio |
Statements
750,453.41 zloty
0 references
1,164,504.38 zloty
0 references
85.0 percent
0 references
4 September 2015
0 references
31 December 2016
0 references
GMINA CYCÓW
0 references
Głównym celem projektu jest poprawa jakości dostarczanych wód na cele socjalno - bytowe poprzez modernizację istniejącej infrastruktury dostarczania wody w Gminie Cyców. Cel szczegółowy projektu to poprawa jakości życia mieszkańców Gminy Cyców poprzez zmniejszenie ryzyka wynikającego z kontaktu z wodą zanieczyszczoną. Zakres projektu zgodnie ze wskaźnikami planowanymi do osiągnięcia oraz harmonogramem rzeczowo-finansowym: 1) ujęcie wody - studnie - zakłada się modernizację istniejących studni oraz wymianę pomp głębinowych na bardziej energooszczędne; 2) budynek SUW z wyposażeniem - planowane są prace modernizacyjne, m.in. wykonanie izolacji termicznej budynku, wymiana dachu, posadzek itp., jak również modernizację bądź wymianę urządzeń umożliwiających skuteczne uzdatnianie wody; 3) zbiornik wodociągowy - zaplanowano zbiornik wodociągowy żelbetowy 150 m3 4) rurociągi międzyobiektowe - wykonane zostaną rurociągi technologiczne wewnętrzne i zewnętrzne ze stali nierdzewnej 5) kanalizacja zewnętrzna - dotyczy wpięcia wód opadowych z obu zbiorników - studni nr 1 i studni nr 2 do istniejącej sieci kanalizacyjnej znajdującej się w granicach przedmiotowej działki 6) ogrodzenie - planuje się rozbiórkę istniejącego ogrodzenia ujęcia wody i wykonanie nowego 7) obsianie trawników - planowane jest uzupełnienie zieleni istniejącej 8) drogi i chodniki wewnętrzne - utwardzenie dróg na terenie SUW 9) drogi zewnętrzne (niekwalifikowane) - fragment drogi dojazdowej do SUW 10) obsługa geodezyjna i wykonanie analiz wody 11) dokumentacja techniczna 12) nadzór inwestorski 13) promocja projektu 14) studium wykonalności Kluczowe rezultaty projektu zgodnie ze wskaźnikami rezultatu: Przewidywana liczba osób korzystających z ulepszonego zaopatrzenia w wodę: 3168. W ramach projektu modernizacji stacji uzdatniania wody w Cycowie nastąpi poprawa jakości dostarczanej wody dla 3168 osób obsługiwanych przez SUW. (Polish)
0 references
The main objective of the project is to improve the quality of the water supplied for social purposes by upgrading the existing water supply infrastructure in the municipality of Cyclists. The specific objective of the project is to improve the quality of life of the inhabitants of Cyclists by reducing the risks arising from exposure to contaminated water. Scope of the project in accordance with the indicators to be achieved and the material and financial schedule: 1) water intake — wells — modernisation of existing wells and replacement of submersible pumps for more energy efficient; 2) SUW building with equipment — modernisation works are planned, including insulation of the building, replacement of the roof, floor etc., as well as modernisation or replacement of equipment for the efficient treatment of water; (3) water supply — the water supply tank is planned — 150 m³ of water supply pipelines — internal and external pipeline piping will be constructed — internal and external pipeline technology will be constructed from both tanks — wells No 1 and wells No 2 to the existing sewage network located within the boundaries of the plot 4), the fence is planned to be destroyed and the construction of 5) is planned to be added to the existing sewage network situated within the boundaries of this plot 6) — road surface paving in the SUW 9) external roads (non-eligible), as part of access road to SUW 10), the land surveying and water analyses 11) technical documentation 12) project promotion 14) Feasibility study of the project 7) Feasibility study of the project in accordance with result indicators: Anticipated number of people benefiting from an improved water supply: 3168. In the framework of the project for the modernisation of the water treatment plant in Cycowo, there will be an improvement in the quality of the water supplied to the 3168 people served by the SUW. (English)
0 references
Identifiers
RPLU.06.04.00-06-0061/15
0 references