Cleaning of water and wastewater management in the municipality of Wiszonia Mala (Q95844): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The purpose of the project is to order the water and wastewater management in the area of the Municipality of Wiszech Mana. The project will be implemented under 7 Contracts: K1 — Development of a PFU and a SW for the project — contract made with K2 — Construction and reconstruction of a sewage treatment plant in Strzeszów, the municipality of Wishyn Mala (bankruptcy of the Contractors’ failure to implement) K3 — Supply of specialised suction to...)
Property / summary
 
The purpose of the project is to order the water and wastewater management in the area of the Municipality of Wiszech Mana. The project will be implemented under 7 Contracts: K1 — Development of a PFU and a SW for the project — contract made with K2 — Construction and reconstruction of a sewage treatment plant in Strzeszów, the municipality of Wishyn Mala (bankruptcy of the Contractors’ failure to implement) K3 — Supply of specialised suction to clean the sewage system and a tractor with a trailer to operate the sludge management system in Strzeszów K4 — Reconstruction of the water main DN 250 mm to ul. Settlement and construction of a water supply in ul. Settlement and Lip in Strzeszów K5 — Reconstruction and extension of the sanitary sewage system in the agglomeration of Wiszonia Mła K6 — Substantive services in the management of the project, settlement and inspection of the K7 Works — Infa-ferry operation. The activities covered by this project are a means of removing the shortage of water and sewage systems in the municipality. construction of the sewerage system, in the village of Wiszeszów, will increase the degree of sewerage in the area concerned and the extension and reconstruction of the sewage treatment plant in Strzeszów will result in the extension of the existing sewage treatment plant and the reconstruction of the existing water treatment plant in Strzeszów. it will be possible to upgrade the existing sewage water mains and the tractor with the trailer required to operate the system for the management of the sewage system and the sewage water treatment plant in Strzeszów. the construction of the constructed network will be 2,81 k.m.s. The construction of the sewerage system will be reconstructed and the sewerage system will be constructed in the agglomeration of Wiszeszów. the constructed network will be reconstructed and the sewerage system will be upgraded in the agglomeration of Wiszeszów. the construction of the constructed network will be 1.4 km.Length of the constructed network is 250. (English)
Property / summary: The purpose of the project is to order the water and wastewater management in the area of the Municipality of Wiszech Mana. The project will be implemented under 7 Contracts: K1 — Development of a PFU and a SW for the project — contract made with K2 — Construction and reconstruction of a sewage treatment plant in Strzeszów, the municipality of Wishyn Mala (bankruptcy of the Contractors’ failure to implement) K3 — Supply of specialised suction to clean the sewage system and a tractor with a trailer to operate the sludge management system in Strzeszów K4 — Reconstruction of the water main DN 250 mm to ul. Settlement and construction of a water supply in ul. Settlement and Lip in Strzeszów K5 — Reconstruction and extension of the sanitary sewage system in the agglomeration of Wiszonia Mła K6 — Substantive services in the management of the project, settlement and inspection of the K7 Works — Infa-ferry operation. The activities covered by this project are a means of removing the shortage of water and sewage systems in the municipality. construction of the sewerage system, in the village of Wiszeszów, will increase the degree of sewerage in the area concerned and the extension and reconstruction of the sewage treatment plant in Strzeszów will result in the extension of the existing sewage treatment plant and the reconstruction of the existing water treatment plant in Strzeszów. it will be possible to upgrade the existing sewage water mains and the tractor with the trailer required to operate the system for the management of the sewage system and the sewage water treatment plant in Strzeszów. the construction of the constructed network will be 2,81 k.m.s. The construction of the sewerage system will be reconstructed and the sewerage system will be constructed in the agglomeration of Wiszeszów. the constructed network will be reconstructed and the sewerage system will be upgraded in the agglomeration of Wiszeszów. the construction of the constructed network will be 1.4 km.Length of the constructed network is 250. (English) / rank
 
Normal rank

Revision as of 07:35, 6 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Cleaning of water and wastewater management in the municipality of Wiszonia Mala
Project in Poland financed by DG Regio

