Water and wastewater management in Gmina Zielonka — Stage IV (Q85458): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): A project carried out within the boundaries of Kraków with a size of 918 288 p.e. in Brzozówka, Bibice, Wola Zachariaszowska, Owczona, Zielonka, Boscut, Grębynice, Garlica Murowana, Januszowice, Przybyławice, Węglowe and Batowice located in the Municipality of Zielonka.The scope shall include the following:— construction of a sanitary sewerage network of about 32.75 km — construction of a sewerage network of approximately 1.30 km — construction...) |
||
Property / summary | |||
A project carried out within the boundaries of Kraków with a size of 918 288 p.e. in Brzozówka, Bibice, Wola Zachariaszowska, Owczona, Zielonka, Boscut, Grębynice, Garlica Murowana, Januszowice, Przybyławice, Węglowe and Batowice located in the Municipality of Zielonka.The scope shall include the following:— construction of a sanitary sewerage network of about 32.75 km — construction of a sewerage network of approximately 1.30 km — construction of a water mains network of 1.73 km in length — replacement of water mains network, execution of spinaches and transmission of water mains of 0.92 km — exchange of unfit hydrants on the water supply system — performance of network points in the water supply network, including transmission of data forming part of the extension of the monitoring system — 6 points — upgrade of the water treatment station in Batowice-to the sewerage system to be used for cleaning the sewage system. the number of new users of the sewerage system who connect to the network as a result of the project — 2 686 p.e.Number of new users of the water network that connect to the grid as a result of the project — 45 Mk. (English) | |||
Property / summary: A project carried out within the boundaries of Kraków with a size of 918 288 p.e. in Brzozówka, Bibice, Wola Zachariaszowska, Owczona, Zielonka, Boscut, Grębynice, Garlica Murowana, Januszowice, Przybyławice, Węglowe and Batowice located in the Municipality of Zielonka.The scope shall include the following:— construction of a sanitary sewerage network of about 32.75 km — construction of a sewerage network of approximately 1.30 km — construction of a water mains network of 1.73 km in length — replacement of water mains network, execution of spinaches and transmission of water mains of 0.92 km — exchange of unfit hydrants on the water supply system — performance of network points in the water supply network, including transmission of data forming part of the extension of the monitoring system — 6 points — upgrade of the water treatment station in Batowice-to the sewerage system to be used for cleaning the sewage system. the number of new users of the sewerage system who connect to the network as a result of the project — 2 686 p.e.Number of new users of the water network that connect to the grid as a result of the project — 45 Mk. (English) / rank | |||
Normal rank |
Revision as of 10:13, 4 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Water and wastewater management in Gmina Zielonka — Stage IV |
Project in Poland financed by DG Regio |
Statements
17,546,108.4 zloty
0 references
35,013,114.26 zloty
0 references
85.0 percent
0 references
30 June 2016
0 references
31 December 2022
0 references
GMINA ZIELONKI
0 references
Projekt realizowany w granicach aglomeracji Kraków o wielkości 918 288 RLM w miejscowościach Brzozówka, Bibice, Wola Zachariaszowska, Owczary, Zielonki, Bosutów, Grębynice, Garlica Murowana, Januszowice, Przybysławice, Węgrzce i Batowice położonych na terenie Gminy Zielonki. Zakres obejmuje: - budowę sieci kanalizacji sanitarnej o długości około 32,75 km - budowę sieci kanalizacji deszczowej o długości około 1,30 km - budowę sieci wodociągowej o długości 1,73 km - wymianę sieci wodociągowej, wykonanie spinek i przepięć sieci wodociągowej o długości 0,92 km - wymianę niesprawnych hydrantów na sieci wodociągowej - wykonanie sieciowych punktów pomiarowych na sieci wodociągowej wraz z transmisją danych będących częścią rozbudowy systemu monitoringu – 6 punktów - modernizację Stacji Uzdatniania Wody w Batowicach - dostawę samochodu specjalistycznego do czyszczenia sieci kanalizacyjnej Liczba nowych użytkowników sieci kanalizacyjnej, którzy przyłączą się do sieci w wyniku realizacji projektu - 2 686 RLM. Liczba nowych użytkowników sieci wodociągowej, którzy przyłączą się do sieci w wyniku realizacji projektu – 45 Mk. (Polish)
0 references
A project carried out within the boundaries of Kraków with a size of 918 288 p.e. in Brzozówka, Bibice, Wola Zachariaszowska, Owczona, Zielonka, Boscut, Grębynice, Garlica Murowana, Januszowice, Przybyławice, Węglowe and Batowice located in the Municipality of Zielonka.The scope shall include the following:— construction of a sanitary sewerage network of about 32.75 km — construction of a sewerage network of approximately 1.30 km — construction of a water mains network of 1.73 km in length — replacement of water mains network, execution of spinaches and transmission of water mains of 0.92 km — exchange of unfit hydrants on the water supply system — performance of network points in the water supply network, including transmission of data forming part of the extension of the monitoring system — 6 points — upgrade of the water treatment station in Batowice-to the sewerage system to be used for cleaning the sewage system. the number of new users of the sewerage system who connect to the network as a result of the project — 2 686 p.e.Number of new users of the water network that connect to the grid as a result of the project — 45 Mk. (English)
0 references
Identifiers
POIS.02.03.00-00-0217/16
0 references