Q3682819 (Q3682819): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: importing one item from France)
(‎Created claim: summary (P836): The installation of a wood boiler room in the new college under construction in Isle-Jourdain gives concrete expression to the desire of the Gers Department to develop and structure an energy-based wood industry in its territory. The 120 kW shredded wood boiler aims to cover more than 90 % of the college’s heat requirements., translated_summary)
Property / summary
 
The installation of a wood boiler room in the new college under construction in Isle-Jourdain gives concrete expression to the desire of the Gers Department to develop and structure an energy-based wood industry in its territory. The 120 kW shredded wood boiler aims to cover more than 90 % of the college’s heat requirements. (English)
Property / summary: The installation of a wood boiler room in the new college under construction in Isle-Jourdain gives concrete expression to the desire of the Gers Department to develop and structure an energy-based wood industry in its territory. The 120 kW shredded wood boiler aims to cover more than 90 % of the college’s heat requirements. (English) / rank
 
Normal rank
Property / summary: The installation of a wood boiler room in the new college under construction in Isle-Jourdain gives concrete expression to the desire of the Gers Department to develop and structure an energy-based wood industry in its territory. The 120 kW shredded wood boiler aims to cover more than 90 % of the college’s heat requirements. (English) / qualifier
 
point in time: 18 November 2021
Timestamp+2021-11-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:47, 18 November 2021

Project Q3682819 in France
Language Label Description Also known as
English
No label defined
Project Q3682819 in France

    Statements

    0 references
    77,831.89 Euro
    0 references
    111,188.42 Euro
    0 references
    70.0 percent
    0 references
    1 June 2016
    0 references
    30 December 2018
    0 references
    CONSEIL DEPARTEMENTAL DU GERS
    0 references
    L'installation d'une chaufferie bois dans le nouveau collège en construction à l'Isle-Jourdain concrétise la volonté du Département du Gers de développer et structurer une filière bois énergie sur son territoire. La chaudière de 120 kW au bois déchiqueté a pour objectif de couvrir plus de 90 % des besoins en chaleur du collège. (French)
    0 references
    The installation of a wood boiler room in the new college under construction in Isle-Jourdain gives concrete expression to the desire of the Gers Department to develop and structure an energy-based wood industry in its territory. The 120 kW shredded wood boiler aims to cover more than 90 % of the college’s heat requirements. (English)
    18 November 2021
    0 references

    Identifiers

    MP0016989
    0 references