Construction of 4 photovoltaic installations with a combined output of 192,92 kWp for the purposes of energy diversification (Q104997): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The investment planned for the implementation of the investment is stationary and will consist of the development of 4 solar photovoltaic installations producing electricity from solar radiation of a total power of 192.92 kW. The following installations are part of the whole PUK sp. z o.o. project: 1. A 33,6 kWp — SIEDZIBA FIRMY PV installation Construction of a photovoltaic installation with a target capacity of 33,6 kWp on the roof of the buil...) |
||
Property / summary | |||
The investment planned for the implementation of the investment is stationary and will consist of the development of 4 solar photovoltaic installations producing electricity from solar radiation of a total power of 192.92 kW. The following installations are part of the whole PUK sp. z o.o. project: 1. A 33,6 kWp — SIEDZIBA FIRMY PV installation Construction of a photovoltaic installation with a target capacity of 33,6 kWp on the roof of the buildings. A 280Wp photovoltaic PV is used to convert solar energy to electricity. 2. A 39,76 kWp photovoltaic installation — plant Construction of a photovoltaic installation with a target of 39,76 kWp used on the roof of a building at a waste water treatment plant and on the ground on a dedicated wheelhouse. A 280Wp photovoltaic PV is used to convert solar energy to electricity. 3.photovoltaic installation 39,76 kWp — BAZA TRANSPORT Construction of a photovoltaic installation with a 39,76 kWp floor area on the roof of the building. To convert solar energy to electricity the solar modules PV mono-crystalline 280Wp were used. 4. A 79,8 kWp photovoltaic installation on the roof of the building and the lateral façade of the Water Treatment consisting of two micro-installations with a power of 2x39,9 KWP. The planned investment consists of the construction of two photovoltaic installations with a capacity of 39,9 kWp each installation. The building elements will be placed on the roof of the building and on the side façade. A 280Wp photovoltaic PV is used to convert solar energy to electricity. Stages of work: 1 — Technical documentation 2 application documentation 3 unrestricted transfer — implementation of the construction work 4 — Construction of works — construction of an installation of PV 5. Final acceptance of works and final statement. (English) | |||
Property / summary: The investment planned for the implementation of the investment is stationary and will consist of the development of 4 solar photovoltaic installations producing electricity from solar radiation of a total power of 192.92 kW. The following installations are part of the whole PUK sp. z o.o. project: 1. A 33,6 kWp — SIEDZIBA FIRMY PV installation Construction of a photovoltaic installation with a target capacity of 33,6 kWp on the roof of the buildings. A 280Wp photovoltaic PV is used to convert solar energy to electricity. 2. A 39,76 kWp photovoltaic installation — plant Construction of a photovoltaic installation with a target of 39,76 kWp used on the roof of a building at a waste water treatment plant and on the ground on a dedicated wheelhouse. A 280Wp photovoltaic PV is used to convert solar energy to electricity. 3.photovoltaic installation 39,76 kWp — BAZA TRANSPORT Construction of a photovoltaic installation with a 39,76 kWp floor area on the roof of the building. To convert solar energy to electricity the solar modules PV mono-crystalline 280Wp were used. 4. A 79,8 kWp photovoltaic installation on the roof of the building and the lateral façade of the Water Treatment consisting of two micro-installations with a power of 2x39,9 KWP. The planned investment consists of the construction of two photovoltaic installations with a capacity of 39,9 kWp each installation. The building elements will be placed on the roof of the building and on the side façade. A 280Wp photovoltaic PV is used to convert solar energy to electricity. Stages of work: 1 — Technical documentation 2 application documentation 3 unrestricted transfer — implementation of the construction work 4 — Construction of works — construction of an installation of PV 5. Final acceptance of works and final statement. (English) / rank | |||
Normal rank |
