Energy modernisation of the Farm House of the Daily Residence building at the Sun-4 Street in Gostytin (Q98273): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The subject of the project is the comprehensive energy upgrade of the farm house of the Residence in Gostycyn at Gostycyn Street, 4. Project activities planned: modernisation of CO installations, insulation of walls of the building (including performance of the façade, replacement of window frames and doors for the outside, thermal renovation of roof panel, installation of a renewable energy boiler — pelet, air conditioning installation. the tas...)
Property / summary
 
The subject of the project is the comprehensive energy upgrade of the farm house of the Residence in Gostycyn at Gostycyn Street, 4. Project activities planned: modernisation of CO installations, insulation of walls of the building (including performance of the façade, replacement of window frames and doors for the outside, thermal renovation of roof panel, installation of a renewable energy boiler — pelet, air conditioning installation. the tasks foreseen in the project include: Preparatory work (project documentation, energy audit, ornithological studies and chirophoterology, feasibility study and application for funding), construction works (works on building renovation, renovation works, replacement of window and door frames, insulation of external walls, insulation of the roof, lightning system, installation of air conditioning), Modernisation of CO installation, investor’s supervision, project management, project promoter. (English)
Property / summary: The subject of the project is the comprehensive energy upgrade of the farm house of the Residence in Gostycyn at Gostycyn Street, 4. Project activities planned: modernisation of CO installations, insulation of walls of the building (including performance of the façade, replacement of window frames and doors for the outside, thermal renovation of roof panel, installation of a renewable energy boiler — pelet, air conditioning installation. the tasks foreseen in the project include: Preparatory work (project documentation, energy audit, ornithological studies and chirophoterology, feasibility study and application for funding), construction works (works on building renovation, renovation works, replacement of window and door frames, insulation of external walls, insulation of the roof, lightning system, installation of air conditioning), Modernisation of CO installation, investor’s supervision, project management, project promoter. (English) / rank
 
Normal rank

Revision as of 07:45, 6 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy modernisation of the Farm House of the Daily Residence building at the Sun-4 Street in Gostytin
Project in Poland financed by DG Regio

    Statements

    0 references
    327,201.49 zloty
    0 references
    78,528.35759999999 Euro
    13 January 2020
    0 references
    536,870.04 zloty
    0 references
    128,848.80960000001 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    27 April 2016
    0 references
    31 May 2018
    0 references
    GMINA GOSTYCYN
    0 references
    Przedmiotem projektu jest kompleksowa modernizacja energetyczna budynku Domu Dziennego Pobytu w Gostycynie przy ulicy Słonecznej 4. Planowane działania w ramach projektu: modernizacja instalacji CO, docieplenie ścian budynku (wraz z wykonaniem elewacji, wymiana stolarki okiennej oraz drzwiowej zewnętrznej, termomodernizacja poszycia dachowego, instalacja kotła zasilanego OZE - pelet, montaż klimatyzacji. zadania przewidziane w ramach projektu obejmują: Prace przygotowawcze (dokumentacja projektowa, audyt energetyczny, ekspertyzy ornitologiczne i chiropterologiczne, studium wykonalności i wniosek o dofinansowanie), Roboty budowlane (prace w zakresie termomodernizacji budynku, roboty rozbiórkowe, wymiana stolarki okiennej i drzwiowej, docieplenie ścian zewnętrznych, docieplenie dachu, instalacja odgromowa, montaż klimatyzacji), Modernizacja instalacji CO, Nadzór inwestorski, Zarządzanie projektem, Promocja projektu. (Polish)
    0 references
    The subject of the project is the comprehensive energy upgrade of the farm house of the Residence in Gostycyn at Gostycyn Street, 4. Project activities planned: modernisation of CO installations, insulation of walls of the building (including performance of the façade, replacement of window frames and doors for the outside, thermal renovation of roof panel, installation of a renewable energy boiler — pelet, air conditioning installation. the tasks foreseen in the project include: Preparatory work (project documentation, energy audit, ornithological studies and chirophoterology, feasibility study and application for funding), construction works (works on building renovation, renovation works, replacement of window and door frames, insulation of external walls, insulation of the roof, lightning system, installation of air conditioning), Modernisation of CO installation, investor’s supervision, project management, project promoter. (English)
    0 references

    Identifiers

    RPKP.03.03.00-04-0123/16