Photovoltaic installation at PHU “HEMBUD” (Q104917): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The material scope of the Project includes: Purchase and installation of RES installations: A photovoltaic installation with a capacity of 17,92 kWp and a surface of 106.9 m² on a building belonging to the Beneficiary in Puławy, ul. Component 6A component consisting of: Solar modules — 64. — Franger — 1; installation system — roof; Female and male sectors; — wiring — responsible for transmitting the electrical current from the modules to the wav...)
Property / summary
 
The material scope of the Project includes: Purchase and installation of RES installations: A photovoltaic installation with a capacity of 17,92 kWp and a surface of 106.9 m² on a building belonging to the Beneficiary in Puławy, ul. Component 6A component consisting of: Solar modules — 64. — Franger — 1; installation system — roof; Female and male sectors; — wiring — responsible for transmitting the electrical current from the modules to the wave and/or the electric mains, — electrical switchgear — hermetically sealed housing where the security of the photovoltaic installation will be installed — the monitoring system — allows the current production of the photovoltaic installation to be tracked and archived. The results of the project will be: Increased electricity production on the site of the RES project by 18 981 kWh in the first 12 months of the operation of the RES installations and the Reduced CO2 emissions by 6,3070 tonnes in the first 12 months of the operation of RES installations. the electricity generated from RES installations will be used by the Beneficiary. This is evidenced by the amount of energy consumed by the beneficiary in its last year of activity — consumption at around 24.60 MWh/year. The project will be carried out in the first quarter of the year. However, due to the need to secure financial resources in the budget of the Applicant, it is planned to start the selection procedure for the contractor already in the third quarter of 2018. 2017R. During the implementation of the project, the applicant will carry out an information and educational campaign consisting of organising and holding a meeting on the ecological aspects of the project’s scope. The meeting will take place at a primary school or at a lower secondary school, in agreement with the Directorate. (English)
Property / summary: The material scope of the Project includes: Purchase and installation of RES installations: A photovoltaic installation with a capacity of 17,92 kWp and a surface of 106.9 m² on a building belonging to the Beneficiary in Puławy, ul. Component 6A component consisting of: Solar modules — 64. — Franger — 1; installation system — roof; Female and male sectors; — wiring — responsible for transmitting the electrical current from the modules to the wave and/or the electric mains, — electrical switchgear — hermetically sealed housing where the security of the photovoltaic installation will be installed — the monitoring system — allows the current production of the photovoltaic installation to be tracked and archived. The results of the project will be: Increased electricity production on the site of the RES project by 18 981 kWh in the first 12 months of the operation of the RES installations and the Reduced CO2 emissions by 6,3070 tonnes in the first 12 months of the operation of RES installations. the electricity generated from RES installations will be used by the Beneficiary. This is evidenced by the amount of energy consumed by the beneficiary in its last year of activity — consumption at around 24.60 MWh/year. The project will be carried out in the first quarter of the year. However, due to the need to secure financial resources in the budget of the Applicant, it is planned to start the selection procedure for the contractor already in the third quarter of 2018. 2017R. During the implementation of the project, the applicant will carry out an information and educational campaign consisting of organising and holding a meeting on the ecological aspects of the project’s scope. The meeting will take place at a primary school or at a lower secondary school, in agreement with the Directorate. (English) / rank
 
Normal rank

Revision as of 09:12, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Photovoltaic installation at PHU “HEMBUD”
Project in Poland financed by DG Regio

    Statements

    0 references
    54,617.47 zloty
    0 references
    13,108.192799999999 Euro
    13 January 2020
    0 references
    103,353.06 zloty
    0 references
    24,804.734399999998 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    3 July 2017
    0 references
    30 September 2018
    0 references
    PRZEDSIĘBIORSTWO HANDLOWO-USŁUGOWE "HEMBUD" SP. Z O.O.
    0 references
    Zakres rzeczowy Projektu obejmuje: Zakup i montaż instalacji OZE: - Instalacji fotowoltaicznej o mocy na 17,92 kWp i powierzchni 106,9 m2 na budynku obiektu należącego do Beneficjenta w lokalizacji Puławy, ul. Składowa 6A , na którą składają się: - moduły fotowoltaiczne - 64 szt. - falownik - 1 szt.; system montażowy - dachowy; - konektory żeńskie i męskie; - okablowanie - odpowiada za przekazywanie prądu elektrycznego z modułów do falownika i z falownika do sieci elektrycznej, - rozdzielnice elektryczne - obudowy hermetyczne, w których zainstalowane będą zabezpieczenia instalacji fotowoltaicznej, - system monitoringu - pozwala on na śledzenie bieżącej produkcji prądu z instalacji fotowoltaicznej oraz przeglądanie danych archiwalnych. Rezultatami projektu będzie: Zwiększona produkcja energii elektrycznej na terenie realizacji projektu z OZE o 18 981 kWh w pierwszych 12 miesiącach funkcjonowania instalacji OZE oraz Zmniejszona emisja CO2 o 6,3070 ton w pierwszych 12 miesiącach funkcjonowania instalacji OZE..Cała energia elektryczna pozyskana z instalacji OZE będzie wykorzystana przez Beneficjenta. Świadczy o tym ilość energii zużywanej przez Beneficjenta w ostatnim roku jego działalności - zużycie na poziomie ok. 24,60 MWh /rok. Projekt będzie realizowany w I kw. 2018r. jednak ze względu na konieczność zabezpieczenia środków finansowych w budżecie Wnioskodawcy planuje on rozpocząć procedurę wyboru wykonawcy już w III kw. 2017r. W trakcie realizacji projektu Wnioskodawca przeprowadzi kampanię informacyjno-edukacyjną polegającą na zorganizowaniu i przeprowadzeniu spotkania nt. ekologicznych aspektów zakresu realizacji projektu. Spotkanie odbędzie się w szkole podstawowej lub gimnazjum - w uzgodnieniu z Dyrekcją placówki. (Polish)
    0 references
    The material scope of the Project includes: Purchase and installation of RES installations: A photovoltaic installation with a capacity of 17,92 kWp and a surface of 106.9 m² on a building belonging to the Beneficiary in Puławy, ul. Component 6A component consisting of: Solar modules — 64. — Franger — 1; installation system — roof; Female and male sectors; — wiring — responsible for transmitting the electrical current from the modules to the wave and/or the electric mains, — electrical switchgear — hermetically sealed housing where the security of the photovoltaic installation will be installed — the monitoring system — allows the current production of the photovoltaic installation to be tracked and archived. The results of the project will be: Increased electricity production on the site of the RES project by 18 981 kWh in the first 12 months of the operation of the RES installations and the Reduced CO2 emissions by 6,3070 tonnes in the first 12 months of the operation of RES installations. the electricity generated from RES installations will be used by the Beneficiary. This is evidenced by the amount of energy consumed by the beneficiary in its last year of activity — consumption at around 24.60 MWh/year. The project will be carried out in the first quarter of the year. However, due to the need to secure financial resources in the budget of the Applicant, it is planned to start the selection procedure for the contractor already in the third quarter of 2018. 2017R. During the implementation of the project, the applicant will carry out an information and educational campaign consisting of organising and holding a meeting on the ecological aspects of the project’s scope. The meeting will take place at a primary school or at a lower secondary school, in agreement with the Directorate. (English)
    0 references

    Identifiers

    RPLU.04.02.00-06-0124/17
    0 references