RENOVATION OF PUBLIC BUILDINGS IN THE MUNICIPALITY OF OZORKÓW (Q101870): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): THE MAIN AIM OF THE PROJECT IS: INCREASING THE ENERGY EFFICIENCY OF THE PUBLIC BUILDING IN THE MUNICIPALITY OF OZORKÓW BY MEANS OF THERMO-MODERNISATION OF THE SCHOOL BUILDING — A GROUP OF SCHOOLS IN THE MODLNE GROUP. THE TARGET GROUP OF THE PROJECT IS THE STUDENTS AND STAFF OF THE SCHOOLS (263 PEOPLE) AND INDIRECTLY ALL INHABITANTS OF THE DISTRICT OF ZIERSKI AND ŁÓDZKIE REGION. THE SCOPE OF THE PROJECT INCLUDES: INSULATION OF THE INTERNAL WALL,...)
Property / summary
 
THE MAIN AIM OF THE PROJECT IS: INCREASING THE ENERGY EFFICIENCY OF THE PUBLIC BUILDING IN THE MUNICIPALITY OF OZORKÓW BY MEANS OF THERMO-MODERNISATION OF THE SCHOOL BUILDING — A GROUP OF SCHOOLS IN THE MODLNE GROUP. THE TARGET GROUP OF THE PROJECT IS THE STUDENTS AND STAFF OF THE SCHOOLS (263 PEOPLE) AND INDIRECTLY ALL INHABITANTS OF THE DISTRICT OF ZIERSKI AND ŁÓDZKIE REGION. THE SCOPE OF THE PROJECT INCLUDES: INSULATION OF THE INTERNAL WALL, ROOF INSULATION, REPLACEMENT OF WINDOWS, REPLACEMENT OF DOORS, MODERNISATION OF THE HEATING SYSTEM (REPLACEMENT OF OLD BOILERS FOR NEW CONDENSATION), MODERNISATION OF THE INTERIOR LIGHTING, MODERNISATION OF VENTILATION. EXPENDITURE SHALL INCLUDE THE CARRYING OUT OF THE NECESSARY ACCOMPANYING MEASURES. FOR THE PURPOSES OF THE IMPLEMENTATION OF THE PROJECT, THE PROJECT HAS BEEN THE SUBJECT OF PROCEEDINGS. DESIGN DOCUMENTATION AND ENERGY AUDITS. THERE ARE NO RISKS TO THE PROJECT: THE MUNICIPALITY HAS A REGULATED OWNERSHIP POINT (THE BUILDING, THE LAND IS OWNED BY THE MUNICIPALITY), THE FUNDS TO COVER THE OWN CONTRIBUTION HAVE BEEN SECURED IN THE MUNICIPAL BUDGET. THE PROJECT HAS PROPERLY DESIGNED EVALUATION INDICATORS AND WILL HAVE SIGNIFICANT LONG-TERM EFFECTS FOR THE REGION: PRODUCTS: — NUMBER OF MODERNISED BUILDINGS: 1 TONNES; USEFUL FLOOR AREA OF RENOVATED BUILDINGS: 3 183,91 M2; — NUMBER OF IMPROVED HEAT SOURCES: 1 UNIT. RESULTS: ESTIMATED ANNUAL DECREASE IN GREENHOUSE GAS (GHG) EMISSIONS (CO34): 104.05 T EQUIVALENT CO2/ROK; — REDUCTION OF ANNUAL PRIMARY ENERGY CONSUMPTION IN PUBLIC BUILDINGS (CO32): 344 376.45 KWH/YEAR; AMOUNT OF ELECTRICITY SAVED: 39.24 MWH/YEAR; AMOUNT OF THERMAL ENERGY SAVED: 1628,28 GJ/YEAR. THE PROJECT IS COMPREHENSIVE. ENERGY EFFICIENCY WAS IMPROVED BY 61.51 % IN RELATION TO THE INITIAL STATE. THE PROJECT IS READY FOR IMPLEMENTATION. (English)
Property / summary: THE MAIN AIM OF THE PROJECT IS: INCREASING THE ENERGY EFFICIENCY OF THE PUBLIC BUILDING IN THE MUNICIPALITY OF OZORKÓW BY MEANS OF THERMO-MODERNISATION OF THE SCHOOL BUILDING — A GROUP OF SCHOOLS IN THE MODLNE GROUP. THE TARGET GROUP OF THE PROJECT IS THE STUDENTS AND STAFF OF THE SCHOOLS (263 PEOPLE) AND INDIRECTLY ALL INHABITANTS OF THE DISTRICT OF ZIERSKI AND ŁÓDZKIE REGION. THE SCOPE OF THE PROJECT INCLUDES: INSULATION OF THE INTERNAL WALL, ROOF INSULATION, REPLACEMENT OF WINDOWS, REPLACEMENT OF DOORS, MODERNISATION OF THE HEATING SYSTEM (REPLACEMENT OF OLD BOILERS FOR NEW CONDENSATION), MODERNISATION OF THE INTERIOR LIGHTING, MODERNISATION OF VENTILATION. EXPENDITURE SHALL INCLUDE THE CARRYING OUT OF THE NECESSARY ACCOMPANYING MEASURES. FOR THE PURPOSES OF THE IMPLEMENTATION OF THE PROJECT, THE PROJECT HAS BEEN THE SUBJECT OF PROCEEDINGS. DESIGN DOCUMENTATION AND ENERGY AUDITS. THERE ARE NO RISKS TO THE PROJECT: THE MUNICIPALITY HAS A REGULATED OWNERSHIP POINT (THE BUILDING, THE LAND IS OWNED BY THE MUNICIPALITY), THE FUNDS TO COVER THE OWN CONTRIBUTION HAVE BEEN SECURED IN THE MUNICIPAL BUDGET. THE PROJECT HAS PROPERLY DESIGNED EVALUATION INDICATORS AND WILL HAVE SIGNIFICANT LONG-TERM EFFECTS FOR THE REGION: PRODUCTS: — NUMBER OF MODERNISED BUILDINGS: 1 TONNES; USEFUL FLOOR AREA OF RENOVATED BUILDINGS: 3 183,91 M2; — NUMBER OF IMPROVED HEAT SOURCES: 1 UNIT. RESULTS: ESTIMATED ANNUAL DECREASE IN GREENHOUSE GAS (GHG) EMISSIONS (CO34): 104.05 T EQUIVALENT CO2/ROK; — REDUCTION OF ANNUAL PRIMARY ENERGY CONSUMPTION IN PUBLIC BUILDINGS (CO32): 344 376.45 KWH/YEAR; AMOUNT OF ELECTRICITY SAVED: 39.24 MWH/YEAR; AMOUNT OF THERMAL ENERGY SAVED: 1628,28 GJ/YEAR. THE PROJECT IS COMPREHENSIVE. ENERGY EFFICIENCY WAS IMPROVED BY 61.51 % IN RELATION TO THE INITIAL STATE. THE PROJECT IS READY FOR IMPLEMENTATION. (English) / rank
 
