Thermal modernisation of the Public B Building, Urban Construction No 2, at ul. Clear 5 on plot 1475/6. (Q98263): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project concerned is concerned with the thermal renovation of the Urban Agenda 2 in Żnina. The building is located at ul. Klemens Jaąca 10 and Building B, located at ul. Clear 5 in Żnina. The investment in question concerns Building B. The main aim of the project is to improve the energy efficiency of the public utility building — Urban enterprise No 2 in Żnina. Within the framework of this project, the applicant provided tasks in the form o...) |
||
Property / summary | |||
The project concerned is concerned with the thermal renovation of the Urban Agenda 2 in Żnina. The building is located at ul. Klemens Jaąca 10 and Building B, located at ul. Clear 5 in Żnina. The investment in question concerns Building B. The main aim of the project is to improve the energy efficiency of the public utility building — Urban enterprise No 2 in Żnina. Within the framework of this project, the applicant provided tasks in the form of: • Preparation of technical documentation,• construction and assembly works,• Investment surveillance,• Information and project promotion. In view of the existing technical state of the Urban Agenda 2 in Żnina and on the basis of an energy audit of the Facility, the applicant is planning to carry out the project in question with a material scope which includes the following thermomodernisation measures: • insulation: façades, foundation walls, roof walls and entrance,• replacement of the existing window and door frames: the window in the basement, ground floor and floor, the door external to the new and meeting the permeability values of the partitions and the replacement works after the replacement of joiners. • the exchange of electrical and sanitary installations on the ground floor and basement (replacement of the installation of lighting integrated into the new energy efficient LED, including the replacement of electrical installations which do not meet the technical requirements, and the provision of optimum lighting control),• the replacement of radiators and installations of c.o. (basement, ground floor) and the modernisation of the heating and hot water installations;• the demolition of the existing chimney and the assembly of the steel commission to the gas furnace. (English) | |||
Property / summary: The project concerned is concerned with the thermal renovation of the Urban Agenda 2 in Żnina. The building is located at ul. Klemens Jaąca 10 and Building B, located at ul. Clear 5 in Żnina. The investment in question concerns Building B. The main aim of the project is to improve the energy efficiency of the public utility building — Urban enterprise No 2 in Żnina. Within the framework of this project, the applicant provided tasks in the form of: • Preparation of technical documentation,• construction and assembly works,• Investment surveillance,• Information and project promotion. In view of the existing technical state of the Urban Agenda 2 in Żnina and on the basis of an energy audit of the Facility, the applicant is planning to carry out the project in question with a material scope which includes the following thermomodernisation measures: • insulation: façades, foundation walls, roof walls and entrance,• replacement of the existing window and door frames: the window in the basement, ground floor and floor, the door external to the new and meeting the permeability values of the partitions and the replacement works after the replacement of joiners. • the exchange of electrical and sanitary installations on the ground floor and basement (replacement of the installation of lighting integrated into the new energy efficient LED, including the replacement of electrical installations which do not meet the technical requirements, and the provision of optimum lighting control),• the replacement of radiators and installations of c.o. (basement, ground floor) and the modernisation of the heating and hot water installations;• the demolition of the existing chimney and the assembly of the steel commission to the gas furnace. (English) / rank | |||
Normal rank |
Revision as of 07:45, 6 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the Public B Building, Urban Construction No 2, at ul. Clear 5 on plot 1475/6. |
Project in Poland financed by DG Regio |
Statements
941,313.89 zloty
0 references
1,637,495.32 zloty
0 references
57.48 percent
0 references
2 November 2016
0 references
30 September 2018
0 references
GMINA ŻNIN
0 references
Przedmiotowy projekt dotyczy termomodernizacji budynku Przedszkola Miejskiego Nr 2 w Żninie. Siedzibą Przedszkola Miejskiego Nr 2 w Żninie jest budynek A mieszczący się przy ul. Klemensa Janickiego 10 i budynek B mieszczący się przy ul. Jasnej 5 w Żninie. Przedmiotowa inwestycja dotyczy budynku B. Celem głównym projektu jest poprawa efektywności energetycznej budynku użyteczności publicznej – Przedszkola Miejskiego Nr 2 w Żninie. W ramach przedmiotowego projektu Wnioskodawca przewidział zadania w postaci: • Przygotowanie dokumentacji technicznej, • Roboty budowlano-montażowe, • Nadzór inwestorski, • Informacja i promocja projektu. W związku z istniejącym stanem technicznym budynku Przedszkola Miejskiego nr 2 w Żninie oraz na podstawie przeprowadzonego audytu energetycznego obiektu Wnioskodawca planuje realizację przedmiotowego projektu w zakresie rzeczowym obejmującym następujące działania termomodernizacyjne: •wykonanie docieplenia: elewacji wraz z wykonaniem tynku, ścian fundamentowych, dachu oraz stropu nad wejściem, •wymianę istniejącej stolarki okiennej i drzwiowej: okiennej w piwnicy, na parterze i piętrze, drzwiowej zewnętrznej na nową spełniającą wartości przenikalności przegród oraz prace odtworzeniowe pomieszczeń po wymianie stolarki. •wymianę instalacji elektrycznej i sanitarnej na parterze i piwnicy (wymianę instalacji oświetlenia wbudowanego na nowe energooszczędne LED wraz z wymianą instalacji elektrycznej niespełniającej wymagań technicznych oraz zapewnienie optymalnego sterowania oświetleniem), •wymianę grzejników i instalacji c.o. (piwnica, parter) oraz modernizację instalacji c.o i c.w.u., •wyburzenie istniejącego komina zewnętrznego oraz montaż komina stalowego do pieca gazowego. (Polish)
0 references
The project concerned is concerned with the thermal renovation of the Urban Agenda 2 in Żnina. The building is located at ul. Klemens Jaąca 10 and Building B, located at ul. Clear 5 in Żnina. The investment in question concerns Building B. The main aim of the project is to improve the energy efficiency of the public utility building — Urban enterprise No 2 in Żnina. Within the framework of this project, the applicant provided tasks in the form of: • Preparation of technical documentation,• construction and assembly works,• Investment surveillance,• Information and project promotion. In view of the existing technical state of the Urban Agenda 2 in Żnina and on the basis of an energy audit of the Facility, the applicant is planning to carry out the project in question with a material scope which includes the following thermomodernisation measures: • insulation: façades, foundation walls, roof walls and entrance,• replacement of the existing window and door frames: the window in the basement, ground floor and floor, the door external to the new and meeting the permeability values of the partitions and the replacement works after the replacement of joiners. • the exchange of electrical and sanitary installations on the ground floor and basement (replacement of the installation of lighting integrated into the new energy efficient LED, including the replacement of electrical installations which do not meet the technical requirements, and the provision of optimum lighting control),• the replacement of radiators and installations of c.o. (basement, ground floor) and the modernisation of the heating and hot water installations;• the demolition of the existing chimney and the assembly of the steel commission to the gas furnace. (English)
0 references
Identifiers
RPKP.03.03.00-04-0102/16
0 references