RENEWABLE ENERGY SOURCES IN THE MUNICIPALITY OF RZECZYCA (Q101799): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The aim of the project is to protect the environment by increasing the use of energy from renewable sources (RES). Achievement of this objective will be achieved through the achievement of the following specific objectives: • Improving ambient air quality by reducing greenhouse gas emissions by 350,35 tonnes of CO2 equivalent per year (base value 0),• diversification of energy sources together with improved energy security through the constructi...)
Property / summary
 
The aim of the project is to protect the environment by increasing the use of energy from renewable sources (RES). Achievement of this objective will be achieved through the achievement of the following specific objectives: • Improving ambient air quality by reducing greenhouse gas emissions by 350,35 tonnes of CO2 equivalent per year (base value 0),• diversification of energy sources together with improved energy security through the construction of 84 RES generation units (base value 0). The project includes the preparation of the necessary documentation and construction: — 23 solar central water heating systems — 33 installation of PV (on-grid) — 28 biomass boiler combined capacity installed within the project will be 0.93 MW. The project also covers project management costs (remuneration of own employees, information and publicity, investor supervision). The devices used shall be consistent with the concept of universal design, i.e. designed to be useful for all, to the greatest extent possible, without the need for adaptation or specialised design. Solar heating systems, PV installations, biomass boilers are planned to be built into private residential buildings (< 300 m²) from the rural area of the municipality, where no agricultural activity is carried out and energy will not be used for other economic activities. The beneficiaries of the final project are therefore the residents of the Republic of the Republic of Poland. The implementation of the investment is planned for 2018-2019 and is ready to be implemented. The project is of a lasting nature. The municipality will remain the owner of the constructed infrastructure during the lifetime of the project and will transfer it to the owners of the property in free of charge. Total investment in this project will amount to PLN 1 623 948,59 gross, of which PLN 1 431 393,00 is eligible for the project. VAT is considered as ineligible. (English)
Property / summary: The aim of the project is to protect the environment by increasing the use of energy from renewable sources (RES). Achievement of this objective will be achieved through the achievement of the following specific objectives: • Improving ambient air quality by reducing greenhouse gas emissions by 350,35 tonnes of CO2 equivalent per year (base value 0),• diversification of energy sources together with improved energy security through the construction of 84 RES generation units (base value 0). The project includes the preparation of the necessary documentation and construction: — 23 solar central water heating systems — 33 installation of PV (on-grid) — 28 biomass boiler combined capacity installed within the project will be 0.93 MW. The project also covers project management costs (remuneration of own employees, information and publicity, investor supervision). The devices used shall be consistent with the concept of universal design, i.e. designed to be useful for all, to the greatest extent possible, without the need for adaptation or specialised design. Solar heating systems, PV installations, biomass boilers are planned to be built into private residential buildings (< 300 m²) from the rural area of the municipality, where no agricultural activity is carried out and energy will not be used for other economic activities. The beneficiaries of the final project are therefore the residents of the Republic of the Republic of Poland. The implementation of the investment is planned for 2018-2019 and is ready to be implemented. The project is of a lasting nature. The municipality will remain the owner of the constructed infrastructure during the lifetime of the project and will transfer it to the owners of the property in free of charge. Total investment in this project will amount to PLN 1 623 948,59 gross, of which PLN 1 431 393,00 is eligible for the project. VAT is considered as ineligible. (English) / rank
 
Normal rank

Revision as of 09:31, 6 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
RENEWABLE ENERGY SOURCES IN THE MUNICIPALITY OF RZECZYCA
Project in Poland financed by DG Regio

    Statements

    0 references
    1,130,800.47 zloty
    0 references
    271,392.1128 Euro
    13 January 2020
    0 references
    1,623,948.59 zloty
    0 references
    389,747.6616 Euro
    13 January 2020
    0 references
    79.0 percent
    0 references
    31 January 2018
    0 references
    31 December 2020
    0 references
    GMINA RZECZYCA
    0 references

