(‎Created claim: summary (P836): The project consists of an energy modernisation of the 3 buildings belonging to the ‘Spring’ multi-functional “Spring” (hereinafter referred to as the “Spring” or “Spring”), which is located in the ‘Spring’ of the municipality of Wolin, as well as additional activities. The scope, technical and economic parameters of the upgrade have been identified in the energy audit carried out. The modernisation works will consist of energy modernisation of...)
Property / summary
 
The project consists of an energy modernisation of the 3 buildings belonging to the ‘Spring’ multi-functional “Spring” (hereinafter referred to as the “Spring” or “Spring”), which is located in the ‘Spring’ of the municipality of Wolin, as well as additional activities. The scope, technical and economic parameters of the upgrade have been identified in the energy audit carried out. The modernisation works will consist of energy modernisation of the lower source of energy, the engine room heat pumps and the replacement of the heat source, the heating system, the hot and cold water installations, the modernisation of the energy ventilation system and the thermal modernisation of the 3 buildings: A, B and C and the connecting factor between object A and B: replacement of windows, thermal wall and roof insulation. The additional activities will be based on the following costs: Preparation of project documentation in the form of a feasibility study — project management by a qualified external company — information and promotional activities of the project. The beneficiary of the project is the Assembly of the School of School Province of Notre Dame Province, Poland and the project operator of the project is the multifunction facility led by the above-mentioned Assembly in the Małopolskie Province. This body will coordinate any work relating to the preparation, submission, implementation and subsequent project monitoring and settlement. The external contractor will be responsible for assisting in the proper management of the project. The beneficiaries of the project will be the inhabitants of the municipality of Wolow, the multi-facetted establishment of the ‘Viasna’, and the children of the ‘Spring’ Children of the Children’s House, as well as its workers, will benefit directly from the project’s implementation. The project will have a positive impact on the housing conditions of the children’s establishment, will significantly reduce the demand and use of heat in the spring of the ‘Spring’ facility. The project does not involve state aid. (English)
Property / summary: The project consists of an energy modernisation of the 3 buildings belonging to the ‘Spring’ multi-functional “Spring” (hereinafter referred to as the “Spring” or “Spring”), which is located in the ‘Spring’ of the municipality of Wolin, as well as additional activities. The scope, technical and economic parameters of the upgrade have been identified in the energy audit carried out. The modernisation works will consist of energy modernisation of the lower source of energy, the engine room heat pumps and the replacement of the heat source, the heating system, the hot and cold water installations, the modernisation of the energy ventilation system and the thermal modernisation of the 3 buildings: A, B and C and the connecting factor between object A and B: replacement of windows, thermal wall and roof insulation. The additional activities will be based on the following costs: Preparation of project documentation in the form of a feasibility study — project management by a qualified external company — information and promotional activities of the project. The beneficiary of the project is the Assembly of the School of School Province of Notre Dame Province, Poland and the project operator of the project is the multifunction facility led by the above-mentioned Assembly in the Małopolskie Province. This body will coordinate any work relating to the preparation, submission, implementation and subsequent project monitoring and settlement. The external contractor will be responsible for assisting in the proper management of the project. The beneficiaries of the project will be the inhabitants of the municipality of Wolow, the multi-facetted establishment of the ‘Viasna’, and the children of the ‘Spring’ Children of the Children’s House, as well as its workers, will benefit directly from the project’s implementation. The project will have a positive impact on the housing conditions of the children’s establishment, will significantly reduce the demand and use of heat in the spring of the ‘Spring’ facility. The project does not involve state aid. (English) / rank
 
Normal rank

Revision as of 07:23, 6 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermo-modernisation of the 3 buildings of the spring complex of the ‘Vyasna’ construction complex in Krzydline Małej
Project in Poland financed by DG Regio

