Redevelopment and extension of the urban waste water treatment plant (Q85345): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): The project involves the reconstruction and extension of the existing sewage treatment plant in Chazele.The investment will include the following technologiczne:punkt water catchment, water catchment, a sieve with an averaging tank, a technology building, a WF compartment, a sediment tank, a sediment storage site, a biofilter, a biogas derivative, a biogas compression station, a gas compression station.The project used the stabilisation of sedim...) |
||
Property / summary | |||
The project involves the reconstruction and extension of the existing sewage treatment plant in Chazele.The investment will include the following technologiczne:punkt water catchment, water catchment, a sieve with an averaging tank, a technology building, a WF compartment, a sediment tank, a sediment storage site, a biofilter, a biogas derivative, a biogas compression station, a gas compression station.The project used the stabilisation of sediment under anaerobic conditions to reduce the mass of the sediment. the treatment of waste water was linked to the automation of the treatment of the treatment plants.This ensures a high reduction in pollution by reducing the nuisance of the treatment plant.The project will increase the capacity of the plant. this will allow the new users to connect to the sewerage system, i.e. to increase the scale of the affected rivers.The aim of the project is to adapt the existing treatment plant to the requirements of Council Directive 91/271/EEC and of 18 November 2014 (Journal of Laws 2014, item 1800) on the conditions to be met when discharging waste water to waters or soil and on substances which are particularly harmful to the aquatic environment.It will increase the capacity of the wastewater treatment plant in Chzele.The current capacity of the plant is 1 500 m³/d. (English) | |||
Property / summary: The project involves the reconstruction and extension of the existing sewage treatment plant in Chazele.The investment will include the following technologiczne:punkt water catchment, water catchment, a sieve with an averaging tank, a technology building, a WF compartment, a sediment tank, a sediment storage site, a biofilter, a biogas derivative, a biogas compression station, a gas compression station.The project used the stabilisation of sediment under anaerobic conditions to reduce the mass of the sediment. the treatment of waste water was linked to the automation of the treatment of the treatment plants.This ensures a high reduction in pollution by reducing the nuisance of the treatment plant.The project will increase the capacity of the plant. this will allow the new users to connect to the sewerage system, i.e. to increase the scale of the affected rivers.The aim of the project is to adapt the existing treatment plant to the requirements of Council Directive 91/271/EEC and of 18 November 2014 (Journal of Laws 2014, item 1800) on the conditions to be met when discharging waste water to waters or soil and on substances which are particularly harmful to the aquatic environment.It will increase the capacity of the wastewater treatment plant in Chzele.The current capacity of the plant is 1 500 m³/d. (English) / rank | |||
Normal rank |
Revision as of 10:09, 4 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Redevelopment and extension of the urban waste water treatment plant |
Project in Poland financed by DG Regio |
Statements
9,417,208.65 zloty
0 references
20,604,968.61 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 December 2020
0 references
GMINA CHORZELE
0 references
Projekt obejmuje przebudowę i rozbudowę istniejącej oczyszczalni ścieków w Chorzelach. W ramach inwestycji wykonane zostaną następujące obiekty technologiczne:punkt zlewny ścieków,sito ze zbiornikiem uśredniającym,budynek technologiczny, komora WKF,zbiornik osadu,plac składowania osadu,biofiltr,pochodnia biogazowa,odsiarczalnia biogazu,stacja sprężania gazu. W projekcie zastosowano stabilizację osadów w warunkach beztlenowych pozwalającą na zmniejszenie masy osadu.Rozwiązano zagadnienia oczyszczania ścieków przy automatyzacji pracy oczyszczalni. Gwarantuje to wysoką redukcję zanieczyszczeń ograniczając uciążliwość oczyszczalni. Projekt pozwoli na zwiększenie przepustowości oczyszczalni.Dzięki temu będzie możliwość podłączenia nowych użytkowników kanalizacji tj. zwiększenie stopnia skanalizowani woj.mazowieckiego. Celem projektu jest dostosowanie istniejącej oczyszczalni do wymogów Dyrektywy Rady91/271/EWG i Rozp. z dnia 18 listopada 2014r.(Dz.U.2014 poz.1800)w sprawie warunków,jakie należy spełnić przy wprowadzaniu ścieków do wód lub ziemi,oraz w sprawie substancji szczególnie szkodliwych dla środowiska wodnego. Zwiększy się wydajność oczyszczalni ścieków w miejscowości Chorzele. Aktualna przepustowość oczyszczalni wynosi 1500m3/d. (Polish)
0 references
The project involves the reconstruction and extension of the existing sewage treatment plant in Chazele.The investment will include the following technologiczne:punkt water catchment, water catchment, a sieve with an averaging tank, a technology building, a WF compartment, a sediment tank, a sediment storage site, a biofilter, a biogas derivative, a biogas compression station, a gas compression station.The project used the stabilisation of sediment under anaerobic conditions to reduce the mass of the sediment. the treatment of waste water was linked to the automation of the treatment of the treatment plants.This ensures a high reduction in pollution by reducing the nuisance of the treatment plant.The project will increase the capacity of the plant. this will allow the new users to connect to the sewerage system, i.e. to increase the scale of the affected rivers.The aim of the project is to adapt the existing treatment plant to the requirements of Council Directive 91/271/EEC and of 18 November 2014 (Journal of Laws 2014, item 1800) on the conditions to be met when discharging waste water to waters or soil and on substances which are particularly harmful to the aquatic environment.It will increase the capacity of the wastewater treatment plant in Chzele.The current capacity of the plant is 1 500 m³/d. (English)
0 references