Q3682714 (Q3682714): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: importing one item from France) |
(Created claim: summary (P836): The operation concerns the setting up of a wood boiler house in the context of the reconstruction of the EHPAD (Etablissement d’habitation for the elderly dependents) public Saint-Jacques in Verdun-sur-Garonne. The reconstruction project consists of moving the settlement, historically located in the heart of the city, on the outskirts of the commune of Verdun-sur-Garonne. The property will have an area of 6 000 m². The facility accommodates 98 e...) |
||||||||||||||
Property / summary | |||||||||||||||
The operation concerns the setting up of a wood boiler house in the context of the reconstruction of the EHPAD (Etablissement d’habitation for the elderly dependents) public Saint-Jacques in Verdun-sur-Garonne. The reconstruction project consists of moving the settlement, historically located in the heart of the city, on the outskirts of the commune of Verdun-sur-Garonne. The property will have an area of 6 000 m². The facility accommodates 98 elderly people and the reconstruction of EHPAD has been designed to use renewable energy (here wood) and to meet the energy targets set by the 2012 thermal regulation (RT 2012). The boiler room will be equipped with 2 wooden boilers shredded in cascade of 200 kW each. The wood boiler will provide about 97 % of the total heating consumption (a fuel boiler will provide the extra). The operation takes place from 28/02/2015 to 28/02/2018. (English) | |||||||||||||||
Property / summary: The operation concerns the setting up of a wood boiler house in the context of the reconstruction of the EHPAD (Etablissement d’habitation for the elderly dependents) public Saint-Jacques in Verdun-sur-Garonne. The reconstruction project consists of moving the settlement, historically located in the heart of the city, on the outskirts of the commune of Verdun-sur-Garonne. The property will have an area of 6 000 m². The facility accommodates 98 elderly people and the reconstruction of EHPAD has been designed to use renewable energy (here wood) and to meet the energy targets set by the 2012 thermal regulation (RT 2012). The boiler room will be equipped with 2 wooden boilers shredded in cascade of 200 kW each. The wood boiler will provide about 97 % of the total heating consumption (a fuel boiler will provide the extra). The operation takes place from 28/02/2015 to 28/02/2018. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The operation concerns the setting up of a wood boiler house in the context of the reconstruction of the EHPAD (Etablissement d’habitation for the elderly dependents) public Saint-Jacques in Verdun-sur-Garonne. The reconstruction project consists of moving the settlement, historically located in the heart of the city, on the outskirts of the commune of Verdun-sur-Garonne. The property will have an area of 6 000 m². The facility accommodates 98 elderly people and the reconstruction of EHPAD has been designed to use renewable energy (here wood) and to meet the energy targets set by the 2012 thermal regulation (RT 2012). The boiler room will be equipped with 2 wooden boilers shredded in cascade of 200 kW each. The wood boiler will provide about 97 % of the total heating consumption (a fuel boiler will provide the extra). The operation takes place from 28/02/2015 to 28/02/2018. (English) / qualifier | |||||||||||||||
point in time: 18 November 2021
|
Revision as of 18:03, 18 November 2021
Project Q3682714 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3682714 in France |
Statements
111,900.0 Euro
0 references
297,880.0 Euro
0 references
37.57 percent
0 references
28 February 2015
0 references
28 February 2018
0 references
EHPAD Saint-Jaques de Verdun-sur-Garonne
0 references
L'opération concerne la mise en place d'une chaufferie bois dans le cadre de la reconstruction de l'EHPAD (Établissement d'hébergement pour les personnes âgées dépendantes) public Saint-Jacques à Verdun-sur-Garonne. Le projet de reconstruction consiste à déplacer l'établissement, historiquement situé en cœur de ville, en périphérie de la commune de Verdun-sur-Garonne. L'établissement aura une surface de 6 000 m². L'établissement accueille 98 personnes âgées et la reconstruction de l'EHPAD a été pensée dans l'objectif d'utiliser les énergies renouvelable (ici bois) et d'atteindre les objectifs énergétiques fixés par la règlementation thermique de 2012 (RT 2012). La chaufferie sera équipée de 2 chaudières bois déchiqueté en cascade de 200 kW chacune. La chaudière bois assurera environ 97% de la consommation totale de chauffage (une chaudière fioul permettra d'assurer l'appoint). L'opération se déroule du 28/02/2015 au 28/02/2018. (French)
0 references
The operation concerns the setting up of a wood boiler house in the context of the reconstruction of the EHPAD (Etablissement d’habitation for the elderly dependents) public Saint-Jacques in Verdun-sur-Garonne. The reconstruction project consists of moving the settlement, historically located in the heart of the city, on the outskirts of the commune of Verdun-sur-Garonne. The property will have an area of 6 000 m². The facility accommodates 98 elderly people and the reconstruction of EHPAD has been designed to use renewable energy (here wood) and to meet the energy targets set by the 2012 thermal regulation (RT 2012). The boiler room will be equipped with 2 wooden boilers shredded in cascade of 200 kW each. The wood boiler will provide about 97 % of the total heating consumption (a fuel boiler will provide the extra). The operation takes place from 28/02/2015 to 28/02/2018. (English)
18 November 2021
0 references
Identifiers
MP0015585
0 references