(Created claim: summary (P836): 5 farms, located within an average radius of 2 km, have embarked on a collective project of methanisation unit in the commune of Athis-Val-de-Rouvre.The Méthathis association was created in January 2017 to carry out the economic technicco feasibility study of this project. Since February 2018, S.A.S Méthathis has replaced the association in order to finalise the studies and invest in the construction of the methanisation site.The unit will be lo...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
ERDF SAS METHATHIS — CREATION OF AN INJECTION METHANISATION UNIT |
Revision as of 16:53, 18 November 2021
Project Q3680054 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | ERDF SAS METHATHIS — CREATION OF AN INJECTION METHANISATION UNIT |
Project Q3680054 in France |
Statements
300,000.00 Euro
0 references
4,290,303.9 Euro
0 references
6.99 percent
0 references
1 October 2018
0 references
30 June 2021
0 references
METHATHIS
0 references
61430
0 references
5 exploitations agricoles, localisées dans un rayon moyen de 2km, se sont engagées dans un projet collectif d'unité de méthanisation sur la commune d'Athis-Val-de-Rouvre.L'association Méthathis a été créée en janvier 2017 pour porter l'étude de faisabilité technicco économique de ce projet. Depuis le mois de février 2018, la S.A.S Méthathis a remplacé l'association afin de finaliser les études et investir dans la construction du site de méthanisation.L'unité sera implantée sur la commune d'Athis Val de Rouvre à proximité de l'exploitation de Mr Olivier Husnot, Président de la SAS Méthathis.Le biométhane produit sera injecté dans le réseau public de distribution de gaz géré par GrDF situé à environ 4km. La SAS Méthathis a réservé une capacité d'injection de 130Nm3/h de biométhane, mais le projet est dimensionné pour un débit de l'ordre de 112Nm3/h. (French)
0 references
5 farms, located within an average radius of 2 km, have embarked on a collective project of methanisation unit in the commune of Athis-Val-de-Rouvre.The Méthathis association was created in January 2017 to carry out the economic technicco feasibility study of this project. Since February 2018, S.A.S Méthathis has replaced the association in order to finalise the studies and invest in the construction of the methanisation site.The unit will be located in the municipality of Athis Val de Rouvre near the operation of Mr Olivier Husnot, President of SAS Méthathis.The biomethane produced will be injected into the public gas distribution network managed by GrDF located about 4 km away. The SAS Methathis reserved an injection capacity of 130Nm3/h of biomethane, but the project is sized for a flow rate of about 112Nm3/h. (English)
18 November 2021
0 references
Identifiers
18E02863
0 references