Revision as of 09:12, 9 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of 4 photovoltaic installations with a combined output of 192,92 kWp for the purposes of energy diversification |
Project in Poland financed by DG Regio |
Statements
464,791.32 zloty
0 references
1,270,429.61 zloty
0 references
45.0 percent
0 references
6 April 2018
0 references
31 December 2018
0 references
PRZEDSIĘBIORSTWO USŁUG KOMUNALNYCH SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ W RADZYNIU PODLASKIM
0 references
Planowana do realizacji inwestycja wykazuje charakter stacjonarny i polegać będzie na wybudowaniu 4 instalacji fotowoltaicznych wytwarzających energię elektryczną z promieniowania słonecznego o mocy łącznej 192,92 kW. W skład całego projektu PUK sp. z o.o. w Radzyniu Podlaskim wchodzą następujące instalacje: 1. Instalacja fotowoltaiczna o mocy 33,6 kWp - SIEDZIBA FIRMY Budowa instalacji fotowoltaicznej o mocy docelowej 33,6 kWp posadowionej na dachu budynków. Do przemiany energii promieniowania słonecznego na energię elektryczną wykorzystano moduły fotowoltaiczne PV monokrystaliczne o mocy 280Wp. 2. Instalacja fotowoltaiczna o mocy 39,76 kWp - OCZYSZCZALNIA Budowa instalacji fotowoltaicznej o mocy docelowej 39,76 kWp posadowionej na dachu budynku przy oczyszczalni ścieków oraz na ziemi na dedykowanym stelażu. Do przemiany energii promieniowania słonecznego na energię elektryczną wykorzystano moduły fotowoltaiczne PV monokrystaliczne o mocy 280Wp. 3.Instalacja fotowoltaiczna o mocy 39,76 kWp - BAZA TRANSPORTOWA Budowa instalacji fotowoltaicznej o mocy docelowej 39,76 kWp posadowionej na dachu budynku. Do przemiany energii promieniowania słonecznego na energię elektryczną wykorzystano moduły fotowoltaiczne PV monokrystaliczne 280Wp. 4. Instalacja fotowoltaiczna o mocy 79,8 kWp na dachu budynku oraz bocznej elewacji Stacji Uzdatniania Wody składająca się z dwóch mikroinstalacji o mocy 2x39,9 kWP. Planowana inwestycja polega na budowie dwóch instalacji fotowoltaicznej o mocy 39,9 kWp każda instalacja. Elementy instalacji zostaną posadowione na dachu budynku oraz bocznej elewacji. Do przemiany energii promieniowania słonecznego na energię elektryczną wykorzystano moduły fotowoltaiczne PV monokrystaliczne o mocy 280Wp. Etapy prac: 1 Dokumentacja techniczna 2 Dokumentacja aplikacyjna 3 Przetarg nieograniczony - realizacja robót budowlanych 4 Realizacja robót budowlanych - budowa instalacji PV 5. Odbiór końcowy robót i rozliczenie końcowe. (Polish)
0 references
The investment planned for the implementation of the investment is stationary and will consist of the development of 4 solar photovoltaic installations producing electricity from solar radiation of a total power of 192.92 kW. The following installations are part of the whole PUK sp. z o.o. project: 1. A 33,6 kWp — SIEDZIBA FIRMY PV installation Construction of a photovoltaic installation with a target capacity of 33,6 kWp on the roof of the buildings. A 280Wp photovoltaic PV is used to convert solar energy to electricity. 2. A 39,76 kWp photovoltaic installation — plant Construction of a photovoltaic installation with a target of 39,76 kWp used on the roof of a building at a waste water treatment plant and on the ground on a dedicated wheelhouse. A 280Wp photovoltaic PV is used to convert solar energy to electricity. 3.photovoltaic installation 39,76 kWp — BAZA TRANSPORT Construction of a photovoltaic installation with a 39,76 kWp floor area on the roof of the building. To convert solar energy to electricity the solar modules PV mono-crystalline 280Wp were used. 4. A 79,8 kWp photovoltaic installation on the roof of the building and the lateral façade of the Water Treatment consisting of two micro-installations with a power of 2x39,9 KWP. The planned investment consists of the construction of two photovoltaic installations with a capacity of 39,9 kWp each installation. The building elements will be placed on the roof of the building and on the side façade. A 280Wp photovoltaic PV is used to convert solar energy to electricity. Stages of work: 1 — Technical documentation 2 application documentation 3 unrestricted transfer — implementation of the construction work 4 — Construction of works — construction of an installation of PV 5. Final acceptance of works and final statement. (English)
0 references
Identifiers
RPLU.04.02.00-06-0254/17