    Statements

    0 references
    1,999,704.22 zloty
    0 references
    479,929.01279999997 Euro
    13 January 2020
    0 references
    3,949,445.95 zloty
    0 references
    947,867.028 Euro
    13 January 2020
    0 references
    62.38 percent
    0 references
    12 August 2016
    0 references
    30 November 2018
    0 references
    PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ SPÓŁKA Z O.O. W WISZNI MAŁEJ
    0 references
    Celem przedsięwzięcia jest uporządkowanie gospodarki wodno-ściekowej na obszarze Gminy Wisznia Mała. Projekt realizowany będzie w ramach 7 Kontraktów: K1–Opracowanie PFU oraz SW dla projektu – kontrakt wykonany K2–Rozbudowa i przebudowa oczyszczalni ścieków w Strzeszowie, gmina Wisznia Mała (upadłość Wykonawcy-brak realizacji) K3–Dostawa specjalistycznego wozu ssąco płuczącego do czyszczenia sieci kanalizacyjnych oraz ciągnika z przyczepą do obsługi systemu gospodarowania osadami na oczyszczalni ścieków w Strzeszowie K4–Przebudowa magistrali wodociągowej DN 250 mm z przyłączeniami na odcinku S5 do ul. Osiedlowej oraz budowa wodociągu w ul. Osiedlowej i Lipowej w Strzeszowie K5–Przebudowa i rozbudowa kanalizacji sanitarnej w aglomeracji Wisznia Mała K6–Usługi merytoryczne w zakresie zarządzania projektem, rozliczenie i inspekcja Robót K7–Działania inf.-prom. Działania objęte przedmiotowym projektem umożliwiają likwidację niedoborów zbiorczego systemu wodno-ściekowego na terenie ww. gminy.Budowa sieci kanalizacyjnej, w miejscowości Wisznia Mała, spowoduje zwiększenie stopnia skanalizowania na omawianym obszarze a rozbudowa i przebudowa oczyszczalni ścieków w Strzeszowie umożliwi zapewnienie wysokiego poziomu oczyszczania większej ilości ścieków bytowych.Rozbudowa i przebudowa oczyszczalni ścieków w Strzeszowie polegać będzie na rozbudowie istniejącej oczyszczalni o nowy ciąg technol. i przebudowę istniejących inst. niezbędnych do jego prawidłowego funkcjonowania.Zaplanowano dostawę specj. wozu ssąco-płuczącego do czyszczenia sieci kanal. oraz ciągnika z przyczepą niezbędnego do obsługi systemu gospodarowania osadami i na oczyszczalni ścieków w Strzeszowie.Wykonana zostanie przebudowa magistrali wodociągowej DN250 mm z przyłączeniami oraz budowa wodociągu w Strzeszowie.Długość budowanej sieci wynosi 2,81km.Wykonana zostanie przebudowa i rozbudowa kanalizacji sanitarnej w aglomeracji Wisznia Mała.Długość budowanej sieci wynosi 1,4 (Polish)
    0 references
    The purpose of the project is to order the water and wastewater management in the area of the Municipality of Wiszech Mana. The project will be implemented under 7 Contracts: K1 — Development of a PFU and a SW for the project — contract made with K2 — Construction and reconstruction of a sewage treatment plant in Strzeszów, the municipality of Wishyn Mala (bankruptcy of the Contractors’ failure to implement) K3 — Supply of specialised suction to clean the sewage system and a tractor with a trailer to operate the sludge management system in Strzeszów K4 — Reconstruction of the water main DN 250 mm to ul. Settlement and construction of a water supply in ul. Settlement and Lip in Strzeszów K5 — Reconstruction and extension of the sanitary sewage system in the agglomeration of Wiszonia Mła K6 — Substantive services in the management of the project, settlement and inspection of the K7 Works — Infa-ferry operation. The activities covered by this project are a means of removing the shortage of water and sewage systems in the municipality. construction of the sewerage system, in the village of Wiszeszów, will increase the degree of sewerage in the area concerned and the extension and reconstruction of the sewage treatment plant in Strzeszów will result in the extension of the existing sewage treatment plant and the reconstruction of the existing water treatment plant in Strzeszów. it will be possible to upgrade the existing sewage water mains and the tractor with the trailer required to operate the system for the management of the sewage system and the sewage water treatment plant in Strzeszów. the construction of the constructed network will be 2,81 k.m.s. The construction of the sewerage system will be reconstructed and the sewerage system will be constructed in the agglomeration of Wiszeszów. the constructed network will be reconstructed and the sewerage system will be upgraded in the agglomeration of Wiszeszów. the construction of the constructed network will be 1.4 km.Length of the constructed network is 250. (English)
    0 references

    Identifiers

    RPDS.04.02.02-02-0004/16
    0 references