    Statements

    0 references
    2,791,007.62 zloty
    0 references
    669,841.8288 Euro
    13 January 2020
    0 references
    3,283,538.37 zloty
    0 references
    788,049.2088 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    12 July 2016
    0 references
    31 July 2019
    0 references
    ZGROMADZENIE SIÓSTR SZKOLNYCH DE NOTRE DAME PROWINCJA POLSKA
    0 references
    Przedmiotowy projekt polega na modernizacji energetycznej 3 budynków należących do Wielofunkcyjnej Placówki Opiekuńczo-Wychowawczej „Wiosna” (zwana dalej WPO-W „Wiosna” lub Dom dziecka „Wiosna”) mieszczącej się w Krzydlinie Małej na terenie gminy Wołów, a także na przeprowadzeniu działań dodatkowych. Zakres modernizacji, jej parametry techniczne i ekonomiczne, określone zostały w przeprowadzonym audycie energetycznym. Prace modernizacyjne będą polegały na modernizacji energetycznej dolnego źródła energii, maszynowni pomp ciepła i wymianie źródła ciepła, instalacji c.o., instalacji wody ciepłej i zimnej, modernizacji energetycznej systemu wentylacji oraz termomodernizacji 3 budynków: A, B i C oraz łącznika między obiektem A i B - polegającej na: wymianie okien, dociepleniu ścian i dachów. Działania dodatkowe oparte będą o następujące koszty: - przygotowanie dokumentacji projektu w postaci studium wykonalności - zarządzanie projektem przez wykwalifikowaną firmę zewnętrzną - działania informacyjno-promocyjne projektu. Beneficjentem projektu jest Zgromadzenie Sióstr Szkolnych de Notre Dame Prowincja Polska, a Operatorem projektu jest Wielofunkcyjna Placówka Opiekuńczo-Wychowawcza „Wiosna” prowadzona przez powyższe Zgromadzenie w Krzydlinie Małej. Podmiot ten będzie koordynował wszelkie prace związane z przygotowaniem, złożeniem, wdrożeniem wniosku, a następnie monitorowaniem i rozliczeniem projektu. Za pomoc w prawidłowym zarządzaniu projektem odpowiedzialna będzie firma zewnętrzna. Odbiorcami projektu będą mieszkańcy gminy Wołów, Wielofunkcyjna Placówka Opiekuńczo-Wychowawcza „Wiosna”, a bezpośrednio z efektów realizacji projektu skorzystają dzieci zamieszkujące Dom Dziecka „Wiosna”, a także jej pracownicy. Projekt wpłynie pozytywnie na warunki mieszkaniowe znajdujących się w placówce dzieci, zapewni znaczne zmniejszenie zapotrzebowania i zużycia energii cieplnej w obiektach placówki „Wiosna”. W ramach projektu nie występuje pomoc publiczna. (Polish)
    0 references
    The project consists of an energy modernisation of the 3 buildings belonging to the ‘Spring’ multi-functional “Spring” (hereinafter referred to as the “Spring” or “Spring”), which is located in the ‘Spring’ of the municipality of Wolin, as well as additional activities. The scope, technical and economic parameters of the upgrade have been identified in the energy audit carried out. The modernisation works will consist of energy modernisation of the lower source of energy, the engine room heat pumps and the replacement of the heat source, the heating system, the hot and cold water installations, the modernisation of the energy ventilation system and the thermal modernisation of the 3 buildings: A, B and C and the connecting factor between object A and B: replacement of windows, thermal wall and roof insulation. The additional activities will be based on the following costs: Preparation of project documentation in the form of a feasibility study — project management by a qualified external company — information and promotional activities of the project. The beneficiary of the project is the Assembly of the School of School Province of Notre Dame Province, Poland and the project operator of the project is the multifunction facility led by the above-mentioned Assembly in the Małopolskie Province. This body will coordinate any work relating to the preparation, submission, implementation and subsequent project monitoring and settlement. The external contractor will be responsible for assisting in the proper management of the project. The beneficiaries of the project will be the inhabitants of the municipality of Wolow, the multi-facetted establishment of the ‘Viasna’, and the children of the ‘Spring’ Children of the Children’s House, as well as its workers, will benefit directly from the project’s implementation. The project will have a positive impact on the housing conditions of the children’s establishment, will significantly reduce the demand and use of heat in the spring of the ‘Spring’ facility. The project does not involve state aid. (English)
    0 references