Normal rank

Revision as of 09:26, 6 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
RENOVATION OF PUBLIC BUILDINGS IN THE MUNICIPALITY OF OZORKÓW
Project in Poland financed by DG Regio

    Statements

    0 references
    1,007,318.95 zloty
    0 references
    241,756.54799999998 Euro
    13 January 2020
    0 references
    2,180,466.45 zloty
    0 references
    523,311.94800000003 Euro
    13 January 2020
    0 references
    57.04 percent
    0 references
    1 March 2017
    0 references
    31 December 2019
    0 references
    GMINA OZORKÓW
    0 references
    CELEM GŁÓWNYM PROJEKTU JEST: ZWIĘKSZENIE EFEKTYWNOŚCI ENERGETYCZNEJ BUDYNKU UŻYTECZNOŚCI PUBLICZNEJ W GMINIE OZORKÓW POPRZEZ TERMOMODERNIZACJĘ BUDYNKU OŚWIATOWEGO – ZESPOŁU SZKÓŁ W MODLNEJ. GRUPĄ DOCELOWĄ PROJEKTU SĄ UCZNIOWIE I PRACOWNICY SZKÓŁ (263 OSOBY) ORAZ POŚREDNIO WSZYSCY MIESZKAŃCY POWIATU ZGIERSKIEGO I WOJEWÓDZTWA ŁÓDZKIEGO. ZAKRES RZECZOWY PROJEKTU OBEJMUJE: DOCIEPLENIE ŚCIAN ZEWN., DOCIEPLENIE DACHU, WYMIANĘ OKIEN, WYMIANĘ DRZWI, MODERNIZACJĘ SYSTEMU GRZEWCZEGO (WYMIANA STARYCH KOTŁÓW NA NOWE KONDENSACYJNE), MODERNIZACJĘ OŚWIETLENIA WEWNĘTRZNEGO, MODERNIZACJĘ WENTYLACJI. NAKŁADY OBEJMUJĄ PRZEPROWADZENIE NIEZBĘDNYCH ROBÓT TOWARZYSZĄCYCH. NA POTRZEBY REALIZACJI PROJEKTU ZOSTAŁA OPRAC. DOKUMENTACJA PROJEKTOWA ORAZ AUDYTY ENERGETYCZNE. NIE PRZEWIDZIANO ZAGROŻEŃ DLA REALIZACJI PROJEKTU: GMINA POSIADA UREGULOWANE KWESTIE WŁASNOŚCIOWE (BUDYNEK, GRUNTY SĄ WŁASNOŚCIĄ GMINY), ŚRODKI NA POKRYCIE WKŁADU WŁASNEGO ZOSTAŁY ZABEZPIECZONE W BUDŻECIE GMINY. PROJEKT MA PRAWIDŁOWO SKONSTRUOWANE WSKAŹNIKI OCENY I WYWOŁA ZNACZNE ODDZIAŁYWANIA DŁUGOTERMINOWE DLA REGIONU: PRODUKTY: - LICZBA ZMODERNIZOWANYCH ENERGETYCZNIE BUDYNKÓW: 1 SZT.; - POWIERZCHNIA UŻYTKOWA BUDYNKÓW PODDANYCH TERMOMODERNIZACJI: 3 183,91 M2; -LICZBA ZMODERNIZOWANYCH ŹRÓDEŁ CIEPŁA: 1 SZT. REZULTATY: - SZACOWANY ROCZNY SPADEK EMISJI GAZÓW CIEPLARNIANYCH (CO34): 104,05 T RÓWNOWAŻNIKA CO2/ROK; - ZMNIEJSZENIE ROCZNEGO ZUŻYCIA ENERGII PIERWOTNEJ W BUDYNKACH PUBLICZNYCH (CO32): 344 376,45 KWH/ROK; - ILOŚĆ ZAOSZCZĘDZONEJ ENERGII ELEKTRYCZNEJ: 39,24 MWH/ROK; - ILOŚĆ ZAOSZCZĘDZONEJ ENERGII CIEPLNEJ: 1628,28 GJ/ROK. PROJEKT JEST KOMPLEKSOWY. POPRAWA EFEKTYWNOŚCI ENERGETYCZNEJ W ODNIESIENIU DO STANIU POCZĄTKOWEGO ZOSTAŁA OBLICZONA NA POZIOMIE 61,51% . PROJEKT JEST GOTOWY DO WDROŻENIA. (Polish)
