(Created claim: summary (P836): The operation of the feeder has been unbalanced since 2013, causing water towers and water cuts on the network.At the end of September 2015 of the Moule plant, it was possible to find a provisionally balanced situation on the feeder and put an end to the water towers. Numerous breaks were recorded on the network, as well as abnormal corrosion on the outside of the pipes. The project consists of renewing the section of the feeder of Belle Eau gi...) |
||||||||||||||
Property / summary | |||||||||||||||
The operation of the feeder has been unbalanced since 2013, causing water towers and water cuts on the network.At the end of September 2015 of the Moule plant, it was possible to find a provisionally balanced situation on the feeder and put an end to the water towers. Numerous breaks were recorded on the network, as well as abnormal corrosion on the outside of the pipes. The project consists of renewing the section of the feeder of Belle Eau gift located from the intersection with the road from Bérard to Châteaubrun to the place called Blonval/Belle allée. The pipe shall be cast iron in order to ensure a lifetime in view of the aggressiveness of the soil. (English) | |||||||||||||||
Property / summary: The operation of the feeder has been unbalanced since 2013, causing water towers and water cuts on the network.At the end of September 2015 of the Moule plant, it was possible to find a provisionally balanced situation on the feeder and put an end to the water towers. Numerous breaks were recorded on the network, as well as abnormal corrosion on the outside of the pipes. The project consists of renewing the section of the feeder of Belle Eau gift located from the intersection with the road from Bérard to Châteaubrun to the place called Blonval/Belle allée. The pipe shall be cast iron in order to ensure a lifetime in view of the aggressiveness of the soil. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operation of the feeder has been unbalanced since 2013, causing water towers and water cuts on the network.At the end of September 2015 of the Moule plant, it was possible to find a provisionally balanced situation on the feeder and put an end to the water towers. Numerous breaks were recorded on the network, as well as abnormal corrosion on the outside of the pipes. The project consists of renewing the section of the feeder of Belle Eau gift located from the intersection with the road from Bérard to Châteaubrun to the place called Blonval/Belle allée. The pipe shall be cast iron in order to ensure a lifetime in view of the aggressiveness of the soil. (English) / qualifier | |||||||||||||||
point in time: 18 November 2021
|
Revision as of 18:04, 18 November 2021
Project Q3685252 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3685252 in France |
Statements
1,320,000.0 Euro
0 references
1,650,000.0 Euro
0 references
80.0 percent
0 references
1 September 2016
0 references
30 September 2019
0 references
Conseil départemental de la Guadeloupe
0 references
Le fonctionnement du feeder est en déséquilibre depuis 2013, provoquant des tours d’eau et des coupures d’eau sur le réseau.En fin septembre 2015 de l’usine du Moule a permis de retrouver provisoirement une situation presque équilibrée sur le feeder et de mettre fin aux tours d’eau. De nombreuses casses ont été recensées sur le réseau, ainsi qu’une corrosion anormale a été constatée sur l’extérieur des canalisations. Le projet consiste à renouveler le tronçon du feeder de Belle Eau cadeau situé depuis l’intersection avec la route de Bérard à Châteaubrun jusqu’au lieu-dit Blonval /Belle allée. La canalisation sera en fonte afin de garantir une durée de vie compte tenu de l’agressivité du sol. (French)
0 references
The operation of the feeder has been unbalanced since 2013, causing water towers and water cuts on the network.At the end of September 2015 of the Moule plant, it was possible to find a provisionally balanced situation on the feeder and put an end to the water towers. Numerous breaks were recorded on the network, as well as abnormal corrosion on the outside of the pipes. The project consists of renewing the section of the feeder of Belle Eau gift located from the intersection with the road from Bérard to Châteaubrun to the place called Blonval/Belle allée. The pipe shall be cast iron in order to ensure a lifetime in view of the aggressiveness of the soil. (English)
18 November 2021
0 references
Identifiers
GP0010861
0 references