Reconstruction of the rockfall S4 of the Siede in Siedenburg. (Q3309271): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q3374922 / rank | |||
Normal rank |
Revision as of 15:56, 26 October 2021
Project Q3309271 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the rockfall S4 of the Siede in Siedenburg. |
Project Q3309271 in Germany |
Statements
645.98 Euro
0 references
129,195.01 Euro
0 references
0.5 percent
0 references
1 July 2018
0 references
31 December 2019
0 references
ULV Große Aue
0 references
Zur Herstellung der faunistischen Durchgängigkeit in der Siede soll der Sohlabsturz S4 zu einem Raugerinne mit Beckenstruktur umgebaut werden. (German)
0 references
In order to produce the faunistic continuity in the boiling point, the S4 rockfall is to be converted into a roughing gutter with a pelvic structure. (English)
24 October 2021
0 references
Diepholz
0 references
Identifiers
DE_TEMPORARY_12056
0 references