Integrated System of Transportation in Agglomeration and in Wrocław-Stage III A (Q86073): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): Construction of a tramway track with the necessary collision construction.Reconstruction of the railway viaduct for the purpose of the route in ul.Long.Multi-screen design (road, track, telecommunications, electrical, water, bridge, etc.), Adding English summary)
Property / summary
 
Construction of a tramway track with the necessary collision construction.Reconstruction of the railway viaduct for the purpose of the route in ul.Long.Multi-screen design (road, track, telecommunications, electrical, water, bridge, etc.) (English)
Property / summary: Construction of a tramway track with the necessary collision construction.Reconstruction of the railway viaduct for the purpose of the route in ul.Long.Multi-screen design (road, track, telecommunications, electrical, water, bridge, etc.) (English) / rank
 
Normal rank

Revision as of 10:09, 4 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Integrated System of Transportation in Agglomeration and in Wrocław-Stage III A
Project in Poland financed by DG Regio

    Statements

    0 references
    96,740,853.0 zloty
    0 references
    23,217,804.72 Euro
    13 January 2020
    0 references
    268,815,635.4 zloty
    0 references
    64,515,752.49599999 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    4 September 2015
    0 references
    30 June 2023
    0 references
    GMINA WROCŁAW
    0 references

    51°7'34.7"N, 16°58'41.5"E
    0 references
    Budowa torowiska tramwajowego wraz z niezbędną przebudową kolizyjnego uzbrojenia. Przebudowa wiaduktu kolejowego na potrzeby trasy w ul. Długiej. Projekt wielobranżowy (branża drogowa, torowa, teletechniczna, elektryczna, wod-kan, mostowa itp..) (Polish)
    0 references
    Construction of a tramway track with the necessary collision construction.Reconstruction of the railway viaduct for the purpose of the route in ul.Long.Multi-screen design (road, track, telecommunications, electrical, water, bridge, etc.) (English)
    0 references

    Identifiers

    POIS.06.01.00-00-0026/16
    0 references