    51°35'55.0"N, 20°17'49.6"E
    0 references
    Celem głównym projektu jest ochrona środowiska naturalnego poprzez zwiększenie wykorzystania energii ze źródeł odnawialnych (OZE). Realizacja ww. celu możliwa będzie poprzez osiągnięcie następujących celów szczegółowych: •poprawa jakości powietrza atmosferycznego poprzez spadek emisji gazów cieplarnianych o 350,35 ton równoważnika CO2 rocznie (wartość bazowa 0), •dywersyfikacja źródeł energii wraz z poprawą bezpieczeństwa energetycznego poprzez wybudowanie 84 jednostek wytwarzania energii z OZE (wartość bazowa 0). Projekt obejmuje przygotowanie niezbędnej dokumentacji i budowę: - 23 solarnych systemów grzewczych centralnej wody użytkowej - 33 instalacji PV (on-grid) - 28 kotłów na biomasę Łączną moc zainstalowana w ramach projektu wyniesie 0,93 MW. Projekt swym zakresem obejmuje również koszty zarządzania projektem (wynagrodzenie pracowników własnych, informacja i promocja, nadzór inwestorski). Wykorzystywane urządzenia będą zgodne z koncepcją uniwersalnego projektowania, tzn. stworzone w taki sposób, by były użyteczne dla wszystkich, w możliwie największym stopniu, bez potrzeby adaptacji lub specjalistycznego projektowania. Solarne systemy grzewcze, instalacje PV, kotły na biomasę planowane są do budowy na/w prywatnych budynkach mieszkalnych (< 300 m2) z terenu wiejskiej gminy Rzeczyca, gdzie nie jest prowadzona działalność rolnicza i powstała energia nie będzie wykorzystana na potrzeby innej działalności gospodarczej. Beneficjentami ostatecznymi projektu są zatem mieszkańcy Gminy Rzeczyca. Realizację inwestycji zaplanowano na lata 2018-2019 i jest gotowa do realizacji. Projekt ma trwały charakter. Gmina pozostanie w okresie trwałości projektu właścicielem wybudowanej infrastruktury i przekaże ją właścicielom nieruchomości w nieodpłatne użytkowanie. Nakłady inwestycyjne na realizację tego projektu wyniosą łącznie 1 623 948,59 PLN brutto, z czego kwotę 1 431 393,00 PLN stanowią koszty kwalifikowalne projektu.Podatek VAT uznaje się za niekwalifikowalny (Polish)
    0 references
    The aim of the project is to protect the environment by increasing the use of energy from renewable sources (RES). Achievement of this objective will be achieved through the achievement of the following specific objectives: • Improving ambient air quality by reducing greenhouse gas emissions by 350,35 tonnes of CO2 equivalent per year (base value 0),• diversification of energy sources together with improved energy security through the construction of 84 RES generation units (base value 0). The project includes the preparation of the necessary documentation and construction: — 23 solar central water heating systems — 33 installation of PV (on-grid) — 28 biomass boiler combined capacity installed within the project will be 0.93 MW. The project also covers project management costs (remuneration of own employees, information and publicity, investor supervision). The devices used shall be consistent with the concept of universal design, i.e. designed to be useful for all, to the greatest extent possible, without the need for adaptation or specialised design. Solar heating systems, PV installations, biomass boilers are planned to be built into private residential buildings (< 300 m²) from the rural area of the municipality, where no agricultural activity is carried out and energy will not be used for other economic activities. The beneficiaries of the final project are therefore the residents of the Republic of the Republic of Poland. The implementation of the investment is planned for 2018-2019 and is ready to be implemented. The project is of a lasting nature. The municipality will remain the owner of the constructed infrastructure during the lifetime of the project and will transfer it to the owners of the property in free of charge. Total investment in this project will amount to PLN 1 623 948,59 gross, of which PLN 1 431 393,00 is eligible for the project. VAT is considered as ineligible. (English)
    0 references

    Identifiers

    RPLD.04.01.02-10-0110/18
    0 references