    0 references
    THE MAIN AIM OF THE PROJECT IS: INCREASING THE ENERGY EFFICIENCY OF THE PUBLIC BUILDING IN THE MUNICIPALITY OF OZORKÓW BY MEANS OF THERMO-MODERNISATION OF THE SCHOOL BUILDING — A GROUP OF SCHOOLS IN THE MODLNE GROUP. THE TARGET GROUP OF THE PROJECT IS THE STUDENTS AND STAFF OF THE SCHOOLS (263 PEOPLE) AND INDIRECTLY ALL INHABITANTS OF THE DISTRICT OF ZIERSKI AND ŁÓDZKIE REGION. THE SCOPE OF THE PROJECT INCLUDES: INSULATION OF THE INTERNAL WALL, ROOF INSULATION, REPLACEMENT OF WINDOWS, REPLACEMENT OF DOORS, MODERNISATION OF THE HEATING SYSTEM (REPLACEMENT OF OLD BOILERS FOR NEW CONDENSATION), MODERNISATION OF THE INTERIOR LIGHTING, MODERNISATION OF VENTILATION. EXPENDITURE SHALL INCLUDE THE CARRYING OUT OF THE NECESSARY ACCOMPANYING MEASURES. FOR THE PURPOSES OF THE IMPLEMENTATION OF THE PROJECT, THE PROJECT HAS BEEN THE SUBJECT OF PROCEEDINGS. DESIGN DOCUMENTATION AND ENERGY AUDITS. THERE ARE NO RISKS TO THE PROJECT: THE MUNICIPALITY HAS A REGULATED OWNERSHIP POINT (THE BUILDING, THE LAND IS OWNED BY THE MUNICIPALITY), THE FUNDS TO COVER THE OWN CONTRIBUTION HAVE BEEN SECURED IN THE MUNICIPAL BUDGET. THE PROJECT HAS PROPERLY DESIGNED EVALUATION INDICATORS AND WILL HAVE SIGNIFICANT LONG-TERM EFFECTS FOR THE REGION: PRODUCTS: — NUMBER OF MODERNISED BUILDINGS: 1 TONNES; USEFUL FLOOR AREA OF RENOVATED BUILDINGS: 3 183,91 M2; — NUMBER OF IMPROVED HEAT SOURCES: 1 UNIT. RESULTS: ESTIMATED ANNUAL DECREASE IN GREENHOUSE GAS (GHG) EMISSIONS (CO34): 104.05 T EQUIVALENT CO2/ROK; — REDUCTION OF ANNUAL PRIMARY ENERGY CONSUMPTION IN PUBLIC BUILDINGS (CO32): 344 376.45 KWH/YEAR; AMOUNT OF ELECTRICITY SAVED: 39.24 MWH/YEAR; AMOUNT OF THERMAL ENERGY SAVED: 1628,28 GJ/YEAR. THE PROJECT IS COMPREHENSIVE. ENERGY EFFICIENCY WAS IMPROVED BY 61.51 % IN RELATION TO THE INITIAL STATE. THE PROJECT IS READY FOR IMPLEMENTATION. (English)
    0 references

    Identifiers

    RPLD.04.02.01-10-0005/17
    0 references